메뉴 건너뛰기




Volumn , Issue , 2012, Pages 253-260

As-built documentation of structural components for reinforced concrete construction quality control with 3D laser scanning

Author keywords

[No Author keywords available]

Indexed keywords

3D LASER SCANNING; CONSTRUCTION PROJECTS; CONSTRUCTION SITES; CONVENTIONAL METHODS; DIMENSIONAL QUALITY; POINT CLOUD DATA; PROJECT ELEMENTS; STRUCTURAL COMPONENT;

EID: 84888379241     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/9780784412343.0032     Document Type: Conference Paper
Times cited : (11)

References (13)
  • 1
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., and Park, K. "A Formalism for Utilization of Sensor Systems and Integrated Project Models for Active Construction Quality Control. " Automation in Construction 15 (2006): 124-138
    • (2006) Automation in Construction , vol.15 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 2
    • 72149104769 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD model objects and calculation of as-built dimensions for dimensional compliance control in construction
    • Bosché F., Haas T. C., Akinci B. " Automated recognition of 3D CAD model objects and calculation of as-built dimensions for dimensional compliance control in construction . " Advanced Engineering Informatics 24 (2009): 107-118
    • (2009) Advanced Engineering Informatics , vol.24 , pp. 107-118
    • Bosché, F.1    Haas, T.C.2    Akinci, B.3
  • 3
    • 38649103110 scopus 로고    scopus 로고
    • Automated retrieval of 3D CAD model objects in construction range images
    • Bosche, F., Haas, C. T. "Automated retrieval of 3D CAD model objects in construction range images. " Automation in Construction, 2008: 499-512
    • (2008) Automation in Construction , pp. 499-512
    • Bosche, F.1    Haas, C.T.2
  • 4
    • 77957258776 scopus 로고    scopus 로고
    • Toward automated generation of parametric BIMs based on hybrid video and laser svanning data
    • Brilakis, Ionasis, et al. "Toward automated generation of parametric BIMs based on hybrid video and laser svanning data. " Adanved Engineering Informatics, 2010: 456-465
    • (2010) Adanved Engineering Informatics , pp. 456-465
    • Brilakis, I.1
  • 5
    • 80053650754 scopus 로고    scopus 로고
    • Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques
    • Golparvar-Fard, Mani, Jeffrey Bohn, Jochen Teizer, Silvio Savarese, and Feniosky Pena-Mora. "Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques. " Automation in Construction, 2011
    • (2011) Automation in Construction
    • Golparvar-Fard, M.1    Bohn, J.2    Teizer, J.3    Savarese, S.4    Pena-Mora, F.5
  • 6
    • 69949104466 scopus 로고    scopus 로고
    • Interactive visual construction progress monitoring with d4ar-4d augmented reality-models
    • Seattle, WA
    • Golparvar-Fard, Mani, S Savarese, and Feniosky Pena-Mora. "Interactive Visual Construction Progress Monitoring with D4AR-4D Augmented Reality-models. " Construction Research Congress. Seattle, WA, 2009. 41-50
    • (2009) Construction Research Congress , pp. 41-50
    • Golparvar-Fard, M.1    Savarese, S.2    Pena-Mora, F.3
  • 7
    • 70350147321 scopus 로고    scopus 로고
    • A research outlook for real-time project information management by integrating advanced field data acquisition systems and building information modeling
    • Texas
    • Hajian, H. and Becerik, B. "A Research Outlook for Real-time Project Information Management by Integrating Advanced Field Data Acquisition Systems and Building Information Modeling. " ASCE International Workshop on Computing in Civil Engineering. Austin, Texas, 2009
    • (2009) ASCE International Workshop on Computing in Civil Engineering. Austin
    • Hajian, H.1    Becerik, B.2
  • 10
    • 77956386598 scopus 로고    scopus 로고
    • Bim for integration of automated real-time project constrol systems
    • Hwang, Seokyon, and Y Liu. "Bim for Integration of Automated Real-Time Project Constrol Systems. " Construction Research Congress. CRC, 2010
    • (2010) Construction Research Congress. CRC
    • Hwang, S.1    Liu, Y.2
  • 11
    • 79952624469 scopus 로고    scopus 로고
    • On-site visualization of building component erection enabled by integration of four-dimensional modeling and automated surveying
    • Liang, Xiong, Ming Lu, and Jian-Ping Zhang. "On-site visualization of building component erection enabled by integration of four-dimensional modeling and automated surveying. " Automation in Construction 20, no. 3 (2011): 236-246
    • (2011) Automation in Construction , vol.20 , Issue.3 , pp. 236-246
    • Liang, X.1    Lu, M.2    Zhang, J.3
  • 13
    • 85029029564 scopus 로고    scopus 로고
    • Building information modeling in construction: Current practices and their implications for construction engineering education
    • Louisville, KY: American Society for Engineering Education
    • Mutai, Anthony, and Stan Guidera. " Building information modeling in construction: Current practices and their implications for construction engineering education. " ASEE Annual Conference and Exposition. Louisville, KY: American Society for Engineering Education, 2010
    • (2010) ASEE Annual Conference and Exposition
    • Mutai, A.1    Guidera, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.