-
1
-
-
3242668644
-
Photo-net: An integrated system for controlling construction progress
-
Abeid, J. and Arditi, D. (2003), "Photo-net: an integrated system for controlling construction progress", Engineering, Construction and Architectural Management, Vol. 10 No. 3, pp. 162-171.
-
(2003)
Engineering, Construction and Architectural Management
, vol.10
, Issue.3
, pp. 162-171
-
-
Abeid, J.1
Arditi, D.2
-
2
-
-
0041825827
-
Photo-net II: A computer-based monitoring system applied to project management
-
Abeid, J., Allouche, E., Arditi, D. and Hayman, M. (2003), "Photo-net II: a computer-based monitoring system applied to project management", Automation in Construction, Vol. 12 No. 5, pp. 603-616.
-
(2003)
Automation in Construction
, vol.12
, Issue.5
, pp. 603-616
-
-
Abeid, J.1
Allouche, E.2
Arditi, D.3
Hayman, M.4
-
3
-
-
72149104769
-
Automated recognition of 3D CAD model objects and calculation of as-built dimensions for dimensional compliance control in construction
-
Bosché, F. (2010), "Automated recognition of 3D CAD model objects and calculation of as-built dimensions for dimensional compliance control in construction", Advanced Engineering Informatics, Vol. 24 No. 1, pp. 107-118.
-
(2010)
Advanced Engineering Informatics
, vol.24
, Issue.1
, pp. 107-118
-
-
Bosché, F.1
-
4
-
-
83555160969
-
Plane-based coarse registration of 3D laser scans with 4D models
-
Bosché, F. (2011), "Plane-based coarse registration of 3D laser scans with 4D models", Advanced Engineering Informatics, Vol. 26 No. 1, pp. 90-102.
-
(2011)
Advanced Engineering Informatics
, vol.26
, Issue.1
, pp. 90-102
-
-
Bosché, F.1
-
5
-
-
38649103110
-
Automated retrieval of 3D CAD model objects in construction range images
-
Bosché, F. and Haas, C.T. (2008), "Automated retrieval of 3D CAD model objects in construction range images", Automation in Construction, Vol. 17 No. 4, pp. 499-512.
-
(2008)
Automation in Construction
, vol.17
, Issue.4
, pp. 499-512
-
-
Bosché, F.1
Haas, C.T.2
-
6
-
-
84925199284
-
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
-
(in press)
-
Bosché, F., Guillemet, A., Turkan, Y., Haas, C.T. and Haas, R.G. (2013), "Tracking the built status of MEP works: assessing the value of a Scan-vs-BIM system", ASCE Journal of Computing in Civil Engineering (in press), available at: http://ascelibrary.org/doi/pdf/10.1061/%28ASCE%29CP.1943- 5487.0000343
-
(2013)
ASCE Journal of Computing in Civil Engineering
-
-
Bosché, F.1
Guillemet, A.2
Turkan, Y.3
Haas, C.T.4
Haas, R.G.5
-
7
-
-
0025814419
-
Object modeling by registration of multiple range images
-
Chen, Y. and Medioni, G. (1991), "Object modeling by registration of multiple range images", Proceedings of the International IEEE Conference on Robotics and Automation in Sacramento, CA, USA, pp. 2724-2729.
-
(1991)
Proceedings of the International IEEE Conference on Robotics and Automation in Sacramento, CA, USA
, pp. 2724-2729
-
-
Chen, Y.1
Medioni, G.2
-
8
-
-
0033703954
-
Ladars for construction assessment and update
-
Cheok, G.S., Stone, W.C., Lipman, R.R. and Witzgall, C. (2000), "Ladars for construction assessment and update", Automation in Construction, Vol. 9 No. 5, pp. 463-477.
-
(2000)
Automation in Construction
, vol.9
, Issue.5
, pp. 463-477
-
-
Cheok, G.S.1
Stone, W.C.2
Lipman, R.R.3
Witzgall, C.4
-
9
-
-
84897447359
-
-
Formwork Digest, Concrete Reinforcement Steel Institute, Schaumburg, IL
-
Formwork Digest (2000), Engineering Data Report No. 47, Concrete Reinforcement Steel Institute, Schaumburg, IL, p. 6.
-
(2000)
Engineering Data Report No. 47
, pp. 6
-
-
-
10
-
-
77956300459
-
Automated model-based recognition of progress using daily construction photographs and IFC-based 4D models
-
Golparvar-Fard, M., Peña-Mora, F. and Savarese, S. (2010), "Automated model-based recognition of progress using daily construction photographs and IFC-based 4D models", Proceedings of the ASCE Construction Research Congress in Banff, Alberta, Canada, pp. 51-61.
-
(2010)
Proceedings of the ASCE Construction Research Congress in Banff, Alberta, Canada
, pp. 51-61
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Savarese, S.3
-
11
-
-
84875049137
-
Automated progress monitoring using unordered daily construction photographs and IFC-based building information models
-
February
-
Golparvar-Fard, M., Peña-Mora, F. and Savarese, S. (2012), "Automated progress monitoring using unordered daily construction photographs and IFC-based building information models", ASCE Journal of Computing in Civil Engineering, February.
-
(2012)
ASCE Journal of Computing in Civil Engineering
-
-
Golparvar-Fard, M.1
Peña-Mora, F.2
Savarese, S.3
-
12
-
-
84888379241
-
As-built documentation of structural components for reinforced concrete construction quality control with 3D laser scanning
-
Hajian, H. and Brandow, G. (2012), "As-built documentation of structural components for reinforced concrete construction quality control with 3D laser scanning", Proceedings of ASCE Computing in Civil Engineering Workshop, pp. 253-260.
-
(2012)
Proceedings of ASCE Computing in Civil Engineering Workshop
, pp. 253-260
-
-
Hajian, H.1
Brandow, G.2
-
13
-
-
0006891334
-
-
Prentice-Hall, Upper Saddle River, NJ
-
Hegazy, T. (2002), Computer-Based Construction Project Management, Prentice-Hall, Upper Saddle River, NJ, pp. 289-316.
-
(2002)
Computer-Based Construction Project Management
, pp. 289-316
-
-
Hegazy, T.1
-
14
-
-
0005390616
-
-
7th ed., American Concrete Institute (ACI), Farmington Hills, MI
-
Hurd, M.K. (2005), Formwork for Concrete, 7th ed., American Concrete Institute (ACI), Farmington Hills, MI.
-
(2005)
Formwork for Concrete
-
-
Hurd, M.K.1
-
15
-
-
0347906918
-
-
Construction Press, New York, NY
-
Hurst, M.P. (1983), Formwork, Construction Press, New York, NY.
-
(1983)
Formwork
-
-
Hurst, M.P.1
-
16
-
-
57549093466
-
Towards automated progress assessment of workpackage components in construction projects using computer vision
-
Ibrahim, Y.M., Lukins, T.C., Zhang, X., Trucco, E. and Kaka, A.P. (2009), "Towards automated progress assessment of workpackage components in construction projects using computer vision", Advanced Engineering Informatics, Vol. 23 No. 1, pp. 93-103.
-
(2009)
Advanced Engineering Informatics
, vol.23
, Issue.1
, pp. 93-103
-
-
Ibrahim, Y.M.1
Lukins, T.C.2
Zhang, X.3
Trucco, E.4
Kaka, A.P.5
-
17
-
-
84884498810
-
Shape recognition with point clouds in rebars
-
Ishida, K., Kano, N. and Kimoto, K. (2012), "Shape recognition with point clouds in rebars", Gerontechnology Journal, Vol. 11 No. 2, pp. 89-96.
-
(2012)
Gerontechnology Journal
, vol.11
, Issue.2
, pp. 89-96
-
-
Ishida, K.1
Kano, N.2
Kimoto, K.3
-
18
-
-
79959260560
-
Revisiting the applicability of learning curve theory to formwork labour productivity
-
Jarkas, A. and Horner, M. (2011), "Revisiting the applicability of learning curve theory to formwork labour productivity", Construction Management and Economics, Vol. 29 No. 5, pp. 483-493.
-
(2011)
Construction Management and Economics
, vol.29
, Issue.5
, pp. 483-493
-
-
Jarkas, A.1
Horner, M.2
-
19
-
-
84871764113
-
Automated construction progress measurement using a 4D building information model and 3D data
-
Kim, C., Son, H. and Kim, C. (2013), "Automated construction progress measurement using a 4D building information model and 3D data", Automation in Construction, Vol. 31, pp. 75-82.
-
(2013)
Automation in Construction
, vol.31
, pp. 75-82
-
-
Kim, C.1
Son, H.2
Kim, C.3
-
20
-
-
84893323716
-
Automated pipeline extraction for modeling from laser scanned data
-
Lee, J., Kim, C., Son, H. and Kim, C.H. (2012), "Automated pipeline extraction for modeling from laser scanned data", Proceedings of International Symposium on Automation and Robotics in Construction (ISARC), Eindhoven, The Netherlands.
-
(2012)
Proceedings of International Symposium on Automation and Robotics in Construction (ISARC), Eindhoven, the Netherlands
-
-
Lee, J.1
Kim, C.2
Son, H.3
Kim, C.H.4
-
21
-
-
78751694596
-
An investigation of an image processing application for measurement of a quantity estimate of Euro form installed in construction sites
-
Lee, S., Oh, S., Hong, M. and Choi, J. (2010), "An investigation of an image processing application for measurement of a quantity estimate of Euro form installed in construction sites", Proceedings of the IEEE 5th International Conference on Ubiquitous Information Technologies and Applications, Sanya, China, pp. 1-5.
-
(2010)
Proceedings of the IEEE 5th International Conference on Ubiquitous Information Technologies and Applications, Sanya, China
, pp. 1-5
-
-
Lee, S.1
Oh, S.2
Hong, M.3
Choi, J.4
-
23
-
-
77951213469
-
Terrestrial laser scanning-based structural damage assessment
-
Olsen, M.J., Kuester, F., Chang, B.J. and Hutchinson, T.C. (2009), "Terrestrial laser scanning-based structural damage assessment", Journal of Computing in Civil Engineering, Vol. 24 No. 3, pp. 264-272.
-
(2009)
Journal of Computing in Civil Engineering
, vol.24
, Issue.3
, pp. 264-272
-
-
Olsen, M.J.1
Kuester, F.2
Chang, B.J.3
Hutchinson, T.C.4
-
24
-
-
0005495790
-
-
McGraw-Hill, New York, NY
-
Peurifoy, R.L. and Oberlender, G.D. (2011), Formwork for Concrete Structures, McGraw-Hill, New York, NY.
-
(2011)
Formwork for Concrete Structures
-
-
Peurifoy, R.L.1
Oberlender, G.D.2
-
25
-
-
84949236475
-
Efficient variants of the (ICP) algorithm
-
Rusinkiewicz, S. and Levoy, M. (2001), "Efficient variants of the (ICP) algorithm", Proceedings of the International Conference on 3D Digital Imaging and Modeling (3DIM) in Quebec City, Canada, pp. 145-152.
-
(2001)
Proceedings of the International Conference on 3D Digital Imaging and Modeling (3DIM) in Quebec City, Canada
, pp. 145-152
-
-
Rusinkiewicz, S.1
Levoy, M.2
-
26
-
-
30844462121
-
3D scan information management system for construction management
-
Shih, N.J. and Huang, S.T. (2006), "3D scan information management system for construction management", ASCE Journal of Construction Engineering and Management, Vol. 132 No. 2, pp. 134-142.
-
(2006)
ASCE Journal of Construction Engineering and Management
, vol.132
, Issue.2
, pp. 134-142
-
-
Shih, N.J.1
Huang, S.T.2
-
27
-
-
84857366510
-
Formalization of workflows for extracting bridge surveying goals from laser-scanned data
-
Tang, P. and Akinci, B. (2012), "Formalization of workflows for extracting bridge surveying goals from laser-scanned data", Automation in Construction, Vol. 22, pp. 306-319.
-
(2012)
Automation in Construction
, vol.22
, pp. 306-319
-
-
Tang, P.1
Akinci, B.2
-
28
-
-
80053148707
-
Efficient and effective quality assessment of As-Is building information models and 3D laser-scanned data
-
Tang, P., Anil, E., Akinci, B. and Huber, D. (2011), "Efficient and effective quality assessment of As-Is building information models and 3D laser-scanned data", Proceedings of ASCE International Workshop on Computing in Civil Engineering, Miami, FL.
-
(2011)
Proceedings of ASCE International Workshop on Computing in Civil Engineering, Miami, FL
-
-
Tang, P.1
Anil, E.2
Akinci, B.3
Huber, D.4
-
29
-
-
77956619234
-
Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques
-
Tang, P., Huber, D., Akinci, B., Lipman, R. and Lytle, A. (2010), "Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques", Automation in Construction, Vol. 19 No. 7, pp. 829-843.
-
(2010)
Automation in Construction
, vol.19
, Issue.7
, pp. 829-843
-
-
Tang, P.1
Huber, D.2
Akinci, B.3
Lipman, R.4
Lytle, A.5
-
30
-
-
84897401314
-
-
Trimble™, Trimble Navigation Limited, Dayton, OH
-
Trimble™ (2007a), GX 3D Laser Scanner Datasheet, Trimble Navigation Limited, Dayton, OH.
-
(2007)
GX 3D Laser Scanner Datasheet
-
-
-
31
-
-
84897440881
-
-
Trimble™, Trimble Navigation Limited, Dayton, OH
-
Trimble™ (2007b), RealWorks® Survey 6.1, Technical Notes, Trimble Navigation Limited, Dayton, OH.
-
(2007)
RealWorks® Survey 6.1, Technical Notes
-
-
-
32
-
-
83655204942
-
Towards automated progress tracking of erection of construction of concrete structures
-
Turkan, Y., Bosché, F., Haas, C.T. and Haas, R. (2010), "Towards automated progress tracking of erection of construction of concrete structures", Proceedings of Sixth International Conference on Innovation in Architecture, Engineering and Construction (AEC) in College State, PA, USA.
-
(2010)
Proceedings of Sixth International Conference on Innovation in Architecture, Engineering and Construction (AEC) in College State, PA, USA
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
33
-
-
84857370632
-
Automated progress tracking using 4D models and 3D sensing technologies
-
Turkan, Y., Bosché, F., Haas, C.T. and Haas, R. (2012), "Automated progress tracking using 4D models and 3D sensing technologies", Automation in Construction, Vol. 22, pp. 414-421.
-
(2012)
Automation in Construction
, vol.22
, pp. 414-421
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
34
-
-
84875026723
-
Toward automated earned value tracking using 3D imaging tools
-
Turkan, Y., Bosché, F., Haas, C.T. and Haas, R. (2013), "Toward automated earned value tracking using 3D imaging tools", ASCE Journal of Construction Engineering and Management, Vol. 139 No. 4, pp. 423-433.
-
(2013)
ASCE Journal of Construction Engineering and Management
, vol.139
, Issue.4
, pp. 423-433
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
35
-
-
84861552895
-
Automatic construction of 3D basic-semantic models of inhabited interiors using laser scanners and RFID sensors
-
Valero, E., Adán, A. and Cerrada, C. (2012a), "Automatic construction of 3D basic-semantic models of inhabited interiors using laser scanners and RFID sensors", Sensors, Vol. 12, pp. 5705-5724.
-
(2012)
Sensors
, vol.12
, pp. 5705-5724
-
-
Valero, E.1
Adán, A.2
Cerrada, C.3
-
36
-
-
84871677181
-
Automatic method for building indoor boundary models from dense point clouds collected by laser scanners
-
Valero, E., Adán, A. and Cerrada, C. (2012b), "Automatic method for building indoor boundary models from dense point clouds collected by laser scanners", Sensors, Vol. 12, pp. 16099-16115.
-
(2012)
Sensors
, vol.12
, pp. 16099-16115
-
-
Valero, E.1
Adán, A.2
Cerrada, C.3
-
37
-
-
73349118434
-
Object recognition in construction-site images using 3D CAD-based filtering
-
Wu, Y., Kim, H., Kim, C. and Han, S.H. (2010), "Object recognition in construction-site images using 3D CAD-based filtering", Journal of Computing in Civil Engineering, Vol. 24 No. 1, pp. 56-64.
-
(2010)
Journal of Computing in Civil Engineering
, vol.24
, Issue.1
, pp. 56-64
-
-
Wu, Y.1
Kim, H.2
Kim, C.3
Han, S.H.4
-
38
-
-
84873283130
-
Automatic creation of semantically rich 3D building models from laser scanner data
-
Xiong, X., Adan, A., Akinci, B. and Huber, D. (2013), "Automatic creation of semantically rich 3D building models from laser scanner data", Automation in Construction, Vol. 31, pp. 325-337.
-
(2013)
Automation in Construction
, vol.31
, pp. 325-337
-
-
Xiong, X.1
Adan, A.2
Akinci, B.3
Huber, D.4
-
39
-
-
58949088479
-
Automating progress measurement of construction projects
-
Zhang, X., Bakis, N., Lukins, T.C., Ibrahim, Y.M., Wu, S., Kagioglou, M., Aouad, G., Kaka, A.P. and Trucco, E. (2009), "Automating progress measurement of construction projects", Automation in Construction, Vol. 18 No. 3, pp. 294-301.
-
(2009)
Automation in Construction
, vol.18
, Issue.3
, pp. 294-301
-
-
Zhang, X.1
Bakis, N.2
Lukins, T.C.3
Ibrahim, Y.M.4
Wu, S.5
Kagioglou, M.6
Aouad, G.7
Kaka, A.P.8
Trucco, E.9
-
41
-
-
0026821209
-
A method for registration of 3-D shapes
-
Besl, P. and McKay, N. (1992), "A method for registration of 3-D shapes", Transactions of Pattern Analysis and Machine Intelligence (PAMI), Vol. 14 No. 2, pp. 239-256.
-
(1992)
Transactions of Pattern Analysis and Machine Intelligence (PAMI)
, vol.14
, Issue.2
, pp. 239-256
-
-
Besl, P.1
McKay, N.2
|