-
1
-
-
0031705846
-
Factors affecting contractors' risk of cost overburden
-
Akinci, B., and Fischer, M. (1998). Factors affecting contractors' risk of cost overburden. J. Constr. Eng. Manage. JCEMD4 0733-9364, 14, (1), 67-76. (Pubitemid 128633455)
-
(1998)
Journal of Management in Engineering
, vol.14
, Issue.1
, pp. 67-76
-
-
Akinci, B.1
Fischer, M.2
-
2
-
-
0028467091
-
Improving project management of design
-
JMENEA 0742-597X,. 10.1061/(ASCE)9742-597X(1994)10:4(35)
-
Anderson, S. D., and Tucker, R. L. (1994). Improving project management of design..'' J. Manage. Eng. JMENEA 0742-597X, 10 (4), 35-44. 10.1061/(ASCE)9742-597X(1994)10:4(35)
-
(1994)
J. Manage. Eng.
, vol.10
, Issue.4
, pp. 35-44
-
-
Anderson, S.D.1
Tucker, R.L.2
-
4
-
-
0033690430
-
Probabilistic monitoring of project performance using SS-curves
-
JCEMD4 0733-9364,. 10.1061/(ASCE)0733-9364(2000)126:2(142)
-
Barraza, G. A., Back, E., and Mata, F. (2000). Probabilistic monitoring of project performance using SS-curves. J. Constr. Eng. Manage. JCEMD4 0733-9364, 126 (2), 142-148. 10.1061/(ASCE)0733-9364(2000)126:2(142)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.2
, pp. 142-148
-
-
Barraza, G.A.1
Back, E.2
Mata, F.3
-
5
-
-
4243870005
-
-
Ph.D. dissertation, Dept. of Civil Engineering, Univ. of California, Berkeley, CA
-
Chang, A. S. (1997). Consultant performance measurement and evaluation for on-call projects. Ph.D. dissertation, Dept. of Civil Engineering, Univ. of California, Berkeley, CA.
-
(1997)
Consultant Performance Measurement and Evaluation for On-call Projects
-
-
Chang, A.S.1
-
6
-
-
0036162657
-
Reasons for cost and schedule increase for engineering design projects
-
DOI 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
Chang, A. S. (2002). Reasons for cost and schedule increase for engineering design projects. J. Manage. Eng. JMENEA 0742-597X, 18 (1), 29-36. 10.1061/(ASCE)0742-597X(2002)18:1(29) (Pubitemid 34125201)
-
(2002)
Journal of Management in Engineering
, vol.18
, Issue.1
, pp. 29-36
-
-
Chang, A.S.-T.1
-
7
-
-
0003747807
-
-
Construction Industry Institute (CII). Publication 3-1, Univ. of Texas, Austin, TX
-
Construction Industry Institute (CII). (1986 a). Constructability: A primer. Publication 3-1, Univ. of Texas, Austin, TX.
-
(1986)
Constructability: A Primer
-
-
-
9
-
-
0008284319
-
-
CII. (c). Publication 8-1, Univ. of Texas, Austin, TX
-
CII. (1986 c). Evaluation of design effectiveness. Publication 8-1, Univ. of Texas, Austin, TX.
-
(1986)
Evaluation of Design Effectiveness
-
-
-
11
-
-
6644224836
-
-
CII. Summary Document 28, Univ. of Texas, Austin, TX
-
CII. (1987 b). Work packaging for project control. Summary Document 28, Univ. of Texas, Austin, TX.
-
(1987)
Work Packaging for Project Control
-
-
-
12
-
-
0006921887
-
-
CII. Research Summary 6-7, Univ. of Texas, Austin, TX
-
CII. (1988). Concepts and methods of schedule compression. Research Summary 6-7, Univ. of Texas, Austin, TX.
-
(1988)
Concepts and Methods of Schedule Compression
-
-
-
13
-
-
80052818694
-
-
CII. Research Re 37-1, Univ. of Texas, Austin, TX
-
CII. (1992). Team building: Improving project performance. Research Rep. 37-1, Univ. of Texas, Austin, TX.
-
(1992)
Team Building: Improving Project Performance
-
-
-
16
-
-
15844429113
-
-
CII. Research Summary 113-1, Univ. of Texas, Austin, TX
-
CII. (1997 a). Preproject planning tools: PDRI and alignment. Research Summary 113-1, Univ. of Texas, Austin, TX.
-
(1997)
Preproject Planning Tools: PDRI and Alignment
-
-
-
18
-
-
80052816133
-
-
CII. (c). Research Summary 112-1, Univ. of Texas, Austin, TX
-
CII. (1997 c). 2% engineering-Can it work for you? Research Summary 112-1, Univ. of Texas, Austin, TX.
-
(1997)
2% Engineering-Can It Work for You?
-
-
-
20
-
-
34248524449
-
-
CII. Research Re 124-11, Univ. of Texas, Austin, TX
-
CII. (2000). Reengineering the EPC process. Research Rep. 124-11, Univ. of Texas, Austin, TX.
-
(2000)
Reengineering the EPC Process
-
-
-
21
-
-
0033705228
-
Benefits of small projects team initiative
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2000)126:1(22)
-
Dunston, P. S., and Reed, A. G. (2000). Benefits of small projects team initiative. J. Constr. Eng. Manage., 126 (1), 22-28. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2000)126:1(22)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.1
, pp. 22-28
-
-
Dunston, P.S.1
Reed, A.G.2
-
22
-
-
33645708913
-
Five misunderstandings about case-study research
-
DOI 10.1177/1077800405284363
-
Flyvbjerg, B. (2006). Five misunderstandings about case-study research. Qual. Inq., 12 (2), 219-245. 1077-8004 10.1177/1077800405284363 (Pubitemid 43538853)
-
(2006)
Qualitative Inquiry
, vol.12
, Issue.2
, pp. 219-245
-
-
Flyvbjerg, B.1
-
23
-
-
0036319174
-
Underestimating costs in public works projects: Error or lie?
-
Flyvbjerg, B., Holm, M., and Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? J. Am. Plan. Assn., 68 (3), 279-295.
-
(2002)
J. Am. Plan. Assn.
, vol.68
, Issue.3
, pp. 279-295
-
-
Flyvbjerg, B.1
Holm, M.2
Buhl, S.3
-
24
-
-
34248547324
-
Relating cost growth from the initial estimate to design fee for transportation projects
-
DOI 10.1061/(ASCE)0733-9364(2007)133:6(404)
-
Gransberg, D. D., Lopez del Puerto, C., and Humphrey, D. (2007). Relating cost growth from the initial estimate versus design fee for transportation projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (6), 404-408. 10.1061/(ASCE)0733-9364(2007)133:6(404) (Pubitemid 46759481)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.6
, pp. 404-408
-
-
Gransberg, D.D.1
Lopez Del Puerto, C.2
Humphrey, D.3
-
26
-
-
0035366978
-
Risk factors affecting management and maintenance cost of urban infrastructure
-
DOI 10.1061/(ASCE)1076-0342(2001)7:2(67)
-
Hastak, M., and Earl J. Baim (2001). Risk factors affecting management and maintenance cost of urban infrastructure. J. Infrastruct. Syst. JITSE4 1076-0342, 7 (2), 67-76. 10.1061/(ASCE)1076-0342(2001)7:2(67) (Pubitemid 32548394)
-
(2001)
Journal of Infrastructure Systems
, vol.7
, Issue.2
, pp. 67-76
-
-
Hastak, M.1
Baim, E.J.2
-
27
-
-
80052798737
-
-
Research Re 214-11, Construction Industry Inst. (CII), Univ. of Texas, Austin, TX
-
Hastak M., Gokhale, S., Safi, B., and Bayraktar, M. E. (2006). Trade-off between cost and schedule. Research Rep. 214-11, Construction Industry Inst. (CII), Univ. of Texas, Austin, TX.
-
(2006)
Trade-off between Cost and Schedule
-
-
Hastak, M.1
Gokhale, S.2
Safi, B.3
Bayraktar, M.E.4
-
28
-
-
13944260870
-
Project delivery systems and project change: Quantitative analysis
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(382)
-
Ibbs, W., Kwak, Y., Ng, T., and Odabasi, M. (2003). Project delivery systems and project change: Quantitative analysis. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 382-387. 10.1061/(ASCE)0733-9364(2003)129:4(382) (Pubitemid 40265451)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 382-387
-
-
Ibbs, C.W.1
Kwak, Y.H.2
Ng, T.3
Murat Odabasi, A.4
-
30
-
-
42549083736
-
Construction process reengineering by integrating lean principles and computer simulation techniques
-
DOI 10.1061/(ASCE)0733-9364(2008)134:5(371)
-
Mao, X., and Zhang, X. (2008). Construction process reengineering by integrating lean principles and computer simulation techniques. J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (5), 371-381. 10.1061/(ASCE)0733-9364(2008)134: 5(371) (Pubitemid 351578591)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.5
, pp. 371-381
-
-
Mao, X.1
Zhang, X.2
-
31
-
-
33947395204
-
On-site subcontractor evaluation method based on lean principles and partnering practices
-
DOI 10.1061/(ASCE)0742-597X(2007)23:2(67)
-
Maturana, S., Alarcon, L., Gazmuri, P., and Vrsalovic, M. (2007). On-site subcontractor evaluation method based on lean principles and partnering practices. J. Manage. Eng., 23 (2), 67-74. JMENEA 0742-597X 10.1061/(ASCE)0742- 597X(2007)23:2(67) (Pubitemid 46447982)
-
(2007)
Journal of Management in Engineering
, vol.23
, Issue.2
, pp. 67-74
-
-
Maturana, S.1
Alarcon, L.F.2
Gazmuri, P.3
Vrsalovic, M.4
-
32
-
-
14544291098
-
Programmatic cost risk analysis for highway megaprojects
-
DOI 10.1061/(ASCE)0733-9364(2005)131:3(343)
-
Molenaar, K. R. (2005). Programmatic cost risk analysis for highway mega-projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (3), 343-353. 10.1061/(ASCE)0733-9364(2005)131:3(343) (Pubitemid 40303942)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 343-353
-
-
Molenaar, K.R.1
-
33
-
-
69949097782
-
A risk-based approach to contingency estimation in highway project development
-
S. T. Ariaratnam and E. M. Rojas, eds., ASCE, Reston, VA
-
Molenaar, K. R., and Wilson, C. R. (2009). A risk-based approach to contingency estimation in highway project development. Proc., Construction Research Congr., S. T. Ariaratnam, and, E. M. Rojas, eds., ASCE, Reston, VA, 786-795.
-
(2009)
Proc., Construction Research Congr.
, pp. 786-795
-
-
Molenaar, K.R.1
Wilson, C.R.2
-
34
-
-
25944434956
-
-
McKinsey Global Institute (MGI). Research Re, McKinsey & Company, Washington, DC
-
McKinsey Global Institute (MGI). (2003). Competing in a value-driven world. Research Rep., McKinsey & Company, Washington, DC.
-
(2003)
Competing in A Value-driven World
-
-
-
35
-
-
33645514208
-
-
BPIC, Hove, UK, (Aug. 26, 2011)
-
Robinson, P. (2005). Business excellence-The integrated solution to planning and control. BPIC, Hove, UK, http://www.bpic.co.uk/clickbank.htm (Aug. 26, 2011).
-
(2005)
Business Excellence-The Integrated Solution to Planning and Control
-
-
Robinson, P.1
-
36
-
-
34247279276
-
Lean management model for construction of high-rise apartment buildings
-
DOI 10.1061/(ASCE)0733-9364(2007)133:5(374)
-
Sacks, R., and Goldin, M. (2007). Lean management model for construction of high-rise apartment buildings. J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (5), 374-384. 10.1061/(ASCE)0733-9364(2007)133:5(374) (Pubitemid 46610041)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Goldin, M.2
-
37
-
-
70349342801
-
Construction project cost escalation factors
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:4(221)
-
Shane, J., Molenaar, K., Anderson, S., and Schexnayder, C. (2009). Construction project cost escalation factors. J. Manage. Eng., 25 (4), 221-229. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:4(221)
-
(2009)
J. Manage. Eng.
, vol.25
, Issue.4
, pp. 221-229
-
-
Shane, J.1
Molenaar, K.2
Anderson, S.3
Schexnayder, C.4
-
38
-
-
84993768424
-
-
NCHRP synthesis of highway practice 137, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC
-
Sternbach, J. (1988). Negotiating and contracting for professional services. NCHRP synthesis of highway practice 137, National Cooperative Highway Research Program, Transportation Research Board, Washington, DC,.
-
(1988)
Negotiating and Contracting for Professional Services
-
-
Sternbach, J.1
-
39
-
-
69949090027
-
Constructing research with case studies
-
ASCE, Reston, VA
-
Taylor, J., Dossick, C., Garvin, M. (2009). Constructing research with case studies. Proc., Construction Research Congress, ASCE, Reston, VA.
-
(2009)
Proc., Construction Research Congress
-
-
Taylor, J.1
Dossick, C.2
Garvin, M.3
|