-
1
-
-
84855219088
-
The engineering & construction industry innovation deficit: Is the E&C industry model broken?
-
Working Paper
-
Prieto, B., "The Engineering & Construction Industry Innovation Deficit: Is the E&C Industry Model Broken?", Collaboratory for Research on Global Projects, Working Paper, 2009.
-
(2009)
Collaboratory for Research on Global Projects
-
-
Prieto, B.1
-
2
-
-
84855241220
-
Development and application of a systematic innovation procedure for construction technology
-
Wen-der, Y., Chih-Ming, W. and Teen-wei, H., Development and Application of a Systematic Innovation Procedure for Construction Technology, 26th International Symposium on Automation and Robotics in Construction (ISARC 2009), 2009, 149-159.
-
(2009)
26th International Symposium on Automation and Robotics in Construction (ISARC 2009)
, pp. 149-159
-
-
Wen-Der, Y.1
Chih-Ming, W.2
Teen-wei, H.3
-
3
-
-
84855239820
-
Prioritization model for studies on the emergency transportation systems of large cities after natural disasters-case study: Prioritization model for the research requirements in the field of transportation systems in the tehran metropolitan city
-
Davos, Swiss
-
Yadollahi, M. and Pourreza, M., Prioritization Model for Studies on the Emergency Transportation Systems of Large Cities after Natural Disasters-Case study: Prioritization Model for the Research Requirements in the Field of Transportation Systems in the Tehran Metropolitan City, International Disaster and Risk Conference (IDRC), Davos, Swiss, 2008.
-
(2008)
International Disaster and Risk Conference (IDRC)
-
-
Yadollahi, M.1
Pourreza, M.2
-
4
-
-
84855216930
-
A method for prioritization of vulnerability assessment of technical transportation structures in natural disasters
-
Davos, Swiss
-
Yadollahi, M. and Pourreza, M., A Method for Prioritization of Vulnerability Assessment of Technical Transportation Structures in Natural Disasters, International Disaster and Risk Conference (IDRC), Davos, Swiss, 2010.
-
(2010)
International Disaster and Risk Conference (IDRC)
-
-
Yadollahi, M.1
Pourreza, M.2
-
5
-
-
58849100797
-
A decision support system for road maintenance budget allocation
-
Bjornsson, H. C., De La Garza, J. M. and Nasir, M. J., A Decision Support System for Road Maintenance Budget Allocation, Computing in Civil and Building Engineering, Conference Proceeding Paper, ASCE Library, 2000, 702-709 (Pubitemid 35213252)
-
(2000)
Computing in Civil and Building Engineering
, vol.1
, pp. 702-709
-
-
Bjornsson, H.C.1
De La Garza, J.M.2
Nasir, M.J.3
-
6
-
-
84855226050
-
Management and control of cost and risk for tunnelling and infrastructure projects
-
Reilly, J. and Brown, J., Management and control of cost and risk for tunnelling and infrastructure projects, Tunnelling and Underground Space Technology, 19, 2004, Issues 4-5, P: 330.
-
(2004)
Tunnelling and Underground Space Technology
, vol.19
, Issue.4-5
, pp. 330
-
-
Reilly, J.1
Brown, J.2
-
7
-
-
77950104166
-
Development of a prioritization methodology for maintaining virginia's bridge infrastructure systems
-
University of Virginia, Charlottesville, VA, USA, April 24
-
Gokey, J., Klein, N. and Mackey, C., Development of a Prioritization Methodology for Maintaining Virginia's Bridge Infrastructure Systems, IEEE Systems and Information Engineering Design Symposium, University of Virginia, Charlottesville, VA, USA, April 24, 2009.
-
(2009)
IEEE Systems and Information Engineering Design Symposium
-
-
Gokey, J.1
Klein, N.2
Mackey, C.3
-
8
-
-
77950459241
-
Systematic budget allocation for transportation construction projects: A case in Taiwan
-
Teng, J. Y., Huang, W. C. and Lin, M. C., Systematic budget allocation for transportation construction projects: A case in Taiwan, Transportation, 2010, 37, 331-361.
-
Transportation
, vol.2010
, Issue.37
, pp. 331-361
-
-
Teng, J.Y.1
Huang, W.C.2
Lin, M.C.3
-
10
-
-
84855239826
-
Dominance-based rough set approach to budget allocation in highway maintenance activities
-
ASCE
-
Augeri, M. G., Colombrita, R., Greco, S., Lo Certo, A., Matarazzo, B. and Slowinski, R., Dominance-based Rough Set Approach to Budget Allocation in Highway Maintenance Activities, Journal of Infrastructure Systems, ASCE, 2010.
-
(2010)
Journal of Infrastructure Systems
-
-
Augeri, M.G.1
Colombrita, R.2
Greco, S.3
Lo Certo, A.4
Matarazzo, B.5
Slowinski, R.6
-
13
-
-
57649219956
-
Economic evaluation model for post-earthquake bridge repair/ rehabilitation: Taiwan case studies
-
Min-Yuan, C., Yu-Wei, W., Sheng-Jin, C. and Ming-Chuan, W., Economic evaluation model for post-earthquake bridge repair/rehabilitation: Taiwan case studies, Automation in Construction, 2009, 18, 204-218.
-
(2009)
Automation in Construction
, vol.18
, pp. 204-218
-
-
Min-Yuan, C.1
Yu-Wei, W.2
Sheng-Jin, C.3
Ming-Chuan, W.4
-
14
-
-
33748919100
-
Genetic algorithm-based decision support for the restoration budget allocation of historical buildings
-
Perng, Y. H., Juan, Y. K. and Hsu, H. S., Genetic algorithm-based decision support for the restoration budget allocation of historical buildings, Building and Environment, 2007, 42, 770-778.
-
(2007)
Building and Environment
, vol.42
, pp. 770-778
-
-
Perng, Y.H.1
Juan, Y.K.2
Hsu, H.S.3
-
15
-
-
79957826751
-
-
The Bottom Line: Managing Library, Finances
-
Cross, R. L., NOT SO FAST, Budget allocation formulas: magic or illusion, The Bottom Line: Managing Library, Finances, 2011, 24(1), 63-67.
-
(2011)
NOT SO FAST Budget Allocation Formulas: Magic or Illusion
, vol.24
, Issue.1
, pp. 63-67
-
-
Cross, R.L.1
-
16
-
-
78349297105
-
The budget allocation model of public infrastructure projects
-
Huang, W. C., Teng, J. Y. and Lin, M. C., The Budget Allocation model of Public Infrastructure Projects, Journal of Marine Science and Technology, 2010, 18 (5), 697-708.
-
(2010)
Journal of Marine Science and Technology
, vol.18
, Issue.5
, pp. 697-708
-
-
Huang, W.C.1
Teng, J.Y.2
Lin, M.C.3
-
18
-
-
70350180429
-
Sensitivity analysis of the cost benefit ratio as a function of the level of service targets in the highway maintenance budget allocation process
-
ACSE
-
Krueger, D. A. and De la Garza, J. M., Sensitivity Analysis of the Cost Benefit Ratio as a Function of the Level of Service Targets in the Highway Maintenance Budget Allocation Process, Computing in Civil Engineering, ACSE, 2009, 308-317.
-
(2009)
Computing in Civil Engineering
, pp. 308-317
-
-
Krueger, D.A.1
De La Garza, J.M.2
-
19
-
-
10044264647
-
Modelling prioritized multicriteria decision making
-
Yager, R. R., Modelling Prioritized Multicriteria Decision Making, IEEE Transactions on Systems, Man and Cybernetics, Part B: CYBERNETICS, 2004, 34(6), 2004.
-
(2004)
IEEE Transactions on Systems, Man and Cybernetics, Part B: CYBERNETICS
, vol.34
, Issue.6
, pp. 2004
-
-
Yager, R.R.1
-
20
-
-
84855237630
-
Domb simplified TRIZ second edition new problem solving applications for engineers and manufacturing professionals
-
Rantanen, K. and Domb, Simplified TRIZ, Second Edition, New Problem Solving Applications for Engineers and Manufacturing Professionals, Auerbach Publications, Taylor & Francis Group, 2008.
-
(2008)
Auerbach Publications, Taylor & Francis Group
-
-
Rantanen, K.1
-
22
-
-
84855237634
-
Development of analytical hierarchy process (AHP) method for rehabilitation project ranking before disasters
-
Orlando, USA
-
Yadollahi, M. and Rosli, M. Z., Development of Analytical Hierarchy Process (AHP) Method for Rehabilitation Project Ranking before Disasters, 2nd International Conference on Disaster Management and Human Health: Reducing Risk, Improving Outcomes, Orlando, USA, 2011.
-
(2011)
2nd International Conference on Disaster Management and Human Health: Reducing Risk, Improving Outcomes
-
-
Yadollahi, M.1
Rosli, M.Z.2
-
23
-
-
70350149787
-
Multi-criteria decision making under uncertainty in rainfall-runoff calibration: A fuzzy compromise programming approach based on alpha level sets
-
Great Rivers, ASCE
-
Shafii, M. and De Smedt, F., Multi-criteria Decision Making under Uncertainty in Rainfall-Runoff Calibration: A Fuzzy Compromise Programming Approach Based on Alpha Level sets, World Environmental and Water Resources Congress, Great Rivers, ASCE, 2009.
-
(2009)
World Environmental and Water Resources Congress
-
-
Shafii, M.1
De Smedt, F.2
-
24
-
-
0031379783
-
Multistage heuristic approach for solving infrastructure investment decision problems
-
Hsieh, T. and Liu, H., Multistage Heuristic Approach for Solving Infrastructure Investment Decision Problems, Journal of Infrastructure Systems, 3(4), 1997.
-
(1997)
Journal of Infrastructure Systems
, vol.3
, Issue.4
-
-
Hsieh, T.1
Liu, H.2
|