메뉴 건너뛰기




Volumn 25, Issue 2, 2014, Pages 110-122

Agent-based flow-shop modelling in dynamic environment

Author keywords

Dynamic flow shop; Multi agent system; Re entrant jobs; Scheduling

Indexed keywords

AGENT-BASED MODEL; COORDINATION MECHANISMS; DYNAMIC ENVIRONMENTS; DYNAMIC FLOWS; HIGH-VOLUME PRODUCTION; RE-ENTRANT JOBS; SCHEDULING PROBLEM; SEQUENCE-DEPENDENT SETUP TIME;

EID: 84889816998     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537287.2013.782946     Document Type: Article
Times cited : (25)

References (49)
  • 2
    • 11144220116 scopus 로고    scopus 로고
    • Machine buffer sizing based on the theory of constraint principles and the tabu search technique
    • Apolloni, S., M. Lando, and M. Savino. 2004. "Machine Buffer Sizing Based on the Theory of Constraint Principles and the Tabu Search Technique." Journal of Engineering Manufacture 218 (12): 1825-1832.
    • (2004) Journal of Engineering Manufacture , vol.218 , Issue.12 , pp. 1825-1832
    • Apolloni, S.1    Lando, M.2    Savino, M.3
  • 3
    • 84889825000 scopus 로고    scopus 로고
    • A distributed scheduling methodology for a two-machine flowshop using cooperative interaction via multiple coupling agents
    • Babayan, A., and D. He. 2004. "A Distributed Scheduling Methodology for a Two-machine Flowshop using Cooperative Interaction via Multiple Coupling Agents." International Journal of Production Research 42 (4): 787-710.
    • (2004) International Journal of Production Research , vol.42 , Issue.4 , pp. 787-710
    • Babayan, A.1    He, D.2
  • 5
    • 84889762756 scopus 로고    scopus 로고
    • Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm
    • Chen, J. C., J. Wu, C. Chia-Wen, and C. Kou-Huang. 2012. "Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm." Expert Systems with Applications 5 (12): 122-132.
    • (2012) Expert Systems with Applications , vol.5 , Issue.12 , pp. 122-132
    • Chen, J.C.1    Wu, J.2    Chia-Wen, C.3    Kou-Huang, C.4
  • 7
    • 0030107252 scopus 로고    scopus 로고
    • An evaluation of flow-shop scheduling algorithms for makespan reduction in a stochastic environment
    • Don Taylor, G., S. Venkataraman, and M. Sadiq. 1996. "An Evaluation of Flow-Shop Scheduling Algorithms for Makespan Reduction in a Stochastic Environment." Production Planning & Control 7 (2): 129-143.
    • (1996) Production Planning & Control , vol.7 , Issue.2 , pp. 129-143
    • Don Taylor, G.1    Venkataraman, S.2    Sadiq, M.3
  • 8
    • 57349154329 scopus 로고    scopus 로고
    • A heuristic search algorithm for flow-shop scheduling
    • Fan, J., and G. Winley. 2008. "A Heuristic Search Algorithm for Flow-Shop Scheduling." Informatica 32: 453-464.
    • (2008) Informatica , vol.32 , pp. 453-464
    • Fan, J.1    Winley, G.2
  • 14
    • 78149316201 scopus 로고    scopus 로고
    • A plant growth simulation algorithm for permutation flow shop scheduling to minimize makespan
    • Haibo, T., and Y. Chunming. 2010. "A Plant Growth Simulation Algorithm for Permutation Flow Shop Scheduling to Minimize Makespan." Sixth International Conference on Natural Computation 7: 3748-3752.
    • (2010) Sixth International Conference on Natural Computation , vol.7 , pp. 3748-3752
    • Haibo, T.1    Chunming, Y.2
  • 18
    • 52049090864 scopus 로고    scopus 로고
    • A comparision of scheduling algorithms for flexible flow shop problems with unrelerated parallel machines, setup times, and dual criteria
    • Jitti, J., R. Manop, C. Paveena, and F. Werner. 2009. "A Comparision of Scheduling Algorithms for Flexible Flow Shop Problems with Unrelerated Parallel Machines, Setup Times, and Dual Criteria." Computers and Operations Research 36: 358-378.
    • (2009) Computers and Operations Research , vol.36 , pp. 358-378
    • Jitti, J.1    Manop, R.2    Paveena, C.3    Werner, F.4
  • 19
    • 84889830540 scopus 로고    scopus 로고
    • Modeling and solving of the extended flexible flow shop scheduling problem
    • Kulcsar, G., and F. Erdelyi. 2005. "Modeling and Solving of the Extended Flexible Flow Shop Scheduling Problem." Production Systems and Information Engineering 3: 257-271.
    • (2005) Production Systems and Information Engineering , vol.3 , pp. 257-271
    • Kulcsar, G.1    Erdelyi, F.2
  • 22
    • 34548462907 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
    • Low, C., C. Hsu, and C. Su. 2008. "A Two-stage Hybrid Flowshop Scheduling Problem with a Function Constraint and Unrelated Alternative Machines." Computer and Operation Research 35 (3): 845-853.
    • (2008) Computer and Operation Research , vol.35 , Issue.3 , pp. 845-853
    • Low, C.1    Hsu, C.2    Su, C.3
  • 26
    • 0032649438 scopus 로고    scopus 로고
    • Genetic algorithm for minimizing tardiness in flow-shop scheduling
    • Onwubolu, G., and M. Mutingi. 1999. "Genetic Algorithm for Minimizing Tardiness in Flow-shop Scheduling." Journal of Production Planning & Control 10 (5): 462-447.
    • (1999) Journal of Production Planning & Control , vol.10 , Issue.5 , pp. 462-447
    • Onwubolu, G.1    Mutingi, M.2
  • 27
    • 0041375781 scopus 로고    scopus 로고
    • Go to the ant: Engineering principles from natural multi-agent systems
    • Parunak, H. V. D. 1997. "Go to the Ant: Engineering Principles from Natural Multi-Agent Systems." Annals of Operations Research 75: 69-101.
    • (1997) Annals of Operations Research , vol.75 , pp. 69-101
    • Parunak, H.V.D.1
  • 28
    • 0001027563 scopus 로고    scopus 로고
    • A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments
    • Pendharkar, P. C. 1999. "A Computational Study on Design and Performance Issues of Multi-agent Intelligent Systems for Dynamic Scheduling Environments." Expert Systems with Application 16: 121-133.
    • (1999) Expert Systems with Application , vol.16 , pp. 121-133
    • Pendharkar, P.C.1
  • 30
    • 0035384296 scopus 로고    scopus 로고
    • Constructive and improvement flow shop scheduling heuristics: An extensive evaluation
    • Ponnambalam, S. G., P. Aravindan, and S. Chandrasekaran. 2001. "Constructive and Improvement Flow Shop Scheduling Heuristics: An Extensive Evaluation." Production Planning & Control 12 (4): 335-344.
    • (2001) Production Planning & Control , vol.12 , Issue.4 , pp. 335-344
    • Ponnambalam, S.G.1    Aravindan, P.2    Chandrasekaran, S.3
  • 32
    • 33751501013 scopus 로고    scopus 로고
    • Timed event graph-based cyclic reconfigurable flow shop modelling and optimization
    • Renab, S. C., D. Xua, F. Wanga, and M. Tana. 2007. "Timed Event Graph-based Cyclic Reconfigurable Flow Shop Modelling and Optimization." International Journal of Production Research 45 (1): 257-270.
    • (2007) International Journal of Production Research , vol.45 , Issue.1 , pp. 257-270
    • Renab, S.C.1    Xua, D.2    Wanga, F.3    Tana, M.4
  • 33
    • 34548625026 scopus 로고    scopus 로고
    • Modeling realistic hybrid flexible flowshop scheduling problems
    • Ruiz, R., F. Serifoglu, and T. Urlings. 2008. "Modeling Realistic Hybrid Flexible Flowshop Scheduling Problems." Computer Operation Research 35 (4): 51-75.
    • (2008) Computer Operation Research , vol.35 , Issue.4 , pp. 51-75
    • Ruiz, R.1    Serifoglu, F.2    Urlings, T.3
  • 34
    • 79961244986 scopus 로고    scopus 로고
    • An improved scheduling heuristic algorithm for no-wait flow shops on total flow time criterion
    • Sapkal, S. U., and D. Laha. 2011. "An Improved Scheduling Heuristic Algorithm for No-wait Flow Shops on Total Flow Time Criterion." International Conference on Electronics Computer Technology 3: 159-163.
    • (2011) International Conference on Electronics Computer Technology , vol.3 , pp. 159-163
    • Sapkal, S.U.1    Laha, D.2
  • 36
    • 0034209871 scopus 로고    scopus 로고
    • Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
    • Sawik, T. 2000. "Mixed Integer Programming for Scheduling Flexible Flow Lines with Limited Intermediate Buffers." Mathematical and Computer Modeling 31 (13): 39-52.
    • (2000) Mathematical and Computer Modeling , vol.31 , Issue.13 , pp. 39-52
    • Sawik, T.1
  • 37
    • 0037200415 scopus 로고    scopus 로고
    • An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers
    • Sawik, T. 2002. "An Exact Approach for Batch Scheduling in Flexible Flow Lines with Limited Intermediate Buffers." Mathematical and Computer Modeling 36 (4-5): 461-471.
    • (2002) Mathematical and Computer Modeling , vol.36 , Issue.4-5 , pp. 461-471
    • Sawik, T.1
  • 38
    • 0031142080 scopus 로고    scopus 로고
    • Coordination mechanisms for multi-agent manufacturing systems: Applications to integrated manufacturing scheduling
    • Sikora, R., and M. J. Shaw. 1997. "Coordination Mechanisms for Multi-Agent Manufacturing Systems: Applications to Integrated Manufacturing Scheduling." IEEE Transactions on Engineering Management 44 (2): 175-187.
    • (1997) IEEE Transactions on Engineering Management , vol.44 , Issue.2 , pp. 175-187
    • Sikora, R.1    Shaw, M.J.2
  • 39
    • 0032096675 scopus 로고    scopus 로고
    • Multiagent systems
    • Sycar, K. P. 1998. "Multiagent Systems." AI magazine 19 (2): 290-303.
    • (1998) AI Magazine , vol.19 , Issue.2 , pp. 290-303
    • Sycar, K.P.1
  • 40
    • 84055185233 scopus 로고    scopus 로고
    • A hybrid algorithm for flexible job-shop scheduling problem
    • Tang, J., G. Zhang, B. Lin, and B. Zhang. 2011. "A Hybrid Algorithm for Flexible Job-shop Scheduling Problem." Procedia Engineering 15: 3678-3683.
    • (2011) Procedia Engineering , vol.15 , pp. 3678-3683
    • Tang, J.1    Zhang, G.2    Lin, B.3    Zhang, B.4
  • 44
    • 84937413800 scopus 로고
    • Agent theories, architectures and languages: A survey
    • Wooldridge M., and N. R. Jennings. 1995. "Agent Theories, Architectures and Languages: A Survey." Intelligent Agents: 1-22.
    • (1995) Intelligent Agents , pp. 1-22
    • Wooldridge, M.1    Jennings, N.R.2
  • 46
    • 43549085741 scopus 로고    scopus 로고
    • Modeling and application for multiobjective flow-shop scheduling using hybrid genetic algorithms
    • Wu, J., and W. Jiang. 2007. "Modeling and Application for Multiobjective Flow-shop Scheduling using Hybrid Genetic Algorithms." International Conference on Management Science and Engineering 410-415.
    • (2007) International Conference on Management Science and Engineering , pp. 410-415
    • Wu, J.1    Jiang, W.2
  • 47
    • 0036498313 scopus 로고    scopus 로고
    • Constructing a fuzzy flow-shop sequencing model based on statistical data
    • Yao, J., and F. Lin. 2002. "Constructing a Fuzzy Flow-shop Sequencing Model Based on Statistical Data." International Journal of Approximate Reasoning 29 (3): 215-234.
    • (2002) International Journal of Approximate Reasoning , vol.29 , Issue.3 , pp. 215-234
    • Yao, J.1    Lin, F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.