메뉴 건너뛰기




Volumn 15, Issue 4, 1999, Pages 71-83

Budgeting for facility maintenance and repair. I: methods and models

Author keywords

[No Author keywords available]

Indexed keywords

BUDGET CONTROL; COSTS; ENGINEERS; LIFE CYCLE; MAINTENANCE; MATHEMATICAL MODELS; REPAIR; RESOURCE ALLOCATION; SOCIETIES AND INSTITUTIONS;

EID: 0344065381     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(1999)15:4(71)     Document Type: Article
Times cited : (32)

References (25)
  • 1
    • 0343206016 scopus 로고
    • National Association of College and University Business Officers, Washington, D.C.
    • AME, and Rush, S. C. (1991). Managing the facilities portfolio. National Association of College and University Business Officers, Washington, D.C.
    • (1991) Managing the Facilities Portfolio
    • Rush, S.C.1
  • 2
    • 0028465230 scopus 로고
    • Budgeting for facility repair and maintenance
    • ASCE
    • Barco, A. L. (1994). "Budgeting for facility repair and maintenance." J. Mgmt. Engrg., ASCE, 10(4), 28-34.
    • (1994) J. Mgmt. Engrg. , vol.10 , Issue.4 , pp. 28-34
    • Barco, A.L.1
  • 3
    • 0005459602 scopus 로고
    • Building Research Board, Committee on Advanced Maintenance Concepts for Buildings, National Research Council, National Academy Press, Washington, D.C.
    • BRB (1990). Committing to the cost of ownership - Maintenance and repair of public buildings, Building Research Board, Committee on Advanced Maintenance Concepts for Buildings, National Research Council, National Academy Press, Washington, D.C.
    • (1990) Committing to the Cost of Ownership - Maintenance and Repair of Public Buildings
  • 4
    • 0344939715 scopus 로고    scopus 로고
    • Levels of investment study: Facilities and infrastructure maintenance and repair
    • Civil Engineering Research Foundation, Washington, D.C.
    • CERF (1996). "Levels of investment study: Facilities and infrastructure maintenance and repair." Rep. to Headquarters U.S. Air Force Civ. Engrg. Programs, Civil Engineering Research Foundation, Washington, D.C.
    • (1996) Rep. to Headquarters U.S. Air Force Civ. Engrg. Programs
  • 5
    • 0344077709 scopus 로고    scopus 로고
    • Cost predictions of facilities
    • ASCE
    • Christian, J., and Pandeya, A. (1997). "Cost predictions of facilities." J. Mgmt. Engrg., ASCE, 13(1), 52-61.
    • (1997) J. Mgmt. Engrg. , vol.13 , Issue.1 , pp. 52-61
    • Christian, J.1    Pandeya, A.2
  • 6
    • 0344939723 scopus 로고
    • Renewing the built environment
    • Department of Defense, U.S. Government Printing Office, Washington, D.C.
    • DoD (1989). "Renewing the built environment." RPMA Study Rep. to Congress, (March 16), Department of Defense, U.S. Government Printing Office, Washington, D.C.
    • (1989) RPMA Study Rep. to Congress, (March 16)
  • 7
    • 0343641586 scopus 로고    scopus 로고
    • Federal Facilities Council, Standing Committee on Operations and Maintenance, National Academy Press, Washington, D.C.
    • FFC (1996). Budgeting for facilities maintenance and repair activities, Rep. No. 131, Federal Facilities Council, Standing Committee on Operations and Maintenance, National Academy Press, Washington, D.C.
    • (1996) Budgeting for Facilities Maintenance and Repair Activities, Rep. No. 131
  • 8
    • 0344939714 scopus 로고    scopus 로고
    • Defense infrastructure: Demolition of unneeded buildings can help avoid operating costs
    • General Accounting Office, Washington, D.C.
    • GAO (1997a). "Defense infrastructure: demolition of unneeded buildings can help avoid operating costs." Rep., GAO/NSIAD-97-125, General Accounting Office, Washington, D.C.
    • (1997) Rep. GAO/NSIAD-97-125
  • 9
    • 0344939722 scopus 로고    scopus 로고
    • Deferred maintenance: Reporting requirements and identified issues
    • General Accounting Office, Washington, D.C.
    • GAO (1997b). "Deferred maintenance: reporting requirements and identified issues." Rep., GAO/AIMD-97-103R, General Accounting Office, Washington, D.C.
    • (1997) Rep. GAO/AIMD-97-103R
  • 10
    • 0344508865 scopus 로고    scopus 로고
    • The building materials durability model (BMDM): A comparative model for service life factors affecting materials selection
    • U.S. Army Construction and Engineering Research Laboratory, Champaign, Ill.
    • Hjelmstad, K. D., Lange, D. A., Lawrence, F. V., Parson, I. D., Quattrone, R. F., Trovillion, J. C., and Bailey, D. M. (1996). "The building materials durability model (BMDM): A comparative model for service life factors affecting materials selection." USACERL Tech. Rep. 96/24, U.S. Army Construction and Engineering Research Laboratory, Champaign, Ill.
    • (1996) USACERL Tech. Rep. 96/24
    • Hjelmstad, K.D.1    Lange, D.A.2    Lawrence, F.V.3    Parson, I.D.4    Quattrone, R.F.5    Trovillion, J.C.6    Bailey, D.M.7
  • 11
    • 0344077708 scopus 로고
    • Before the roof caves in: A predictive model for physical plant renewal
    • Association of Physical Plant Administrators of Universities and Colleges (APPA), ed., APPA, Alexandria, Va.
    • Hutson, R. E., and Biedenweg, F. M. (1989). "Before the roof caves in: A predictive model for physical plant renewal." Critical issues in facilities management, Association of Physical Plant Administrators of Universities and Colleges (APPA), ed., APPA, Alexandria, Va.
    • (1989) Critical Issues in Facilities Management
    • Hutson, R.E.1    Biedenweg, F.M.2
  • 12
    • 84980122754 scopus 로고
    • The tyranny of small decisions: Market failures, imperfections and the limit of economics
    • Kahn, A. E. (1966). "The tyranny of small decisions: Market failures, imperfections and the limit of economics." Kyklos, 20, 23-47.
    • (1966) Kyklos , vol.20 , pp. 23-47
    • Kahn, A.E.1
  • 13
    • 0029373560 scopus 로고
    • Preventing deferred maintenance
    • Kaiser, H. H. (1995). "Preventing deferred maintenance." AIPE Facilities, 22(5), 24-31.
    • (1995) AIPE Facilities , vol.22 , Issue.5 , pp. 24-31
    • Kaiser, H.H.1
  • 14
    • 0345371029 scopus 로고
    • Budgeting for maintenance should be based on present replacement cost
    • Kraft, W. W. (1950). "Budgeting for maintenance should be based on present replacement cost." College & University Business, 8(5), 37-43.
    • (1950) College & University Business , vol.8 , Issue.5 , pp. 37-43
    • Kraft, W.W.1
  • 17
    • 0026170587 scopus 로고
    • Life-cycle maintenance cost by facility use
    • ASCE
    • Neely, E. S., and Neathammer, R. D. (1991). "Life-cycle maintenance cost by facility use." J. Constr. Engrg. and Mgmt., ASCE, 117(2), 310-320.
    • (1991) J. Constr. Engrg. and Mgmt. , vol.117 , Issue.2 , pp. 310-320
    • Neely, E.S.1    Neathammer, R.D.2
  • 18
    • 0344077704 scopus 로고
    • Maintenance resource prediction in the facility life-cycle process
    • U.S. Army Construction Engineering Research Laboratory, Champaign, Ill.
    • Neely, E. S., Neathammer, R. D., and Stirn, J. R. (1991). "Maintenance resource prediction in the facility life-cycle process." USA-CERL Tech. Rep. P-91/10, U.S. Army Construction Engineering Research Laboratory, Champaign, Ill.
    • (1991) USA-CERL Tech. Rep. P-91/10
    • Neely, E.S.1    Neathammer, R.D.2    Stirn, J.R.3
  • 19
    • 0344939718 scopus 로고
    • Facilities renewal: The formula approach
    • Association of Physical Plant Administrators of Universities and Colleges (APPA), ed., APPA, Alexandria, Va.
    • Phillips, C., Jr. (1989). "Facilities renewal: the formula approach." Critical issues in facilities management. Association of Physical Plant Administrators of Universities and Colleges (APPA), ed., APPA, Alexandria, Va.
    • (1989) Critical Issues in Facilities Management
    • Phillips C., Jr.1
  • 21
    • 0344077707 scopus 로고    scopus 로고
    • Air Force facility investment metric: Executive overview
    • Headquarters, Department of the Air Force, Washington, D.C.
    • U.S. Air Force (1997). "Air Force facility investment metric: Executive overview." Rep. (August 1), Headquarters, Department of the Air Force, Washington, D.C.
    • (1997) Rep. (August 1)
  • 22
    • 0344508863 scopus 로고    scopus 로고
    • Installation status report-Part I: Infrastructure FY97 implementing instructions
    • Headquarters, Department of the Army, Washington, D.C.
    • U.S. Army (1997a). "Installation status report-Part I: Infrastructure FY97 implementing instructions." Rep., Headquarters, Department of the Army, Washington, D.C.
    • (1997) Rep.
  • 23
    • 0344939717 scopus 로고    scopus 로고
    • Installation status report cost factor methodology
    • U.S. Army Cost and Econ. Analysis Center, Falls Church, Va.
    • U.S. Army (1997b). "Installation status report cost factor methodology." Rep., U.S. Army Cost and Econ. Analysis Center, Falls Church, Va.
    • (1997) Rep.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.