Volumn , Issue , 2010, Pages 113-120

Flexible flow shop scheduling by intelligent multi-agents

Author keywords

[No Author keywords available]

Indexed keywords

CORRESPONDING SOLUTIONS; EARLINESS AND TARDINESS PENALTIES; FLEXIBLE FLOW SHOP; MACHINE UTILIZATION; MULTI-AGENT; MULTI-STAGE; PRODUCTION SYSTEM; REAL-TIME INFORMATION; RESEARCH OBJECTIVES;

EID: 77955316679     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SERA.2010.24     Document Type: Conference Paper
Times cited : (4)

References (10)
  • 2
    • 0034209871 scopus 로고    scopus 로고
    • Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
    • T. Sawik, Mixed Integer Programming for Scheduling Flexible Flow Lines with Limited Intermediate Buffers, Mathematical and Computer Modeling, vol. 31, pp. 39-52, 2000.
    • (2000) Mathematical and Computer Modeling , vol.31 , pp. 39-52
    • Sawik, T.1
  • 3
    • 38849188495 scopus 로고    scopus 로고
    • Scheduling multistage batch plants with parallel units and no intermediate storage
    • Y. Liu, I. A. Karimi, Scheduling Multistage Batch Plants with Parallel Units and No Intermediate Storage, Computers and Chemical Engineering, vol. 32, pp. 671-693, 2008.
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 671-693
    • Liu, Y.1    Karimi, I.A.2
  • 5
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • M. E. Kurz, R. G. Askin, Scheduling Flexible Flow Lines with Sequence-Dependent Setup Times, European Journal of Operational Research, vol. 159, pp. 66-82, 2004.
    • (2004) European Journal of Operational Research , vol.159 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 6
    • 33845458698 scopus 로고    scopus 로고
    • Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shop with limited intermediate buffers: The finite horizon case
    • B. Akrami, B. Karimi, S. M. M. Hosseini, Two Metaheuristic Methods for the Common Cycle Economic Lot Sizing and Scheduling in Flexible Flow Shop with Limited Intermediate Buffers: The Finite Horizon Case, Applied Mathematics and Computation, vol. 183, pp. 634-645, 2006.
    • (2006) Applied Mathematics and Computation , vol.183 , pp. 634-645
    • Akrami, B.1    Karimi, B.2    Hosseini, S.M.M.3
  • 7
    • 67349149013 scopus 로고    scopus 로고
    • Bottleneck-based heuristics to minimize total tardiness for the flexible flow line with unrelated parallel machines
    • C. L. Chen, C. L. Chen, Bottleneck-based Heuristics to Minimize Total Tardiness for the Flexible Flow Line with Unrelated Parallel Machines, Computers & Industrial Engineering, vol. 56, Issue 4, pp. 1393-1401, 2009.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.4 , pp. 1393-1401
    • Chen, C.L.1    Chen, C.L.2
  • 8
    • 52049091896 scopus 로고    scopus 로고
    • A memetic algorithm for the flexible flow line scheduling problem with processor blocking
    • R. T. Moghaddam, N. Safaei, F. Sassani, A Memetic Algorithm for the Flexible Flow Line Scheduling Problem with Processor Blocking, Computers & Operations Research, vol. 36, Issue 2, pp. 402-414, 2009.
    • (2009) Computers & Operations Research , vol.36 , Issue.2 , pp. 402-414
    • Moghaddam, R.T.1    Safaei, N.2    Sassani, F.3
  • 10
    • 77955314470 scopus 로고    scopus 로고
    • Distributed intelligence approaches for weighted just-in-time production
    • In press
    • W. Weng, S. Fujimura, Distributed Intelligence Approaches for Weighted Just-In-Time Production, Transactions on Electrical and Electronic Engineering, Vol. 5, No.6, 2010. In press.
    • (2010) Transactions on Electrical and Electronic Engineering , vol.5 , Issue.6
    • Weng, W.1    Fujimura, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.