메뉴 건너뛰기




Volumn 3, Issue 4, 2011, Pages 193-202

Applied multi-criteria ideal rehabilitation model for budget allocation across road infrastructure

Author keywords

[No Author keywords available]

Indexed keywords

BUDGET ALLOCATION; COMPLEX PROCESSES; DECISION SUPPORTS; EVALUATION CRITERIA; MULTI-CRITERIA; MULTI-CRITERIA DECISION ANALYSIS; PRIORITIZATION; ROAD INFRASTRUCTURES;

EID: 84855233371     PISSN: 17572223     EISSN: 17572231     Source Type: Journal    
DOI: 10.1260/1757-2223.3.4.193     Document Type: Article
Times cited : (4)

References (25)
  • 1
    • 84855219088 scopus 로고    scopus 로고
    • The engineering & construction industry innovation deficit: Is the E&C industry model broken?
    • Working Paper
    • Prieto, B., "The Engineering & Construction Industry Innovation Deficit: Is the E&C Industry Model Broken?", Collaboratory for Research on Global Projects, Working Paper, 2009.
    • (2009) Collaboratory for Research on Global Projects
    • Prieto, B.1
  • 3
    • 84855239820 scopus 로고    scopus 로고
    • Prioritization model for studies on the emergency transportation systems of large cities after natural disasters-case study: Prioritization model for the research requirements in the field of transportation systems in the tehran metropolitan city
    • Davos, Swiss
    • Yadollahi, M. and Pourreza, M., Prioritization Model for Studies on the Emergency Transportation Systems of Large Cities after Natural Disasters-Case study: Prioritization Model for the Research Requirements in the Field of Transportation Systems in the Tehran Metropolitan City, International Disaster and Risk Conference (IDRC), Davos, Swiss, 2008.
    • (2008) International Disaster and Risk Conference (IDRC)
    • Yadollahi, M.1    Pourreza, M.2
  • 4
    • 84855216930 scopus 로고    scopus 로고
    • A method for prioritization of vulnerability assessment of technical transportation structures in natural disasters
    • Davos, Swiss
    • Yadollahi, M. and Pourreza, M., A Method for Prioritization of Vulnerability Assessment of Technical Transportation Structures in Natural Disasters, International Disaster and Risk Conference (IDRC), Davos, Swiss, 2010.
    • (2010) International Disaster and Risk Conference (IDRC)
    • Yadollahi, M.1    Pourreza, M.2
  • 5
    • 58849100797 scopus 로고    scopus 로고
    • A decision support system for road maintenance budget allocation
    • Bjornsson, H. C., De La Garza, J. M. and Nasir, M. J., A Decision Support System for Road Maintenance Budget Allocation, Computing in Civil and Building Engineering, Conference Proceeding Paper, ASCE Library, 2000, 702-709 (Pubitemid 35213252)
    • (2000) Computing in Civil and Building Engineering , vol.1 , pp. 702-709
    • Bjornsson, H.C.1    De La Garza, J.M.2    Nasir, M.J.3
  • 6
    • 84855226050 scopus 로고    scopus 로고
    • Management and control of cost and risk for tunnelling and infrastructure projects
    • Reilly, J. and Brown, J., Management and control of cost and risk for tunnelling and infrastructure projects, Tunnelling and Underground Space Technology, 19, 2004, Issues 4-5, P: 330.
    • (2004) Tunnelling and Underground Space Technology , vol.19 , Issue.4-5 , pp. 330
    • Reilly, J.1    Brown, J.2
  • 7
    • 77950104166 scopus 로고    scopus 로고
    • Development of a prioritization methodology for maintaining virginia's bridge infrastructure systems
    • University of Virginia, Charlottesville, VA, USA, April 24
    • Gokey, J., Klein, N. and Mackey, C., Development of a Prioritization Methodology for Maintaining Virginia's Bridge Infrastructure Systems, IEEE Systems and Information Engineering Design Symposium, University of Virginia, Charlottesville, VA, USA, April 24, 2009.
    • (2009) IEEE Systems and Information Engineering Design Symposium
    • Gokey, J.1    Klein, N.2    Mackey, C.3
  • 8
    • 77950459241 scopus 로고    scopus 로고
    • Systematic budget allocation for transportation construction projects: A case in Taiwan
    • Teng, J. Y., Huang, W. C. and Lin, M. C., Systematic budget allocation for transportation construction projects: A case in Taiwan, Transportation, 2010, 37, 331-361.
    • Transportation , vol.2010 , Issue.37 , pp. 331-361
    • Teng, J.Y.1    Huang, W.C.2    Lin, M.C.3
  • 13
    • 57649219956 scopus 로고    scopus 로고
    • Economic evaluation model for post-earthquake bridge repair/ rehabilitation: Taiwan case studies
    • Min-Yuan, C., Yu-Wei, W., Sheng-Jin, C. and Ming-Chuan, W., Economic evaluation model for post-earthquake bridge repair/rehabilitation: Taiwan case studies, Automation in Construction, 2009, 18, 204-218.
    • (2009) Automation in Construction , vol.18 , pp. 204-218
    • Min-Yuan, C.1    Yu-Wei, W.2    Sheng-Jin, C.3    Ming-Chuan, W.4
  • 14
    • 33748919100 scopus 로고    scopus 로고
    • Genetic algorithm-based decision support for the restoration budget allocation of historical buildings
    • Perng, Y. H., Juan, Y. K. and Hsu, H. S., Genetic algorithm-based decision support for the restoration budget allocation of historical buildings, Building and Environment, 2007, 42, 770-778.
    • (2007) Building and Environment , vol.42 , pp. 770-778
    • Perng, Y.H.1    Juan, Y.K.2    Hsu, H.S.3
  • 16
    • 78349297105 scopus 로고    scopus 로고
    • The budget allocation model of public infrastructure projects
    • Huang, W. C., Teng, J. Y. and Lin, M. C., The Budget Allocation model of Public Infrastructure Projects, Journal of Marine Science and Technology, 2010, 18 (5), 697-708.
    • (2010) Journal of Marine Science and Technology , vol.18 , Issue.5 , pp. 697-708
    • Huang, W.C.1    Teng, J.Y.2    Lin, M.C.3
  • 18
    • 70350180429 scopus 로고    scopus 로고
    • Sensitivity analysis of the cost benefit ratio as a function of the level of service targets in the highway maintenance budget allocation process
    • ACSE
    • Krueger, D. A. and De la Garza, J. M., Sensitivity Analysis of the Cost Benefit Ratio as a Function of the Level of Service Targets in the Highway Maintenance Budget Allocation Process, Computing in Civil Engineering, ACSE, 2009, 308-317.
    • (2009) Computing in Civil Engineering , pp. 308-317
    • Krueger, D.A.1    De La Garza, J.M.2
  • 20
    • 84855237630 scopus 로고    scopus 로고
    • Domb simplified TRIZ second edition new problem solving applications for engineers and manufacturing professionals
    • Rantanen, K. and Domb, Simplified TRIZ, Second Edition, New Problem Solving Applications for Engineers and Manufacturing Professionals, Auerbach Publications, Taylor & Francis Group, 2008.
    • (2008) Auerbach Publications, Taylor & Francis Group
    • Rantanen, K.1
  • 23
    • 70350149787 scopus 로고    scopus 로고
    • Multi-criteria decision making under uncertainty in rainfall-runoff calibration: A fuzzy compromise programming approach based on alpha level sets
    • Great Rivers, ASCE
    • Shafii, M. and De Smedt, F., Multi-criteria Decision Making under Uncertainty in Rainfall-Runoff Calibration: A Fuzzy Compromise Programming Approach Based on Alpha Level sets, World Environmental and Water Resources Congress, Great Rivers, ASCE, 2009.
    • (2009) World Environmental and Water Resources Congress
    • Shafii, M.1    De Smedt, F.2
  • 24
    • 0031379783 scopus 로고    scopus 로고
    • Multistage heuristic approach for solving infrastructure investment decision problems
    • Hsieh, T. and Liu, H., Multistage Heuristic Approach for Solving Infrastructure Investment Decision Problems, Journal of Infrastructure Systems, 3(4), 1997.
    • (1997) Journal of Infrastructure Systems , vol.3 , Issue.4
    • Hsieh, T.1    Liu, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.