Hybrid flow shop scheduling: A survey
-
R. Linn, W. Zhang, Hybrid Flow Shop Scheduling: A survey, Computer & Industrial Engineering, vol. 37, pp. 57-61, 1999.
-
(1999)
Computer & Industrial Engineering
, vol.37
, pp. 57-61
-
-
Linn, R.1
Zhang, W.2
-
2
-
-
0034209871
-
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
-
T. Sawik, Mixed Integer Programming for Scheduling Flexible Flow Lines with Limited Intermediate Buffers, Mathematical and Computer Modeling, vol. 31, pp. 39-52, 2000.
-
(2000)
Mathematical and Computer Modeling
, vol.31
, pp. 39-52
-
-
Sawik, T.1
-
3
-
-
38849188495
-
Scheduling multistage batch plants with parallel units and no intermediate storage
-
Y. Liu, I. A. Karimi, Scheduling Multistage Batch Plants with Parallel Units and No Intermediate Storage, Computers and Chemical Engineering, vol. 32, pp. 671-693, 2008.
-
(2008)
Computers and Chemical Engineering
, vol.32
, pp. 671-693
-
-
Liu, Y.1
Karimi, I.A.2
-
4
-
-
0038486864
-
Comparing scheduling rules for flexible flow lines
-
M. E. Kurz, R. G. Askin, Comparing Scheduling Rules for Flexible Flow Lines, International Journal of Production Economics, vol. 85, pp. 371-388, 2003.
-
(2003)
International Journal of Production Economics
, vol.85
, pp. 371-388
-
-
Kurz, M.E.1
Askin, R.G.2
-
5
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
M. E. Kurz, R. G. Askin, Scheduling Flexible Flow Lines with Sequence-Dependent Setup Times, European Journal of Operational Research, vol. 159, pp. 66-82, 2004.
-
(2004)
European Journal of Operational Research
, vol.159
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
6
-
-
33845458698
-
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shop with limited intermediate buffers: The finite horizon case
-
B. Akrami, B. Karimi, S. M. M. Hosseini, Two Metaheuristic Methods for the Common Cycle Economic Lot Sizing and Scheduling in Flexible Flow Shop with Limited Intermediate Buffers: The Finite Horizon Case, Applied Mathematics and Computation, vol. 183, pp. 634-645, 2006.
-
(2006)
Applied Mathematics and Computation
, vol.183
, pp. 634-645
-
-
Akrami, B.1
Karimi, B.2
Hosseini, S.M.M.3
-
7
-
-
67349149013
-
Bottleneck-based heuristics to minimize total tardiness for the flexible flow line with unrelated parallel machines
-
C. L. Chen, C. L. Chen, Bottleneck-based Heuristics to Minimize Total Tardiness for the Flexible Flow Line with Unrelated Parallel Machines, Computers & Industrial Engineering, vol. 56, Issue 4, pp. 1393-1401, 2009.
-
(2009)
Computers & Industrial Engineering
, vol.56
, Issue.4
, pp. 1393-1401
-
-
Chen, C.L.1
Chen, C.L.2
-
8
-
-
52049091896
-
A memetic algorithm for the flexible flow line scheduling problem with processor blocking
-
R. T. Moghaddam, N. Safaei, F. Sassani, A Memetic Algorithm for the Flexible Flow Line Scheduling Problem with Processor Blocking, Computers & Operations Research, vol. 36, Issue 2, pp. 402-414, 2009.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.2
, pp. 402-414
-
-
Moghaddam, R.T.1
Safaei, N.2
Sassani, F.3
-
9
-
-
70350738588
-
Distributed feedback mechanism for just-in-time scheduling problem
-
Shanghai, China
-
W. Weng, S. Fujimura, Distributed Feedback Mechanism for Just-In-Time Scheduling Problem, Proc. of 8th IEEE/ACIS International Conference on Computer and Information Science (ICIS 2009), Shanghai, China, 2009.6.
-
(2009)
Proc. of 8th IEEE/ACIS International Conference on Computer and Information Science (ICIS 2009)
, pp. 6
-
-
Weng, W.1
Fujimura, S.2
-
10
-
-
77955314470
-
Distributed intelligence approaches for weighted just-in-time production
-
In press
-
W. Weng, S. Fujimura, Distributed Intelligence Approaches for Weighted Just-In-Time Production, Transactions on Electrical and Electronic Engineering, Vol. 5, No.6, 2010. In press.
-
(2010)
Transactions on Electrical and Electronic Engineering
, vol.5
, Issue.6
-
-
Weng, W.1
Fujimura, S.2
|