메뉴 건너뛰기




Volumn 23, Issue 6, 2012, Pages 345-368

Fuzzy mixed integer programming model for medium-term planning in a closed-loop supply chain with remanufacturing option

Author keywords

closed loop supply chains; fuzzy mathematical programming; remanufacturing; Tactical planning

Indexed keywords

ACCEPTANCE RATIO; CLOSED-LOOP SUPPLY CHAIN; CRISP EQUIVALENTS; FUZZY AGGREGATION; FUZZY MATHEMATICAL PROGRAMMING; FUZZY MIXED-INTEGER PROGRAMMING; LEGAL OBLIGATIONS; MANUFACTURING PLANT; MEDIUM TERM; NETWORK DESIGN PROBLEMS; NEW PRODUCT; OBJECTIVE FUNCTION VALUES; PRODUCTION ALTERNATIVES; PRODUCTION PLANNING; REMANUFACTURING; REVERSE FLOW; REVERSE LOGISTICS; SCENARIO ANALYSIS; STORAGE CAPACITY; TACTICAL PLANNING; UPPER BOUND;

EID: 84872281165     PISSN: 10641246     EISSN: 18758967     Source Type: Journal    
DOI: 10.3233/IFS-2012-0525     Document Type: Conference Paper
Times cited : (20)

References (86)
  • 1
    • 80053132767 scopus 로고    scopus 로고
    • Atactical model for planning the production and distribution of fresh produce
    • O. Ahumada and J.R.Villalobos,Atactical model for planning the production and distribution of fresh produce, Annals of Operations Research 190(1) (2009), 339-358
    • (2009) Annals of Operations Research , vol.190 , Issue.1 , pp. 339-358
    • Ahumada, O.1    Villalobos, J.R.2
  • 2
    • 33244491898 scopus 로고    scopus 로고
    • Atabu search approach to fuzzy goal programs and an application to aggregate production planning
    • A. Baykasoǧlu and T.Göçken,Atabu search approach to fuzzy goal programs and an application to aggregate production planning, Engineering Optimization 38(2) (2006), 155-177
    • (2006) Engineering Optimization , vol.38 , Issue.2 , pp. 155-177
    • Baykasoǧlu, A.1    Göçken, T.2
  • 3
    • 36248954481 scopus 로고    scopus 로고
    • Solution of a fully fuzzy multi-item economic order quantity problem using fuzzy ranking functions
    • A. Baykasoǧlu and T. Göçken, Solution of a fully fuzzy multi-item economic order quantity problem using fuzzy ranking functions, Engineering Optimization 39(8) (2007), 919- 939
    • (2007) Engineering Optimization , vol.39 , Issue.8 , pp. 919-939
    • Baykasoǧlu, A.1    Göçken, T.2
  • 5
    • 84856821514 scopus 로고    scopus 로고
    • Solving fully fuzzy mathematical programming model of eoq problem with a direct approach based on fuzzy ranking and pso
    • A. Baykasoǧlu and T. Göçken, Solving fully fuzzy mathematical programming model of EOQ problem with a direct approach based on fuzzy ranking and PSO, Journal of Intelligent & Fuzzy Systems 22(5) (2011), 237-251
    • (2011) Journal of Intelligent & Fuzzy Systems , vol.22 , Issue.5 , pp. 237-251
    • Baykasoǧlu, A.1    Göçken, T.2
  • 6
    • 80054917150 scopus 로고    scopus 로고
    • A direct solution approach to fuzzy mathematical programs with fuzzy decision variables
    • A. Baykasoǧlu and T. Göçken, A direct solution approach to fuzzy mathematical programs with fuzzy decision variables, Expert Systems with Applications 39(2) (2012), 1972-1978
    • (2012) Expert Systems with Applications , vol.39 , Issue.2 , pp. 1972-1978
    • Baykasoǧlu, A.1    Göçken, T.2
  • 7
    • 0346636333 scopus 로고
    • Decision making in a fuzzy environment
    • R.E. Bellman and L.A. Zadeh, Decision making in a fuzzy environment, Management Science 17 (1970), 141-164
    • (1970) Management Science , vol.17 , pp. 141-164
    • Bellman, R.E.1    Zadeh, L.A.2
  • 8
    • 41149119851 scopus 로고    scopus 로고
    • Modeling of a blending and marine transportation planning problem with fuzzy mixed-integer programming
    • DOI 10.1007/s00170-006-0919-2
    • B. Bilgen, Modeling of a blending and marine transportation planning problem with fuzzy mixed-integer programming, The International Journal of Advanced Manufacturing Technology 36(9-10) (2008), 1041-1050 (Pubitemid 351431714)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.9-10 , pp. 1041-1050
    • Bilgen, B.1
  • 9
    • 77249170691 scopus 로고    scopus 로고
    • Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem
    • B. Bilgen, Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem, Expert Systems with Applications 37(6) (2010a), 4438-4495
    • (2010) Expert Systems with Applications , vol.37 , Issue.6 , pp. 4438-4495
    • Bilgen, B.1
  • 10
    • 77954500288 scopus 로고    scopus 로고
    • Supply chain network modeling in a golf club industry via fuzzy linear programming approach
    • B. Bilgen, Supply chain network modeling in a golf club industry via fuzzy linear programming approach, Journal of Intelligent and Fuzzy Systems 21(4) (2010b), 243-253
    • (2010) Journal of Intelligent and Fuzzy Systems , vol.21 , Issue.4 , pp. 243-253
    • Bilgen, B.1
  • 11
    • 84856547923 scopus 로고    scopus 로고
    • A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products
    • 10.1080/ 09537287.2011.591651
    • A. Corominas, A. Lusa and J. Olivella, A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products, Production Planning and Control (2011), DOI:10.1080/ 09537287.2011.591651
    • (2011) Production Planning and Control
    • Corominas, A.1    Lusa, A.2    Olivella, J.3
  • 12
    • 55649085751 scopus 로고    scopus 로고
    • A mixed integer programming model for remanufacturing in reverse logistics environment
    • N.O. Demirel and H. Gökçen, A mixed integer programming model for remanufacturing in reverse logistics environment, The International Journal of Advanced Manufacturing Technology 39(11-12) (2008), 1197-1206
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , Issue.11-12 , pp. 1197-1206
    • Demirel, N.O.1    Gökçen, H.2
  • 15
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing: Industry practice and research needs
    • V.D.R. Guide Jr, Production planning and control for remanufacturing: Industry practice and research needs, Journal of Operations Management 18 (2000), 467-483
    • (2000) Journal of Operations Management , vol.18 , pp. 467-483
    • Guide Jr., V.D.R.1
  • 16
    • 0012339341 scopus 로고    scopus 로고
    • Weighted coefficients in two-phase approach for solving the multiple objective programming problems
    • S.M. Guu and Y.K. Wu, Weighted coefficients in two-phase approach for solving the multiple objective programming problems, Fuzzy Sets and Systems 85(1) (1997), 45-48
    • (1997) Fuzzy Sets and Systems , vol.85 , Issue.1 , pp. 45-48
    • Guu, S.M.1    Wu, Y.K.2
  • 17
    • 33847284990 scopus 로고    scopus 로고
    • A two-phase grey fuzzy optimization approach for water quality management of a river system
    • DOI 10.1016/j.advwatres.2006.11.001, PII S0309170806002089
    • S. Karmakar and P.P. Mujumdar, A two-phase grey fuzzy optimization approach for water quality management of a river system, Advances in Water Resources 30(5) (2007), 1218-1235 (Pubitemid 46323435)
    • (2007) Advances in Water Resources , vol.30 , Issue.5 , pp. 1218-1235
    • Karmakar, S.1    Mujumdar, P.P.2
  • 19
    • 33749987986 scopus 로고    scopus 로고
    • Supply planning model for remanufacturing system in reverse logistics environment
    • DOI 10.1016/j.cie.2006.02.008, PII S0360835206000945
    • K. Kim, I. Song, J. Kim and B. Jeong, Supply planning model for remanufacturing system in reverse logistics environment, Computers and Industrial Engineering 51 (2006), 279-287 (Pubitemid 44573586)
    • (2006) Computers and Industrial Engineering , vol.51 , Issue.2 , pp. 279-287
    • Kim, K.1    Song, I.2    Kim, J.3    Jeong, B.4
  • 20
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • S. Kreipl and M. Pinedo, Planning and scheduling in supply chains: An overview of issues in practice, Production and Operations Management 13(1) (2004), 77-92 (Pubitemid 39374561)
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 21
    • 32644458769 scopus 로고    scopus 로고
    • Production planning for closed-loop supply chains with product recovery and reuse: An analytical approach
    • DOI 10.1080/00207540500250507, PII Q45750047510125
    • V. Jayaraman, Production planning for closed-loop supply chains with product recovery and reuse: Analytical approach, International Journal of Production Research 44(5) (2006), 981-998 (Pubitemid 43245742)
    • (2006) International Journal of Production Research , vol.44 , Issue.5 , pp. 981-998
    • Jayaraman, V.1
  • 22
    • 0041063763 scopus 로고
    • Multiple objective decision making in a fuzzy environment
    • Department of Industrial Engineering, Kansas State University, Manhattan, US
    • R.J. Li, Multiple objective decision making in a fuzzy environment, Ph.D. Thesis, Department of Industrial Engineering, Kansas State University, Manhattan, US, 1990
    • (1990) Ph.D. Thesis
    • Li, R.J.1
  • 28
    • 33846028582 scopus 로고    scopus 로고
    • An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
    • DOI 10.1016/j.ejor.2005.05.032, PII S0377221706000919
    • M.I.G. Salema, A.P.B. Povoa and A.Q. Novais, An optimization model for design of a capacitated multi-product reverse logistics network with uncertainty, European Journal of Operations Research 179 (2007), 1063-1077 (Pubitemid 46043529)
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 1063-1077
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 29
    • 67349137534 scopus 로고    scopus 로고
    • A strategic and tactical model for closed-loop supply chains
    • M.I.G. Salema, A.P.B. Povoa and A.Q. Novais, A strategic and tactical model for closed-loop supply chains, OR Spectrum 31 (2009), 573-599
    • (2009) OR Spectrum , vol.31 , pp. 573-599
    • Salema, M.I.G.1    Povoa, A.P.B.2    Novais, A.Q.3
  • 30
    • 70449527773 scopus 로고    scopus 로고
    • Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework
    • M.I.G. Salema, A.P. Barbosa-Povoa and A.Q. Novais, Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework, European Journal of Operational Research 203 (2010), 336-349
    • (2010) European Journal of Operational Research , vol.203 , pp. 336-349
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 31
    • 77956228331 scopus 로고    scopus 로고
    • A multi-echelon reverse logistics network design for product recovery - A case of truck tire remanufacturing
    • P. Sasikumar, G. Kannan and A.N. Haq, A multi-echelon reverse logistics network design for product recovery - a case of truck tire remanufacturing, The International Journal of Advanced Manufacturing Technology 49 (2010), 1223-1234
    • (2010) International Journal of Advanced Manufacturing Technology , vol.49 , pp. 1223-1234
    • Sasikumar, P.1    Kannan, G.2    Haq, A.N.3
  • 32
    • 77957311584 scopus 로고    scopus 로고
    • Optimal production planning for a multi-product closed loop system with uncertain demand and return
    • J. Shi, G. Zhang and J. Sha, Optimal production planning for a multi-product closed loop system with uncertain demand and return, Computers & Operations Research 38 (2011), 641-650
    • (2011) Computers & Operations Research , vol.38 , pp. 641-650
    • Shi, J.1    Zhang, G.2    Sha, J.3
  • 34
    • 33750362960 scopus 로고    scopus 로고
    • Interactive compensatory fuzzy programming for decentralized multi-level linear programming (DMLLP) problems
    • DOI 10.1016/j.fss.2006.04.001, PII S0165011406001540
    • F. Tiryaki, Interactive compensatory fuzzy programming for decentralized multi level linear programming (DMLLP) problems, Fuzzy Sets and Systems 157 (2006), 3072-3090 (Pubitemid 44634019)
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.23 , pp. 3072-3090
    • Tiryaki, F.1
  • 35
    • 0023436831 scopus 로고
    • Fuzzy goal programming - An additive model
    • DOI 10.1016/0165-0114(87)90111-4
    • R.N. Tiwari, S. Dharmar and J.R. Rao, Fuzzy goal programming - an additive model, Fuzzy Sets and Systems 24 (1987), 27-34 (Pubitemid 18544505)
    • (1987) Fuzzy Sets and Systems , vol.24 , Issue.1 , pp. 27-34
    • Tiwari, R.N.1    Dharmar, S.2    Rao, J.R.3
  • 37
    • 0023381033 scopus 로고
    • An interactive fuzzy programming system
    • B. Werners, An interactive fuzzy programming system, Fuzzy Sets and Systems 23 (1987), 131-147
    • (1987) Fuzzy Sets and Systems 23 , pp. 131-147
    • Werners, B.1
  • 38
    • 61549119442 scopus 로고    scopus 로고
    • On the optimal design of the disassembly and recovery process
    • A. Xanthopoulos and E. Lakovou, On the optimal design of the disassembly and recovery process, Waste Management 29 (2009), 1702-1711
    • (2009) Waste Management , vol.29 , pp. 1702-1711
    • Xanthopoulos, A.1    Lakovou, E.2
  • 39
    • 77954626382 scopus 로고    scopus 로고
    • A capacitated production planning problem for closed-loop supply chain
    • Springer-Verlag Berlin Heidelberg
    • J. Zhang and X. Liu, A capacitated production planning problem for closed-loop supply chain,LNCS6146, Springer-Verlag Berlin Heidelberg, 2010, 243-251
    • (2010) LNCS , vol.6146 , pp. 243-251
    • Zhang, J.1    Liu, X.2
  • 41
    • 0002080021 scopus 로고
    • Fuzzy linear programming with several objective functions
    • H.J. Zimmermann, Fuzzy linear programming with several objective functions, Fuzzy Sets and Systems 1 (1978), 46-55
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 46-55
    • Zimmermann, H.J.1
  • 44
    • 80053132767 scopus 로고    scopus 로고
    • Atactical model for planning the production and distribution of fresh produce
    • O. Ahumada and J.R.Villalobos,Atactical model for planning the production and distribution of fresh produce, Annals of Operations Research 190(1) (2009), 339-358
    • (2009) Annals of Operations Research , vol.190 , Issue.1 , pp. 339-358
    • Ahumada, O.1    Villalobos, J.R.2
  • 45
    • 33244491898 scopus 로고    scopus 로고
    • Atabu search approach to fuzzy goal programs and an application to aggregate production planning
    • A. Baykasoǧlu and T.Göçken,Atabu search approach to fuzzy goal programs and an application to aggregate production planning, Engineering Optimization 38(2) (2006), 155-177
    • (2006) Engineering Optimization , vol.38 , Issue.2 , pp. 155-177
    • Baykasoǧlu, A.1    Göçken, T.2
  • 46
    • 36248954481 scopus 로고    scopus 로고
    • Solution of a fully fuzzy multi-item economic order quantity problem using fuzzy ranking functions
    • A. Baykasoǧlu and T. Göçken, Solution of a fully fuzzy multi-item economic order quantity problem using fuzzy ranking functions, Engineering Optimization 39(8) (2007), 919- 939
    • (2007) Engineering Optimization , vol.39 , Issue.8 , pp. 919-939
    • Baykasoǧlu, A.1    Göçken, T.2
  • 48
    • 84856821514 scopus 로고    scopus 로고
    • Solving fully fuzzy mathematical programming model of eoq problem with a direct approach based on fuzzy ranking and pso
    • A. Baykasoǧlu and T. Göçken, Solving fully fuzzy mathematical programming model of EOQ problem with a direct approach based on fuzzy ranking and PSO, Journal of Intelligent & Fuzzy Systems 22(5) (2011), 237-251
    • (2011) Journal of Intelligent & Fuzzy Systems , vol.22 , Issue.5 , pp. 237-251
    • Baykasoǧlu, A.1    Göçken, T.2
  • 49
    • 80054917150 scopus 로고    scopus 로고
    • A direct solution approach to fuzzy mathematical programs with fuzzy decision variables
    • A. Baykasoǧlu and T. Göçken, A direct solution approach to fuzzy mathematical programs with fuzzy decision variables, Expert Systems with Applications 39(2) (2012), 1972-1978
    • (2012) Expert Systems with Applications , vol.39 , Issue.2 , pp. 1972-1978
    • Baykasoǧlu, A.1    Göçken, T.2
  • 50
    • 0346636333 scopus 로고
    • Decision making in a fuzzy environment
    • R.E. Bellman and L.A. Zadeh, Decision making in a fuzzy environment, Management Science 17 (1970), 141-164
    • (1970) Management Science , vol.17 , pp. 141-164
    • Bellman, R.E.1    Zadeh, L.A.2
  • 51
    • 41149119851 scopus 로고    scopus 로고
    • Modeling of a blending and marine transportation planning problem with fuzzy mixed-integer programming
    • DOI 10.1007/s00170-006-0919-2
    • B. Bilgen, Modeling of a blending and marine transportation planning problem with fuzzy mixed-integer programming, The International Journal of Advanced Manufacturing Technology 36(9-10) (2008), 1041-1050 (Pubitemid 351431714)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.9-10 , pp. 1041-1050
    • Bilgen, B.1
  • 52
    • 77249170691 scopus 로고    scopus 로고
    • Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem
    • B. Bilgen, Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem, Expert Systems with Applications 37(6) (2010a), 4438-4495
    • (2010) Expert Systems with Applications , vol.37 , Issue.6 , pp. 4438-4495
    • Bilgen, B.1
  • 53
    • 77954500288 scopus 로고    scopus 로고
    • Supply chain network modeling in a golf club industry via fuzzy linear programming approach
    • B. Bilgen, Supply chain network modeling in a golf club industry via fuzzy linear programming approach, Journal of Intelligent and Fuzzy Systems 21(4) (2010b), 243-253
    • (2010) Journal of Intelligent and Fuzzy Systems , vol.21 , Issue.4 , pp. 243-253
    • Bilgen, B.1
  • 54
    • 84856547923 scopus 로고    scopus 로고
    • A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products
    • 10.1080/ 09537287.2011.591651
    • A. Corominas, A. Lusa and J. Olivella, A manufacturing and remanufacturing aggregate planning model considering a non-linear supply function of recovered products, Production Planning and Control (2011), DOI:10.1080/ 09537287.2011.591651
    • (2011) Production Planning and Control
    • Corominas, A.1    Lusa, A.2    Olivella, J.3
  • 55
    • 55649085751 scopus 로고    scopus 로고
    • A mixed integer programming model for remanufacturing in reverse logistics environment
    • N.O. Demirel and H. Gökçen, A mixed integer programming model for remanufacturing in reverse logistics environment, The International Journal of Advanced Manufacturing Technology 39(11-12) (2008), 1197-1206
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , Issue.11-12 , pp. 1197-1206
    • Demirel, N.O.1    Gökçen, H.2
  • 58
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing: Industry practice and research needs
    • V.D.R. Guide Jr, Production planning and control for remanufacturing: Industry practice and research needs, Journal of Operations Management 18 (2000), 467-483
    • (2000) Journal of Operations Management , vol.18 , pp. 467-483
    • Guide Jr., V.D.R.1
  • 59
    • 0012339341 scopus 로고    scopus 로고
    • Weighted coefficients in two-phase approach for solving the multiple objective programming problems
    • S.M. Guu and Y.K. Wu, Weighted coefficients in two-phase approach for solving the multiple objective programming problems, Fuzzy Sets and Systems 85(1) (1997), 45-48
    • (1997) Fuzzy Sets and Systems , vol.85 , Issue.1 , pp. 45-48
    • Guu, S.M.1    Wu, Y.K.2
  • 60
    • 33847284990 scopus 로고    scopus 로고
    • A two-phase grey fuzzy optimization approach for water quality management of a river system
    • DOI 10.1016/j.advwatres.2006.11.001, PII S0309170806002089
    • S. Karmakar and P.P. Mujumdar, A two-phase grey fuzzy optimization approach for water quality management of a river system, Advances in Water Resources 30(5) (2007), 1218-1235 (Pubitemid 46323435)
    • (2007) Advances in Water Resources , vol.30 , Issue.5 , pp. 1218-1235
    • Karmakar, S.1    Mujumdar, P.P.2
  • 62
    • 33749987986 scopus 로고    scopus 로고
    • Supply planning model for remanufacturing system in reverse logistics environment
    • DOI 10.1016/j.cie.2006.02.008, PII S0360835206000945
    • K. Kim, I. Song, J. Kim and B. Jeong, Supply planning model for remanufacturing system in reverse logistics environment, Computers and Industrial Engineering 51 (2006), 279-287 (Pubitemid 44573586)
    • (2006) Computers and Industrial Engineering , vol.51 , Issue.2 , pp. 279-287
    • Kim, K.1    Song, I.2    Kim, J.3    Jeong, B.4
  • 63
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • S. Kreipl and M. Pinedo, Planning and scheduling in supply chains: An overview of issues in practice, Production and Operations Management 13(1) (2004), 77-92 (Pubitemid 39374561)
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 64
    • 32644458769 scopus 로고    scopus 로고
    • Production planning for closed-loop supply chains with product recovery and reuse: An analytical approach
    • DOI 10.1080/00207540500250507, PII Q45750047510125
    • V. Jayaraman, Production planning for closed-loop supply chains with product recovery and reuse: Analytical approach, International Journal of Production Research 44(5) (2006), 981-998 (Pubitemid 43245742)
    • (2006) International Journal of Production Research , vol.44 , Issue.5 , pp. 981-998
    • Jayaraman, V.1
  • 65
    • 0041063763 scopus 로고
    • Multiple objective decision making in a fuzzy environment
    • Department of Industrial Engineering, Kansas State University, Manhattan, US
    • R.J. Li, Multiple objective decision making in a fuzzy environment, Ph.D. Thesis, Department of Industrial Engineering, Kansas State University, Manhattan, US, 1990
    • (1990) Ph.D. Thesis
    • Li, R.J.1
  • 71
    • 33846028582 scopus 로고    scopus 로고
    • An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
    • DOI 10.1016/j.ejor.2005.05.032, PII S0377221706000919
    • M.I.G. Salema, A.P.B. Povoa and A.Q. Novais, An optimization model for design of a capacitated multi-product reverse logistics network with uncertainty, European Journal of Operations Research 179 (2007), 1063-1077 (Pubitemid 46043529)
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 1063-1077
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 72
    • 67349137534 scopus 로고    scopus 로고
    • A strategic and tactical model for closed-loop supply chains
    • M.I.G. Salema, A.P.B. Povoa and A.Q. Novais, A strategic and tactical model for closed-loop supply chains, OR Spectrum 31 (2009), 573-599
    • (2009) OR Spectrum , vol.31 , pp. 573-599
    • Salema, M.I.G.1    Povoa, A.P.B.2    Novais, A.Q.3
  • 73
    • 70449527773 scopus 로고    scopus 로고
    • Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework
    • M.I.G. Salema, A.P. Barbosa-Povoa and A.Q. Novais, Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework, European Journal of Operational Research 203 (2010), 336-349
    • (2010) European Journal of Operational Research , vol.203 , pp. 336-349
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 74
    • 77956228331 scopus 로고    scopus 로고
    • A multi-echelon reverse logistics network design for product recovery - A case of truck tire remanufacturing
    • P. Sasikumar, G. Kannan and A.N. Haq, A multi-echelon reverse logistics network design for product recovery - a case of truck tire remanufacturing, The International Journal of Advanced Manufacturing Technology 49 (2010), 1223-1234
    • (2010) International Journal of Advanced Manufacturing Technology , vol.49 , pp. 1223-1234
    • Sasikumar, P.1    Kannan, G.2    Haq, A.N.3
  • 75
    • 77957311584 scopus 로고    scopus 로고
    • Optimal production planning for a multi-product closed loop system with uncertain demand and return
    • J. Shi, G. Zhang and J. Sha, Optimal production planning for a multi-product closed loop system with uncertain demand and return, Computers & Operations Research 38 (2011), 641-650
    • (2011) Computers & Operations Research , vol.38 , pp. 641-650
    • Shi, J.1    Zhang, G.2    Sha, J.3
  • 77
    • 33750362960 scopus 로고    scopus 로고
    • Interactive compensatory fuzzy programming for decentralized multi-level linear programming (DMLLP) problems
    • DOI 10.1016/j.fss.2006.04.001, PII S0165011406001540
    • F. Tiryaki, Interactive compensatory fuzzy programming for decentralized multi level linear programming (DMLLP) problems, Fuzzy Sets and Systems 157 (2006), 3072-3090 (Pubitemid 44634019)
    • (2006) Fuzzy Sets and Systems , vol.157 , Issue.23 , pp. 3072-3090
    • Tiryaki, F.1
  • 78
    • 0023436831 scopus 로고
    • Fuzzy goal programming - An additive model
    • DOI 10.1016/0165-0114(87)90111-4
    • R.N. Tiwari, S. Dharmar and J.R. Rao, Fuzzy goal programming - an additive model, Fuzzy Sets and Systems 24 (1987), 27-34 (Pubitemid 18544505)
    • (1987) Fuzzy Sets and Systems , vol.24 , Issue.1 , pp. 27-34
    • Tiwari, R.N.1    Dharmar, S.2    Rao, J.R.3
  • 80
    • 0023381033 scopus 로고
    • An interactive fuzzy programming system
    • B. Werners, An interactive fuzzy programming system, Fuzzy Sets and Systems 23 (1987), 131-147
    • (1987) Fuzzy Sets and Systems 23 , pp. 131-147
    • Werners, B.1
  • 81
    • 61549119442 scopus 로고    scopus 로고
    • On the optimal design of the disassembly and recovery process
    • A. Xanthopoulos and E. Lakovou, On the optimal design of the disassembly and recovery process, Waste Management 29 (2009), 1702-1711
    • (2009) Waste Management , vol.29 , pp. 1702-1711
    • Xanthopoulos, A.1    Lakovou, E.2
  • 82
    • 77954626382 scopus 로고    scopus 로고
    • A capacitated production planning problem for closed-loop supply chain
    • Springer-Verlag Berlin Heidelberg
    • J. Zhang and X. Liu, A capacitated production planning problem for closed-loop supply chain,LNCS6146, Springer-Verlag Berlin Heidelberg, 2010, 243-251
    • (2010) LNCS , vol.6146 , pp. 243-251
    • Zhang, J.1    Liu, X.2
  • 84
    • 0002080021 scopus 로고
    • Fuzzy linear programming with several objective functions
    • H.J. Zimmermann, Fuzzy linear programming with several objective functions, Fuzzy Sets and Systems 1 (1978), 46-55
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 46-55
    • Zimmermann, H.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.