-
1
-
-
44649141842
-
Locating collection centers for incentive-dependent returns under a pick-up policy with capacitated vehicles
-
Aras, N., Aksen, D., & Tanugur, A. G. (2008). Locating collection centers for incentive-dependent returns under a pick-up policy with capacitated vehicles. European Journal of Operational Research, 191, 1223-1240.
-
(2008)
European Journal of Operational Research
, vol.191
, pp. 1223-1240
-
-
Aras, N.1
Aksen, D.2
Tanugur, A.G.3
-
2
-
-
0032187710
-
A two-level network for recycling sand: A case study
-
Barros, A. I., Dekker, R., & Scholten, V. (1998). A two-level network for recycling sand: A case study. European Journal of Operational Research, 110, 199-214.
-
(1998)
European Journal of Operational Research
, vol.110
, pp. 199-214
-
-
Barros, A.I.1
Dekker, R.2
Scholten, V.3
-
3
-
-
3142647690
-
Supply chain network configuration for product recovery
-
Beamon, B. M., & Fernandes, C. (2004). Supply chain network configuration for product recovery. Production Planning and Control, 15(3), 270-281.
-
(2004)
Production Planning and Control
, vol.15
, Issue.3
, pp. 270-281
-
-
Beamon, B.M.1
Fernandes, C.2
-
4
-
-
0000225043
-
Designing the green supply chain
-
Beamon, B. M. (1999). Designing the green supply chain. Logistics Information Management, 12(4), 332-342.
-
(1999)
Logistics Information Management
, vol.12
, Issue.4
, pp. 332-342
-
-
Beamon, B.M.1
-
5
-
-
0031162588
-
A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems
-
Chang, N. B., & Wang, S. F. (1997). A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems. Journal of Operation Research, 32, 303-321.
-
(1997)
Journal of Operation Research
, vol.32
, pp. 303-321
-
-
Chang, N.B.1
Wang, S.F.2
-
6
-
-
0033181091
-
Strategic planning of recycling drop-off stations by multi-objective programming
-
Chang, N. B., & Wei, Y. L. (1999). Strategic planning of recycling drop-off stations by multi-objective programming. Environmental Management, 24(2), 247-264.
-
(1999)
Environmental Management
, vol.24
, Issue.2
, pp. 247-264
-
-
Chang, N.B.1
Wei, Y.L.2
-
7
-
-
0013293971
-
Siting recycling drop-off stations in an urban area by genetic algorithm-based fuzzy multi-objective nonlinear programming modeling
-
Chang, N. B., & Wei, Y. L. (2000). Siting recycling drop-off stations in an urban area by genetic algorithm-based fuzzy multi-objective nonlinear programming modeling. Fuzzy Sets and Systems, 114(1), 133-149.
-
(2000)
Fuzzy Sets and Systems
, vol.114
, Issue.1
, pp. 133-149
-
-
Chang, N.B.1
Wei, Y.L.2
-
8
-
-
79960304591
-
Empowering systems analysis for solid waste management: challenges, trends and perspectives
-
Chang, N. B., Pires, A., & Martinho, G. (2011). Empowering systems analysis for solid waste management: challenges, trends and perspectives. Critical Reviews in Environmental Science and Technology, 41(16), 1449-1530.
-
(2011)
Critical Reviews in Environmental Science and Technology
, vol.41
, Issue.16
, pp. 1449-1530
-
-
Chang, N.B.1
Pires, A.2
Martinho, G.3
-
9
-
-
36849007473
-
A bi-objective reverse logistics network analysis for postsale service
-
Du, F., & Evans, G. W. (2008). A bi-objective reverse logistics network analysis for postsale service. Computers and Operations Research, 35, 2617-2634.
-
(2008)
Computers and Operations Research
, vol.35
, pp. 2617-2634
-
-
Du, F.1
Evans, G.W.2
-
10
-
-
0037410423
-
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
-
Dubois, D., Fargier, H., & Fortemps, P. (2003). Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research, 147, 231-252.
-
(2003)
European Journal of Operational Research
, vol.147
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
12
-
-
0040150526
-
The impact of product recovery on logistics network design
-
Fleischmann, M., Beullens, P., Bloemhof-ruwaard, J. M., & Wassenhove, L. (2001). The impact of product recovery on logistics network design. Production and Operations Management, 10, 156-173.
-
(2001)
Production and Operations Management
, vol.10
, pp. 156-173
-
-
Fleischmann, M.1
Beullens, P.2
Bloemhof-Ruwaard, J.M.3
Wassenhove, L.4
-
13
-
-
33845492812
-
Reverse logistics network design
-
R. Dekker, M. Fleischmann, K. Inderfurth, and L. N. WassenhoveVan (Eds.), Berlin: Springer
-
Fleischmann, M., Bloemhof-Ruwaard, J. M., Beullens, P., & Dekker, R. (2004). Reverse logistics network design. In R. Dekker, M. Fleischmann, K. Inderfurth, & L. N. van Wassenhove (Eds.), Reverse logistics: quantitative models for closed-loop supply chains (pp. 65-94). Berlin: Springer.
-
(2004)
Reverse Logistics: Quantitative Models for Closed-Loop Supply Chains
, pp. 65-94
-
-
Fleischmann, M.1
Bloemhof-Ruwaard, J.M.2
Beullens, P.3
Dekker, R.4
-
14
-
-
0742306058
-
Integrating closed-loop supply chains and spare-parts management at IBM
-
Fleischmann, M., van Nunen, J. A. E. E., & Grave, B. (2003). Integrating closed-loop supply chains and spare-parts management at IBM. Interfaces, 33(6), 44-56.
-
(2003)
Interfaces
, vol.33
, Issue.6
, pp. 44-56
-
-
Fleischmann, M.1
van Nunen, J.A.E.E.2
Grave, B.3
-
15
-
-
70449581031
-
A goal programming model for the operation of closed-loop supply chains
-
Gupta, A., & Evans, G. W. (2009). A goal programming model for the operation of closed-loop supply chains. Engineering Optimization, 41(8), 713-735.
-
(2009)
Engineering Optimization
, vol.41
, Issue.8
, pp. 713-735
-
-
Gupta, A.1
Evans, G.W.2
-
16
-
-
0024702296
-
Evaluating the impact of operating environments on MRP system nervousness
-
Ho, C. (1989). Evaluating the impact of operating environments on MRP system nervousness. International Journal of Production Research, 27, 1115-1135.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1115-1135
-
-
Ho, C.1
-
17
-
-
0035314299
-
Possibilistic programming in production planning of assemble-to-order environments
-
Hsu, H. M., & Wang, W. P. (2001). Possibilistic programming in production planning of assemble-to-order environments. Fuzzy Sets and Systems, 119, 59-70.
-
(2001)
Fuzzy Sets and Systems
, vol.119
, pp. 59-70
-
-
Hsu, H.M.1
Wang, W.P.2
-
18
-
-
0001862777
-
Possibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem
-
Inuiguchi, M., & Ramik, J. (2000). Possibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem. Fuzzy Sets and Systems, 111, 3-28.
-
(2000)
Fuzzy Sets and Systems
, vol.111
, pp. 3-28
-
-
Inuiguchi, M.1
Ramik, J.2
-
19
-
-
0032657920
-
A closed-loop logistics model for remanufacturing
-
Jayaraman, V., Guide, V. D. R., Jr., & Srivastava, R. (1999). A closed-loop logistics model for remanufacturing. Journal of the Operational Research Society, 50, 497-508.
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 497-508
-
-
Jayaraman, V.1
Guide Jr., V.D.R.2
Srivastava, R.3
-
20
-
-
0038241896
-
The design of reverse distribution networks: models and solution procedures
-
Jayaraman, V., Patterson, R. A., & Rolland, E. (2003). The design of reverse distribution networks: models and solution procedures. European Journal of Operational Research, 150, 128-149.
-
(2003)
European Journal of Operational Research
, vol.150
, pp. 128-149
-
-
Jayaraman, V.1
Patterson, R.A.2
Rolland, E.3
-
21
-
-
33750738038
-
Linear programming with fuzzy parameters: an interactive method resolution
-
Jimenez, M., Arenas, M., Bilbao, A., & Rodriguez, M. V. (2007). Linear programming with fuzzy parameters: an interactive method resolution. European Journal of Operational Research, 177, 1599-1609.
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 1599-1609
-
-
Jimenez, M.1
Arenas, M.2
Bilbao, A.3
Rodriguez, M.V.4
-
22
-
-
80055031645
-
Production planning of a hybrid manufacturing- remanufacturing system under uncertainty within a closed-loop supply chain
-
Kenné, J. P., Dejax, P., & Gharbi, A. (2012). Production planning of a hybrid manufacturing- remanufacturing system under uncertainty within a closed-loop supply chain. International Journal of Production Economics, 135(1), 81-93.
-
(2012)
International Journal of Production Economics
, vol.135
, Issue.1
, pp. 81-93
-
-
Kenné, J.P.1
Dejax, P.2
Gharbi, A.3
-
23
-
-
33749987986
-
Supply planning model for remanufacturing system in reverse logistics environment
-
Kim, K. B., Song, I. S., & Jeong, B. J. (2006). Supply planning model for remanufacturing system in reverse logistics environment. Computers and Industrial Engineering, 51(2), 279-287.
-
(2006)
Computers and Industrial Engineering
, vol.51
, Issue.2
, pp. 279-287
-
-
Kim, K.B.1
Song, I.S.2
Jeong, B.J.3
-
24
-
-
70449527794
-
The design of robust value-creating supply chain networks: a critical review
-
Klibi, W., Martel, A., & Guitouni, A. (2010). The design of robust value-creating supply chain networks: a critical review. European Journal of Operational Research, 203, 283-293.
-
(2010)
European Journal of Operational Research
, vol.203
, pp. 283-293
-
-
Klibi, W.1
Martel, A.2
Guitouni, A.3
-
25
-
-
33746964924
-
A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs
-
Ko, H. J., & Evans, G. W. (2007). A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs. Computers and Operations Research, 34, 346-366.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 346-366
-
-
Ko, H.J.1
Evans, G.W.2
-
27
-
-
72049097057
-
Returnable containers: An example of reverse logistics
-
Kroon, L., & Vrijens, G. (1995). Returnable containers: An example of reverse logistics. International Journal of Physical Distribution and Logistics Management, 25(2), 56-68.
-
(1995)
International Journal of Physical Distribution and Logistics Management
, vol.25
, Issue.2
, pp. 56-68
-
-
Kroon, L.1
Vrijens, G.2
-
28
-
-
31744439154
-
A fuzzy programming approach for vendor selection problem in a supply chain
-
Kumar, M., Vrat, P., & Shankar, R. (2006). A fuzzy programming approach for vendor selection problem in a supply chain. International Journal of Production Economics, 101, 273-285.
-
(2006)
International Journal of Production Economics
, vol.101
, pp. 273-285
-
-
Kumar, M.1
Vrat, P.2
Shankar, R.3
-
29
-
-
0026898945
-
A new approach to some possibilistic linear programming problems
-
Lai, Y. J., & Hwang, C. L. (1992). A new approach to some possibilistic linear programming problems. Fuzzy Sets and Systems, 49, 121-133.
-
(1992)
Fuzzy Sets and Systems
, vol.49
, pp. 121-133
-
-
Lai, Y.J.1
Hwang, C.L.2
-
30
-
-
0027559242
-
Possibilistic linear programming for managing interest rate risk
-
Lai, Y. J., & Hwang, C. L. (1993). Possibilistic linear programming for managing interest rate risk. Fuzzy Sets and Systems, 54, 135-146.
-
(1993)
Fuzzy Sets and Systems
, vol.54
, pp. 135-146
-
-
Lai, Y.J.1
Hwang, C.L.2
-
31
-
-
38649091076
-
A heuristic approach to logistics network design for end-of-lease computer products recovery
-
Lee, D. H., & Dong, M. (2008). A heuristic approach to logistics network design for end-of-lease computer products recovery. Transportation Research Part E: Logistics and Transportation Review, 44, 455-474.
-
(2008)
Transportation Research Part E: Logistics and Transportation Review
, vol.44
, pp. 455-474
-
-
Lee, D.H.1
Dong, M.2
-
32
-
-
77957793997
-
The design of sustainable logistics network under uncertainty
-
Lee, D. H., Dong, M., & Bian, W. (2010). The design of sustainable logistics network under uncertainty. International Journal of Production Economics, 128, 159-166.
-
(2010)
International Journal of Production Economics
, vol.128
, pp. 159-166
-
-
Lee, D.H.1
Dong, M.2
Bian, W.3
-
33
-
-
33645784856
-
Distribution planning decisions using interactive fuzzy multi-objective linear programming
-
Liang, T. F. (2006). Distribution planning decisions using interactive fuzzy multi-objective linear programming. Fuzzy Sets and Systems, 157, 1303-1316.
-
(2006)
Fuzzy Sets and Systems
, vol.157
, pp. 1303-1316
-
-
Liang, T.F.1
-
34
-
-
34548526437
-
Application of interactive possibilistic linear programming to aggregate production planning with multiple imprecise objectives
-
Liang, T. F. (2007). Application of interactive possibilistic linear programming to aggregate production planning with multiple imprecise objectives. Production Planning & Control, 18(7), 548-560.
-
(2007)
Production Planning & Control
, vol.18
, Issue.7
, pp. 548-560
-
-
Liang, T.F.1
-
35
-
-
36348959258
-
Integrating production-transportation planning decision with fuzzy multiple goals in supply chains
-
Liang, T. F. (2008). Integrating production-transportation planning decision with fuzzy multiple goals in supply chains. International Journal of Production Research, 46, 1477-1494.
-
(2008)
International Journal of Production Research
, vol.46
, pp. 1477-1494
-
-
Liang, T.F.1
-
36
-
-
33746986504
-
Reverse logistics network design with stochastic lead times
-
Lieckens, K., & Vandaele, N. (2007). Reverse logistics network design with stochastic lead times. Computers and Operations Research, 34, 395-416.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 395-416
-
-
Lieckens, K.1
Vandaele, N.2
-
37
-
-
33746978678
-
A generic stochastic model for supply-and-return network design
-
Listes, O. (2007). A generic stochastic model for supply-and-return network design. Computers and Operations Research, 34, 417-442.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 417-442
-
-
Listes, O.1
-
38
-
-
3943071055
-
A stochastic approach to a case study for product recovery network design
-
Listes, O., & Dekker, R. (2005). A stochastic approach to a case study for product recovery network design. European Journal of Operational Research, 160, 268-287.
-
(2005)
European Journal of Operational Research
, vol.160
, pp. 268-287
-
-
Listes, O.1
Dekker, R.2
-
39
-
-
0000804474
-
Chance-constrained programming with fuzzy parameters
-
Liu, B. D., & Iwamura, K. (1998). Chance-constrained programming with fuzzy parameters. Fuzzy Sets and Systems, 94, 227-237.
-
(1998)
Fuzzy Sets and Systems
, vol.94
, pp. 227-237
-
-
Liu, B.D.1
Iwamura, K.2
-
40
-
-
34347249504
-
Theoretical and semantic distinctions of fuzzy, possibilistic, and mixed fuzzy/possibilistic optimization
-
Lodwick, W. A., & Jamison, K. D. (2007). Theoretical and semantic distinctions of fuzzy, possibilistic, and mixed fuzzy/possibilistic optimization. Fuzzy Sets and Systems, 158(17), 1861-1872.
-
(2007)
Fuzzy Sets and Systems
, vol.158
, Issue.17
, pp. 1861-1872
-
-
Lodwick, W.A.1
Jamison, K.D.2
-
41
-
-
33746937113
-
A facility location model for logistics systems including reverse flows: The case of remanufacturing activities
-
Lu, Z., & Bostel, N. (2007). A facility location model for logistics systems including reverse flows: The case of remanufacturing activities. Computers and Operations Research, 34, 299-323.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 299-323
-
-
Lu, Z.1
Bostel, N.2
-
42
-
-
0031647393
-
The return plant location problem: Modelling and resolution
-
Marín, A., & Pelegrin, B. (1998). The return plant location problem: Modelling and resolution. European Journal of Operational Research, 104, 375-392.
-
(1998)
European Journal of Operational Research
, vol.104
, pp. 375-392
-
-
Marín, A.1
Pelegrin, B.2
-
43
-
-
33750217464
-
The spatial and temporal consolidation of returned products in a closed-loop supply chain network
-
Min, H., Ko, C. S., & Ko, H. J. (2006). The spatial and temporal consolidation of returned products in a closed-loop supply chain network. Computers and Industrial Engineering, 51, 309-320.
-
(2006)
Computers and Industrial Engineering
, vol.51
, pp. 309-320
-
-
Min, H.1
Ko, C.S.2
Ko, H.J.3
-
44
-
-
24144451811
-
A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns
-
Min, H., Ko, C. S., & Ko, H. J. (2006). A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns. Omega, 34, 56-69.
-
(2006)
Omega
, vol.34
, pp. 56-69
-
-
Min, H.1
Ko, C.S.2
Ko, H.J.3
-
45
-
-
41549118958
-
The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers
-
Min, H., & Ko, H. J. (2008). The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers. International Journal of Production Economics, 113, 176-192.
-
(2008)
International Journal of Production Economics
, vol.113
, pp. 176-192
-
-
Min, H.1
Ko, H.J.2
-
46
-
-
27344448554
-
MRP with flexible constraints: A fuzzy mathematical programming approach
-
Mula, J., Poler, R., & Garcia, J. P. (2006). MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets and Systems, 157, 74-97.
-
(2006)
Fuzzy Sets and Systems
, vol.157
, pp. 74-97
-
-
Mula, J.1
Poler, R.2
Garcia, J.P.3
-
47
-
-
26944445500
-
Does the competitive environment influence the efficacy of investment in environmental management?
-
Pagell, M., Yang, C. L., Krumwiede, D. W., & Sheu, C. (2004). Does the competitive environment influence the efficacy of investment in environmental management? Journal of Supply Chain Management, 40(3), 30-39.
-
(2004)
Journal of Supply Chain Management
, vol.40
, Issue.3
, pp. 30-39
-
-
Pagell, M.1
Yang, C.L.2
Krumwiede, D.W.3
Sheu, C.4
-
48
-
-
12244265834
-
Solving a multiobjective possibilistic problem through compromise programming
-
Parra, M. A., Terol, A. B., Gladish, B. P., & Rodriguez Uria, M. V. (2005). Solving a multiobjective possibilistic problem through compromise programming. European Journal of Operational Research, 164, 748-759.
-
(2005)
European Journal of Operational Research
, vol.164
, pp. 748-759
-
-
Parra, M.A.1
Terol, A.B.2
Gladish, B.P.3
Rodriguez Uria, M.V.4
-
49
-
-
34247644874
-
A goal programming model for paper recycling system
-
Pati, R., Vrat, P., & Kumar, P. (2008). A goal programming model for paper recycling system. Omega, 36, 405-417.
-
(2008)
Omega
, vol.36
, pp. 405-417
-
-
Pati, R.1
Vrat, P.2
Kumar, P.3
-
50
-
-
79251619917
-
Solid waste management in European countries: a review of systems analysis techniques
-
Pires, A., Martinho, G., & Chang, N. B. (2011). Solid waste management in European countries: a review of systems analysis techniques. Journal of Environmental Management, 92, 1033-1050.
-
(2011)
Journal of Environmental Management
, vol.92
, pp. 1033-1050
-
-
Pires, A.1
Martinho, G.2
Chang, N.B.3
-
51
-
-
71749118341
-
A memetic algorithm for bi-objective integrated forward/reverse logistics network design
-
Pishvaee, M. S., Farahani, R. Z., & Dullaert, W. (2010). A memetic algorithm for bi-objective integrated forward/reverse logistics network design. Computers and Operations Research, 37, 1100-1112.
-
(2010)
Computers and Operations Research
, vol.37
, pp. 1100-1112
-
-
Pishvaee, M.S.1
Farahani, R.Z.2
Dullaert, W.3
-
52
-
-
77955419848
-
A stochastic optimization model for integrated forward/reverse logistics network design
-
Pishvaee, M. S., Jolai, F., & Razmi, J. (2009). A stochastic optimization model for integrated forward/reverse logistics network design. Journal of Manufacturing Systems, 28, 107-114.
-
(2009)
Journal of Manufacturing Systems
, vol.28
, pp. 107-114
-
-
Pishvaee, M.S.1
Jolai, F.2
Razmi, J.3
-
53
-
-
77956182227
-
A robust optimization approach to closed-loop supply chain network design under uncertainty
-
Pishvaee, M. S., Rabbani, M., & Torabi, S. A. (2011). A robust optimization approach to closed-loop supply chain network design under uncertainty. Applied Mathematical Modelling, 35, 637-649.
-
(2011)
Applied Mathematical Modelling
, vol.35
, pp. 637-649
-
-
Pishvaee, M.S.1
Rabbani, M.2
Torabi, S.A.3
-
54
-
-
77955681026
-
A possibilistic programming approach for closed-loop supply chain network design under uncertainty
-
Pishvaee, M. S., & Torabi, S. A. (2010). A possibilistic programming approach for closed-loop supply chain network design under uncertainty. Fuzzy Sets and Systems, 161, 2668-2683.
-
(2010)
Fuzzy Sets and Systems
, vol.161
, pp. 2668-2683
-
-
Pishvaee, M.S.1
Torabi, S.A.2
-
55
-
-
33745777215
-
A warehouse-based design model for reverse logistics
-
Salema, M. I., Barbosa-Póvoa, A. P., & Novais, A. Q. (2006). A warehouse-based design model for reverse logistics. Journal of the Operational Research Society, 57, 615-629.
-
(2006)
Journal of the Operational Research Society
, vol.57
, pp. 615-629
-
-
Salema, M.I.1
Barbosa-Póvoa, A.P.2
Novais, A.Q.3
-
56
-
-
33846028582
-
An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
-
Salema, M. I., Barbosa-Póvoa, A. P., & Novais, A. Q. (2007). An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty. European Journal of Operational Research, 179, 1063-1077.
-
(2007)
European Journal of Operational Research
, vol.179
, pp. 1063-1077
-
-
Salema, M.I.1
Barbosa-Póvoa, A.P.2
Novais, A.Q.3
-
57
-
-
0742306057
-
Closed-loop supply chains for spent batteries
-
Schultmann, F., Engels, B., & Rentz, O. (2003). Closed-loop supply chains for spent batteries. Interfaces, 33, 57-71.
-
(2003)
Interfaces
, vol.33
, pp. 57-71
-
-
Schultmann, F.1
Engels, B.2
Rentz, O.3
-
58
-
-
31144457139
-
Modeling reverse logistic tasks within closed-loop supply chains: An example from the automotive industry
-
Schultmann, F., Zumkeller, M., & Rentz, O. (2006). Modeling reverse logistic tasks within closed-loop supply chains: An example from the automotive industry. European Journal of Operational Research, 171(3), 1033-1050.
-
(2006)
European Journal of Operational Research
, vol.171
, Issue.3
, pp. 1033-1050
-
-
Schultmann, F.1
Zumkeller, M.2
Rentz, O.3
-
59
-
-
38649141544
-
Collaborative production-distribution planning in supply chain: A fuzzy goal programming approach
-
Selim, H., Araz, C., & Ozkarahan, I. (2008). Collaborative production-distribution planning in supply chain: A fuzzy goal programming approach. Transportation Research Part E, 44, 396-419.
-
(2008)
Transportation Research Part E
, vol.44
, pp. 396-419
-
-
Selim, H.1
Araz, C.2
Ozkarahan, I.3
-
60
-
-
39049110961
-
A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach
-
Selim, H., & Ozkarahan, I. (2008). A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach. International Journal of Advanced Manufacturing Technology, 36, 401-418.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, pp. 401-418
-
-
Selim, H.1
Ozkarahan, I.2
-
61
-
-
4544285984
-
Industrial ecology, life cycles, supply chains: Differences and interrelations
-
Seuring, S. (2004). Industrial ecology, life cycles, supply chains: Differences and interrelations. Business Strategy and the Environment, 13(5), 306-319.
-
(2004)
Business Strategy and the Environment
, vol.13
, Issue.5
, pp. 306-319
-
-
Seuring, S.1
-
62
-
-
16844374319
-
An integrated logistics operational model for green-supply chain management
-
Sheu, J.-B., Chou, Y.-H., & Hu, C.-C. (2005). An integrated logistics operational model for green-supply chain management. Transportation Research, 41, 287-313.
-
(2005)
Transportation Research
, vol.41
, pp. 287-313
-
-
Sheu, J.-B.1
Chou, Y.-H.2
Hu, C.-C.3
-
63
-
-
35649000310
-
An interactive possibilistic programming approach for multiple objective supply chain master planning
-
Torabi, S. A., & Hassini, E. (2008). An interactive possibilistic programming approach for multiple objective supply chain master planning. Fuzzy Sets and Systems, 159, 193-214.
-
(2008)
Fuzzy Sets and Systems
, vol.159
, pp. 193-214
-
-
Torabi, S.A.1
Hassini, E.2
-
64
-
-
36549014721
-
Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model
-
Uster, H., Easwaran, G., Akcali, E., & Cetinkaya, S. (2007). Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model. Naval Research Logistics, 54, 890-907.
-
(2007)
Naval Research Logistics
, vol.54
, pp. 890-907
-
-
Uster, H.1
Easwaran, G.2
Akcali, E.3
Cetinkaya, S.4
-
65
-
-
0036466750
-
The Tanzanian scrap recycling cycle
-
van den Brink, J. (2002). The Tanzanian scrap recycling cycle. Technovation, 22, 187-197.
-
(2002)
Technovation
, vol.22
, pp. 187-197
-
-
van den Brink, J.1
-
66
-
-
33750455436
-
A possibilistic decision model for new product supply chain design
-
Wang, J., & Shu, Y. F. (2007). A possibilistic decision model for new product supply chain design. European Journal of Operational Research, 177, 1044-1061.
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 1044-1061
-
-
Wang, J.1
Shu, Y.F.2
-
67
-
-
26444454462
-
Applying possibilistic linear programming to aggregate production planning
-
Wang, R. C., & Liang, T. F. (2005). Applying possibilistic linear programming to aggregate production planning. International Journal of Production Economics, 98, 328-341.
-
(2005)
International Journal of Production Economics
, vol.98
, pp. 328-341
-
-
Wang, R.C.1
Liang, T.F.2
-
68
-
-
34047111363
-
A new location-inventory policy with reverse logistics applied to B2C e-markets of China
-
Wang, Z., Yao, D.-Q., & Huang, P. (2007). A new location-inventory policy with reverse logistics applied to B2C e-markets of China. International Journal of Production Economics, 107, 350-363.
-
(2007)
International Journal of Production Economics
, vol.107
, pp. 350-363
-
-
Wang, Z.1
Yao, D.-Q.2
Huang, P.3
-
69
-
-
0035201653
-
Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Austral
-
Wendy, K., & Ryan, C. (2001). Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Australia. Journal of Cleaner Production, 9(1), 75-81.
-
(2001)
Journal of Cleaner Production
, vol.9
, Issue.1
, pp. 75-81
-
-
Wendy, K.1
Ryan, C.2
-
70
-
-
57149122523
-
The optimization of the closed-loop supply chain network
-
Yang, G. F., Wang, Z. P., & Li, X. Q. (2009). The optimization of the closed-loop supply chain network. Transportation Research Part E, 45, 16-28.
-
(2009)
Transportation Research Part E
, vol.45
, pp. 16-28
-
-
Yang, G.F.1
Wang, Z.P.2
Li, X.Q.3
-
71
-
-
77957017795
-
Agricultural effluent control under uncertainty: An inexact double-sided fuzzy chance-constrained model
-
Xu, Y., & Qin, X. S. (2010). Agricultural effluent control under uncertainty: An inexact double-sided fuzzy chance-constrained model. Advances in Water Resources, 33(9), 997-1014.
-
(2010)
Advances in Water Resources
, vol.33
, Issue.9
, pp. 997-1014
-
-
Xu, Y.1
Qin, X.S.2
-
72
-
-
49349133217
-
Fuzzy sets as a basis for a theory of possibility
-
Zadeh, L. (1978). Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems, 1, 3-28.
-
(1978)
Fuzzy Sets and Systems
, vol.1
, pp. 3-28
-
-
Zadeh, L.1
-
73
-
-
84876112748
-
Influence of dependency between demands and returns in a reverse logistics system
-
doi: 10. 1016/j. ijpe. 2010. 10. 014
-
Zerhouni, H., Gayon, J. P., & Frein, Y. (2010). Influence of dependency between demands and returns in a reverse logistics system. International Journal of Production Economics. doi: 10. 1016/j. ijpe. 2010. 10. 014.
-
(2010)
International Journal of Production Economics
-
-
Zerhouni, H.1
Gayon, J.P.2
Frein, Y.3
-
74
-
-
71749090202
-
Robust stochastic fuzzy possibilistic programming for environmental decision making under uncertainty
-
Zhang, X. D., Huang, G. H., & Nie, X. H. (2009). Robust stochastic fuzzy possibilistic programming for environmental decision making under uncertainty. Science of the Total Environment, 408, 192-201.
-
(2009)
Science of the Total Environment
, vol.408
, pp. 192-201
-
-
Zhang, X.D.1
Huang, G.H.2
Nie, X.H.3
|