메뉴 건너뛰기




Volumn 10, Issue 2, 2014, Pages 239-260

Multi-strategy budget allocation decision support system for seismic rehabilitation of road infrastructure

Author keywords

decision making; genetic algorithms; infrastructure management; Knapsack problem; multi objective optimisation; rehabilitation

Indexed keywords

DECISION SUPPORT SYSTEM (DSS); DECISION-MAKING PROBLEM; INFRASTRUCTURE MANAGEMENTS; KNAPSACK PROBLEMS; MANAGEMENT EFFICIENCY; MULTI OBJECTIVE DECISION MAKING; MULTI-CRITERIA ASSESSMENT; SEISMIC REHABILITATION;

EID: 84892465234     PISSN: 15732479     EISSN: 17448980     Source Type: Journal    
DOI: 10.1080/15732479.2012.737810     Document Type: Article
Times cited : (7)

References (53)
  • 4
    • 0017323751 scopus 로고
    • Rating and ranking of multiple aspect alternative using fuzzy sets
    • BaasS.M., KwakernaakH. 1977. Rating and ranking of multiple aspect alternative using fuzzy sets. Automatica. 13: 147-58.
    • (1977) Automatica , vol.13 , Issue.1 , pp. 47-58
    • Baas, S.M.1    Kwakernaak, H.2
  • 5
    • 84889574898 scopus 로고    scopus 로고
    • Quantitative validation of budgeting methods and suggestion of a new calculation method for the determination of maintenance costs
    • BahrC., LennertsK. 2010. Quantitative validation of budgeting methods and suggestion of a new calculation method for the determination of maintenance costs. Journal of Facilities Management. 8: 147-63.
    • (2010) Journal of Facilities Management , vol.8 , Issue.1 , pp. 47-63
    • Bahr, C.1    Lennerts, K.2
  • 6
    • 0346636333 scopus 로고
    • Decision-making in a fuzzy environment
    • BellmanR.E., ZadehL.A. 1970. Decision-making in a fuzzy environment. Management Science. 17: 141-164.
    • (1970) Management Science , vol.17 , pp. 141-164
    • Bellman, R.E.1    Zadeh, L.A.2
  • 7
    • 0346886902 scopus 로고    scopus 로고
    • Optimal fund-allocation analysis for multidistrict highway agencies
    • ChanW.T., FwaT.F.F., TanJ.Y. 2003. Optimal fund-allocation analysis for multidistrict highway agencies. Journal of Infrastructure Systems. 9: 167-175.
    • (2003) Journal of Infrastructure Systems , vol.9 , pp. 167-175
    • Chan, W.T.1    Fwa, T.F.F.2    Tan, J.Y.3
  • 8
    • 80053169546 scopus 로고    scopus 로고
    • A multi-objective generic algorithm approach for optimization of building energy performance
    • ChenD., GaoZ. 2011. A multi-objective generic algorithm approach for optimization of building energy performance. Computing in Civil Engineering. 416: 51-58.
    • (2011) Computing in Civil Engineering , vol.416 , pp. 51-58
    • Chen, D.1    Gao, Z.2
  • 9
    • 0000588240 scopus 로고    scopus 로고
    • Applications of the MACBETH approach in the framework of an addictive aggregation model
    • CostaB.C.A., VansnickJ.C. 1997. Applications of the MACBETH approach in the framework of an addictive aggregation model. Journal of Multi-Criteria Decision Analysis. 6: 107-114.
    • (1997) Journal of Multi-Criteria Decision Analysis , vol.6 , pp. 107-114
    • Costa, B.C.A.1    Vansnick, J.C.2
  • 10
    • 79957826751 scopus 로고    scopus 로고
    • Not so fast, budget allocation formulas: Magic or illusion, the bottom line: Managing library
    • CrossR.L. 2011. Not so fast, budget allocation formulas: Magic or illusion, the bottom line: Managing library. Finances. 24: 163-67.
    • (2011) Finances , vol.24 , Issue.1 , pp. 63-67
    • Cross, R.L.1
  • 11
    • 0010574744 scopus 로고    scopus 로고
    • [Online]. CHSS, University of Kent, Centres for Disease Control and Prevention. Retrieved from
    • CryerC. 2002. Injury indicators: A validation tool, road safety indicator specifications. [Online]. CHSS, University of Kent, Centres for Disease Control and Prevention. Retrieved from http://www.cdc.gov/nchs/data/ice/roadsafety_specs.pdf.
    • (2002) Injury indicators: A validation tool, road safety indicator specifications
    • Cryer, C.1
  • 14
    • 84941417033 scopus 로고    scopus 로고
    • Federal Highway Administration, WashingtonDC, Washington, DC,: FHWA, (MCEER-08-SP02). Part 1: Bridges
    • Federal Highway Administration. 2008. Seismic retrofitting manual for highway structures. WashingtonDC: FHWA. (MCEER-08-SP02). Part 1: Bridges.
    • (2008) Seismic retrofitting manual for highway structures
  • 17
    • 34548329910 scopus 로고    scopus 로고
    • Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost
    • FrangopolD.M., LiuM. 2007. Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost. Journal of Structure and Infrastructure Engineering. 3: 129-41.
    • (2007) Journal of Structure and Infrastructure Engineering , vol.3 , Issue.1 , pp. 29-41
    • Frangopol, D.M.1    Liu, M.2
  • 18
    • 33244478767 scopus 로고    scopus 로고
    • Decision methodology for allocating funds across transportation infrastructure assets
    • GharaibehN.G., Yi-ChangC., GurianP.L. 2006. Decision methodology for allocating funds across transportation infrastructure assets. Journal of Infrastructure Systems. 12: 11-9.
    • (2006) Journal of Infrastructure Systems , vol.12 , Issue.1 , pp. 1-9
    • Gharaibeh, N.G.1    Yi-Chang, C.2    Gurian, P.L.3
  • 19
    • 77958528060 scopus 로고    scopus 로고
    • Efficient resource allocation for genetic algorithm based multi-objective optimization with 1,000 simulations
    • GoelT., StanderN., Yih-YihL. 2010. Efficient resource allocation for genetic algorithm based multi-objective optimization with 1,000 simulations. Journal of Structural Multidisciplinary Optimization. 41: 421-432.
    • (2010) Journal of Structural Multidisciplinary Optimization , vol.41 , pp. 421-432
    • Goel, T.1    Stander, N.2    Yih-Yih, L.3
  • 24
    • 84855937977 scopus 로고    scopus 로고
    • Multi-objective optimization of resource levelling and allocation during construction scheduling
    • JunD.H., El-RayesK. 2011. Multi-objective optimization of resource levelling and allocation during construction scheduling. Journal of Construction Engineering and Management. 137: 1080-1088.
    • (2011) Journal of Construction Engineering and Management , vol.137 , pp. 1080-1088
    • Jun, D.H.1    El-Rayes, K.2
  • 25
    • 70350180429 scopus 로고    scopus 로고
    • Sensitivity analysis of the cost benefit ratio as a function of the level of service targets in the highway maintenance budget allocation process
    • KruegerD.A., De la GarzaJ.M. 2009. Sensitivity analysis of the cost benefit ratio as a function of the level of service targets in the highway maintenance budget allocation process. ACSE Computing in Civil Engineering. 308-317.
    • (2009) ACSE Computing in Civil Engineering , pp. 308-317
    • Krueger, D.A.1    De la Garza, J.M.2
  • 26
    • 33846030475 scopus 로고    scopus 로고
    • GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks
    • LeeC.K., KimS.K. 2007. GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks. Automation in Construction. 16: 153-164.
    • (2007) Automation in Construction , vol.16 , pp. 153-164
    • Lee, C.K.1    Kim, S.K.2
  • 27
    • 35448969371 scopus 로고    scopus 로고
    • A stochastic optimization model for highway project selection and programming under budget uncertainty
    • LiZ., PuyanM. 2006. A stochastic optimization model for highway project selection and programming under budget uncertainty. AATT 2006. 1: 174-80.
    • (2006) AATT 2006 , vol.1 , Issue.1 , pp. 74-80
    • Li, Z.1    Puyan, M.2
  • 29
    • 23244439235 scopus 로고    scopus 로고
    • Formulating procurement selection criteria through case-based reasoning approach
    • LuuD.T., NgS.T., ChenS.E. 2005. Formulating procurement selection criteria through case-based reasoning approach. Journal of Computing in Civil Engineering. 19: 269-276.
    • (2005) Journal of Computing in Civil Engineering , vol.19 , pp. 269-276
    • Luu, D.T.1    Ng, S.T.2    Chen, S.E.3
  • 30
    • 79954933207 scopus 로고    scopus 로고
    • A Monte-Carlo game theoretic approach for multi-criteria decision making under uncertainty
    • MadaniK., LundJ.R. 2011. A Monte-Carlo game theoretic approach for multi-criteria decision making under uncertainty. Advances in Water Resources. 34: 607-616.
    • (2011) Advances in Water Resources , vol.34 , pp. 607-616
    • Madani, K.1    Lund, J.R.2
  • 33
    • 33748919100 scopus 로고    scopus 로고
    • Genetic algorithm-based decision support for the restoration budget allocation of historical buildings
    • PerngY.H., JuanY.K., HsuH.S. 2007. Genetic algorithm-based decision support for the restoration budget allocation of historical buildings. Building and Environment. 42: 770-778.
    • (2007) Building and Environment , vol.42 , pp. 770-778
    • Perng, Y.H.1    Juan, Y.K.2    Hsu, H.S.3
  • 35
    • 49949103847 scopus 로고    scopus 로고
    • Designing a risk-informed balanced system by genetic algorithms: Comparison of different balancing criteria
    • PodofilliniL., ZioE. 2008. Designing a risk-informed balanced system by genetic algorithms: Comparison of different balancing criteria. Reliability Engineering and System Safety. 93: 1842-1852.
    • (2008) Reliability Engineering and System Safety , vol.93 , pp. 1842-1852
    • Podofillini, L.1    Zio, E.2
  • 37
    • 79959386360 scopus 로고    scopus 로고
    • Key assessment indicators (KAIs) for the sustainability of infrastructure project
    • ShenL., WuY., ZhangX. 2011b. Key assessment indicators (KAIs) for the sustainability of infrastructure project. Journal of Construction Engineering and Management. 137: 441-451.
    • (2011) Journal of Construction Engineering and Management , vol.137 , pp. 441-451
    • Shen, L.1    Wu, Y.2    Zhang, X.3
  • 38
  • 39
    • 84892453550 scopus 로고    scopus 로고
    • 6th international conference on managing pavements
    • TanJ.Y., ChanW.T., FwaT.F. Interactive budget allocation concept for pavement management. 2004. 6th international conference on managing pavements.
    • (2004)
    • Tan, J.Y.1    Chan, W.T.2    Fwa, T.F.3
  • 40
    • 77950459241 scopus 로고    scopus 로고
    • Systematic budget allocation for transportation construction projects: A case in Taiwan
    • TengJ.Y., HuangW.C., LinM.C. 2010. Systematic budget allocation for transportation construction projects: A case in Taiwan. Transportation. 37: 331-361.
    • (2010) Transportation , vol.37 , pp. 331-361
    • Teng, J.Y.1    Huang, W.C.2    Lin, M.C.3
  • 41
    • 0030465297 scopus 로고    scopus 로고
    • A multi-objective programming approach for selecting non-independent transportation investment alternatives
    • TengJ.Y., TzengG.H. 1996. A multi-objective programming approach for selecting non-independent transportation investment alternatives. Transportation Research, Part B. 30: 291-307.
    • (1996) Transportation Research, Part B , vol.30 , pp. 291-307
    • Teng, J.Y.1    Tzeng, G.H.2
  • 44
    • 0028465981 scopus 로고
    • A multi-objective decision making approach to energy supply mix decisions in Taiwan
    • TzengG.H., ShiahT.A., TengJ.Y. 1994. A multi-objective decision making approach to energy supply mix decisions in Taiwan. Energy Sources. 16: 301-316.
    • (1994) Energy Sources , vol.16 , pp. 301-316
    • Tzeng, G.H.1    Shiah, T.A.2    Teng, J.Y.3
  • 45
    • 84861838252 scopus 로고    scopus 로고
    • A linear programming approach to household energy conservation: Efficient allocation of budget
    • UctugF.G., YukseltanE. 2012. A linear programming approach to household energy conservation: Efficient allocation of budget. Energy and Buildings, 49, 200-208.
    • (2012) Energy and Buildings, 49, 200-208
    • Uctug, F.G.1    Yukseltan, E.2
  • 46
    • 0035279491 scopus 로고    scopus 로고
    • Effects of accounting and budgeting on capital allocation for infrastructure projects
    • WooldridgeS.C., GarvinM.J., MillerJ.B. 2001. Effects of accounting and budgeting on capital allocation for infrastructure projects. Journal of Management in Engineering. 17: 86-94.
    • (2001) Journal of Management in Engineering , vol.17 , pp. 86-94
    • Wooldridge, S.C.1    Garvin, M.J.2    Miller, J.B.3
  • 47
    • 63849244836 scopus 로고    scopus 로고
    • Hybrid multiobjective optimization model for regional pavement-preservation resource allocation
    • WuZ., FlintschG.W., ChowdhuryT. 2008. Hybrid multiobjective optimization model for regional pavement-preservation resource allocation. Transportation Research. 208428-37.
    • (2008) Transportation Research , Issue.2084 , pp. 28-37
    • Wu, Z.1    Flintsch, G.W.2    Chowdhury, T.3
  • 49
    • 84855233371 scopus 로고    scopus 로고
    • Applied multi-criteria ideal rehabilitation model for budget allocation across road infrastructure
    • YadollahiM., ZinM.R. 2011a. Applied multi-criteria ideal rehabilitation model for budget allocation across road infrastructure. International Journal of Innovation Science. 3: 193-202.
    • (2011) International Journal of Innovation Science , vol.3 , pp. 193-202
    • Yadollahi, M.1    Zin, M.R.2
  • 50
    • 79960688815 scopus 로고    scopus 로고
    • 2nd international conference on disaster management and human health: Reducing risk, improving outcomes, OrlandoUSA, Orlando,: WIT Press
    • YadollahiM., ZinM.R. Development of analytical hierarchy process (AHP) method for rehabilitation project ranking before disasters. 2011b. 2nd international conference on disaster management and human health: Reducing risk, improving outcomesOrlandoUSA: WIT Press. 209-220.
    • (2011) , pp. 209-220
    • Yadollahi, M.1    Zin, M.R.2
  • 51
    • 37549072204 scopus 로고    scopus 로고
    • Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study
    • YeungJ.F.Y., ChanA.P.C., ChanD.W.M., LiL.K. 2007. Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics. 25: 1219-1237.
    • (2007) Construction Management and Economics , vol.25 , pp. 1219-1237
    • Yeung, J.F.Y.1    Chan, A.P.C.2    Chan, D.W.M.3    Li, L.K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.