-
3
-
-
0034298313
-
Hierarchy in distributed shop floor control
-
Bongaerts, L., Monostori, L., McFarlane, D. and Kadar, B. (2000) ‘Hierarchy in distributed shop floor control’, Computers in Industry, Vol. 43, pp.123–137.
-
(2000)
Computers in Industry
, vol.43
, pp. 123-137
-
-
Bongaerts, L.1
Monostori, L.2
McFarlane, D.3
Kadar, B.4
-
4
-
-
0034298926
-
An experimental benchmarking of two multi-agent architectures for production scheduling and control
-
Cavalieri, S., Garetti, M., Macchi, M. and Taisch, M. (2000) ‘An experimental benchmarking of two multi-agent architectures for production scheduling and control’, Computers in Industry, Vol. 43, pp.139–152.
-
(2000)
Computers in Industry
, vol.43
, pp. 139-152
-
-
Cavalieri, S.1
Garetti, M.2
Macchi, M.3
Taisch, M.4
-
8
-
-
0000181327
-
Good parameters and implementations for combined multiple recursive random number generators
-
L’Ecuyer, P. (1999) ‘Good parameters and implementations for combined multiple recursive random number generators’, Operations Research, Vol. 47, No. 1, pp.159–164.
-
(1999)
Operations Research
, vol.47
, Issue.1
, pp. 159-164
-
-
L’Ecuyer, P.1
-
10
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
Li, R.K., Shyu, Y.T. and Adiga, S. (1993) ‘A heuristic rescheduling algorithm for computer-based production scheduling systems’, International Journal of Production Research, Vol. 31, pp.1815–1826.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1815-1826
-
-
Li, R.K.1
Shyu, Y.T.2
Adiga, S.3
-
12
-
-
0041375781
-
“Go to the Ant”: engineering principles from natural multi-agent systems
-
(Special Issue on Artificial Intelligence and Management Science)
-
Parunak, H.V.D. (1997) ‘“Go to the Ant”: engineering principles from natural multi-agent systems’, Annals of Operations Research, Vol. 75, pp.69–101 (Special Issue on Artificial Intelligence and Management Science).
-
(1997)
Annals of Operations Research
, vol.75
, pp. 69-101
-
-
Parunak, H.V.D.1
-
13
-
-
29444438437
-
Dynamic job shop scheduling: a survey of simulation research
-
Ramasesh, R. (1990) ‘Dynamic job shop scheduling: a survey of simulation research’, OMEGA International Journal of Management Science, Vol. 18, No. 1, pp.43–57.
-
(1990)
OMEGA International Journal of Management Science
, vol.18
, Issue.1
, pp. 43-57
-
-
Ramasesh, R.1
-
14
-
-
0242485198
-
Agent-based fractal architecture and modelling for developing distributed manufacturing systems
-
Ryu, K. and Jung, M. (2003) ‘Agent-based fractal architecture and modelling for developing distributed manufacturing systems’, International Journal of Production Research, Vol. 41, No. 17, pp.4233–4255.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.17
, pp. 4233-4255
-
-
Ryu, K.1
Jung, M.2
-
15
-
-
0034326104
-
Analysis of reactive scheduling problems in a job shop environment
-
Sabuncuoglu, I. and Bayiz, M. (2000) ‘Analysis of reactive scheduling problems in a job shop environment’, European Journal of Operational Research, Vol. 126, pp.567–586.
-
(2000)
European Journal of Operational Research
, vol.126
, pp. 567-586
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
16
-
-
0242485199
-
Reactive scheduling in a dynamic and stochastic FMS environment
-
Sabuncuoglu, I. and Kizilisik, O.B. (2003) ‘Reactive scheduling in a dynamic and stochastic FMS environment’, International Journal of Production Research, Vol. 41, No. 17, pp.4211–4231.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.17
, pp. 4211-4231
-
-
Sabuncuoglu, I.1
Kizilisik, O.B.2
-
17
-
-
85133749042
-
Agent-based systems for intelligent manufacturing: a state-of-the-art survey
-
Shen, W. and Norrie, D.H. (1999) ‘Agent-based systems for intelligent manufacturing: a state-of-the-art survey’, International Journal Knowledge and Information Systems, Vol. 1, pp.129–156.
-
(1999)
International Journal Knowledge and Information Systems
, vol.1
, pp. 129-156
-
-
Shen, W.1
Norrie, D.H.2
-
18
-
-
0019180974
-
The contract net protocol: high-level communication and control in a distributed problem solver
-
Smith, R.G. (1980) ‘The contract net protocol: high-level communication and control in a distributed problem solver’, IEEE Transactions on Computers, Vol. C-29, No. 12, pp.1104–1113.
-
(1980)
IEEE Transactions on Computers
, vol.C-29
, Issue.12
, pp. 1104-1113
-
-
Smith, R.G.1
-
19
-
-
85008802627
-
Results of the holonic system benchmark at KU Leuven
-
10–12 October, Troy, New York
-
Valckenaers, P., Bonneville, F., Brussel, H.V. and Wyns, J. (1994) ‘Results of the holonic system benchmark at KU Leuven’, Proceedings of the Fourth International Conference on Computer Integrated Manufacturing and Automation Technology, 10–12 October, Troy, New York, pp.128–133.
-
(1994)
Proceedings of the Fourth International Conference on Computer Integrated Manufacturing and Automation Technology
, pp. 128-133
-
-
Valckenaers, P.1
Bonneville, F.2
Brussel, H.V.3
Wyns, J.4
-
20
-
-
0242703954
-
Rescheduling manufacturing systems: a framework of strategies, policies, and methods
-
Vieira, G.E., Herrmann, J.W. and Lin, E. (2003) ‘Rescheduling manufacturing systems: a framework of strategies, policies, and methods’, Journal of Scheduling, Vol. 6, No. 1, pp.39–62.
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
|