메뉴 건너뛰기




Volumn 2014, Issue , 2014, Pages

An innovative time-Cost-Quality tradeoff modeling of building construction project based on resource allocation

Author keywords

[No Author keywords available]

Indexed keywords

ARTICLE; BUILDING; BUILDING MATERIAL; CONSTRUCTION WORK; COST; GENETIC ALGORITHM; MANAGER; PRODUCTIVITY; QUALITY CONTROL; RESOURCE ALLOCATION; TIME MANAGEMENT; WORK; BUILDING INDUSTRY; ORGANIZATION; TASK PERFORMANCE; THEORETICAL MODEL;

EID: 84898848300     PISSN: None     EISSN: 1537744X     Source Type: Journal    
DOI: 10.1155/2014/673248     Document Type: Article
Times cited : (42)

References (18)
  • 1
    • 77955276594 scopus 로고    scopus 로고
    • A decomposition-Based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
    • E. Klerides and E. Hadjiconstantinou, "A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations," Computers and Operations Research, vol. 37, no. 12, pp. 2131-2140, 2010.
    • (2010) Computers and Operations Research , vol.37 , Issue.12 , pp. 2131-2140
    • Klerides, E.1    Hadjiconstantinou, E.2
  • 2
    • 80052793024 scopus 로고    scopus 로고
    • Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects
    • M. E. Bayraktar, M. Hastak, S. Gokhale, and B. Safi, "Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects," Journal of Construction Engineering and Management, vol. 137, no. 9, pp. 645-655, 2011.
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.9 , pp. 645-655
    • Bayraktar, M.E.1    Hastak, M.2    Gokhale, S.3    Safi, B.4
  • 3
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • C.-W. Feng, L. Liu, and S. A. Burns, "Using genetic algorithms to solve construction time-cost trade-off problems," Journal of Computing in Civil Engineering, vol. 11, no. 3, pp. 184-189, 1997. (Pubitemid 127590539)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 4
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(168)
    • D. X. M. Zheng, S. T. Ng, and M. M. Kumaraswamy, "Applying a genetic algorithm-based multiobjective approach for timecost optimization," Journal of Construction Engineering and Management, vol. 130, no. 2, pp. 168-176, 2004. (Pubitemid 40265383)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 5
    • 38149009704 scopus 로고    scopus 로고
    • Applying an ant colony optimization algorithm-based multiobjective approach for time-cost tradeoff
    • Y. Xiong and Y. Kuang, "Applying an ant colony optimization algorithm-based multiobjective approach for time-cost tradeoff," Journal of Construction Engineering and Management, vol. 134, no. 2, pp. 153-156, 2008.
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.2 , pp. 153-156
    • Xiong, Y.1    Kuang, Y.2
  • 6
    • 34250644399 scopus 로고    scopus 로고
    • Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis
    • DOI 10.1061/(ASCE)0733-9364(2007)133:7(498)
    • I.-T.Yang, "Using elitist particle swarmoptimization to facilitate bicriterion time-cost trade-off analysis," Journal of Construction Engineering andManagement, vol. 133, no. 7, pp. 498-505, 2007. (Pubitemid 46935013)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.7 , pp. 498-505
    • Yang, I.-T.1
  • 7
    • 77952950281 scopus 로고    scopus 로고
    • Multiobjective optimization of time-Cost tradeoff using harmony search
    • Z. W. Geem, "Multiobjective optimization of time-cost tradeoff using harmony search," Journal of Construction Engineering and Management, vol. 136, no. 6, pp. 711-716, 2010.
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.6 , pp. 711-716
    • Geem, Z.W.1
  • 8
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost, and quality considerations
    • DOI 10.1016/0377-2217(94)00202-9
    • A. J. G. Babu and N. Suresh, "Project management with time, cost, and quality considerations," European Journal of Operational Research, vol. 88, no. 2, pp. 320-327, 1996. (Pubitemid 126378090)
    • (1996) European Journal of Operational Research , vol.88 , Issue.2 , pp. 320-327
    • Babu, A.J.G.1    Suresh, N.2
  • 9
    • 0033177842 scopus 로고    scopus 로고
    • Time, cost and quality trade-Off in project management: A case study
    • D. B. Khang and Y. M. Myint, "Time, cost and quality trade-off in project management: a case study," International Journal of Project Management, vol. 17, no. 4, pp. 249-256, 1999.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 249-256
    • Khang, D.B.1    Myint, Y.M.2
  • 10
    • 33750488440 scopus 로고    scopus 로고
    • On the discrete time, cost and quality trade-off problem
    • DOI 10.1016/j.amc.2006.02.029, PII S0096300306002499
    • H. R. Tareghian and S. H. Taheri, "On the discrete time, cost and quality trade-off problem," Applied Mathematics and Computation, vol. 181, no. 2, pp. 1305-1312, 2006. (Pubitemid 44646603)
    • (2006) Applied Mathematics and Computation , vol.181 , Issue.2 , pp. 1305-1312
    • Tareghian, H.R.1    Taheri, S.H.2
  • 11
    • 15944361924 scopus 로고    scopus 로고
    • Time-cost-quality trade-off analysis for highway construction
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(477)
    • K. El-Rayes andA.Kandil, "Time-cost-quality trade-off analysis for highway construction," Journal of Construction Engineering and Management, vol. 131, no. 4, pp. 477-486, 2005. (Pubitemid 40430144)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 477-486
    • El-Rayes, K.1    Kandil, A.2
  • 12
    • 0003826055 scopus 로고    scopus 로고
    • ICC (International Code Council),International Code Council,USA
    • ICC (International Code Council), International Building Code, International Code Council, USA, 2009.
    • (2009) International Building Code
  • 14
    • 34248991928 scopus 로고
    • Wage inequities, productivity and work quality, industrial relations
    • J. S. Adams, "Wage inequities, productivity and work quality, industrial relations," A Journal of Economy and Society, vol. 3, no. 1, pp. 9-16, 1963.
    • (1963) A Journal of Economy and Society , vol.3 , Issue.1 , pp. 9-16
    • Adams, J.S.1
  • 16
    • 0000849119 scopus 로고    scopus 로고
    • Scheduled overtime and labor productivity: Quantitative analysis
    • H. R.Thomas and K. A. Raynar, "Scheduled overtime and labor productivity: quantitative analysis," Journal of Construction Engineering and Management, vol. 123, no. 2, pp. 181-188, 1997. (Pubitemid 127598590)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.2 , pp. 181-188
    • Thomas, H.R.1    Raynar, K.A.2
  • 17
    • 84962968942 scopus 로고
    • An instrument for measuring the critical factors of quality management
    • J.V. Saraph, P. G. Benson, and R. G. Schroeder, "An instrument for measuring the critical factors of quality management," Decision Sciences, vol. 20, no. 4, pp. 810-829, 1989.
    • (1989) Decision Sciences , vol.20 , Issue.4 , pp. 810-829
    • Saraph, J.V.1    Benson, P.G.2    Schroeder, R.G.3
  • 18
    • 0030305479 scopus 로고    scopus 로고
    • Human resource management, manufacturing strategy, and firm performance
    • M. A. Youndt, S. A. Snell, J. W. Dean Jr., and D. P. Lepak, "Human resource management, manufacturing strategy, and firm performance," The Academy of Management Journal, vol. 39, no. 4, pp. 836-866, 1996.
    • (1996) The Academy of Management Journal , vol.39 , Issue.4 , pp. 836-866
    • Youndt, M.A.1    Snell, S.A.2    Dean Jr., J.W.3    Lepak, D.P.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.