메뉴 건너뛰기




Volumn 2, Issue , 2006, Pages 679-683

A multi-agent agile scheduling system for job-shop problem

Author keywords

[No Author keywords available]

Indexed keywords

PROBLEM SOLVING; RESOURCE ALLOCATION; SCHEDULING;

EID: 34547504863     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ISDA.2006.253918     Document Type: Conference Paper
Times cited : (5)

References (7)
  • 1
    • 85133749042 scopus 로고    scopus 로고
    • Agent-Based Systems for Intelligent Manufacturing: A State-of-the-Art Survey
    • W. Shen, and D.H. Norrie, "Agent-Based Systems for Intelligent Manufacturing: A State-of-the-Art Survey", Knowledge and information Systems, an International Journal, Vol. 1, No. 2, pp. 129-156, 1999.
    • (1999) Knowledge and information Systems, an International Journal , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 2
    • 0031621768 scopus 로고    scopus 로고
    • Baker, A. D., A Survey of Factory Control Algorithms. That Can Be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling and Pull. J of Manuf. Sys., 17, pp. 297-320, 1998.
    • Baker, A. D., A Survey of Factory Control Algorithms. That Can Be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling and Pull. J of Manuf. Sys., 17, pp. 297-320, 1998.
  • 4
    • 0034965559 scopus 로고    scopus 로고
    • Sujimura.Y, Mafune, Y.; Gen, M.; Effects of Symbiotic Evolution in Genetic Algorithms for Job-Shop Scheduling. System Sciences 2001 Proceedings of the 34th Annual Hawaii International Conference on Jan 3-6 2001 Page(s):6 pp.
    • Sujimura.Y, Mafune, Y.; Gen, M.; Effects of Symbiotic Evolution in Genetic Algorithms for Job-Shop Scheduling. System Sciences 2001 Proceedings of the 34th Annual Hawaii International Conference on Jan 3-6 2001 Page(s):6 pp.
  • 5
    • 4444333857 scopus 로고    scopus 로고
    • Intelligent Control and Automation, 2004. WCICA 2004
    • 4, 15-19 June Pages
    • Yanhong Wang; Juan Song; Caowan Yin; Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on Volume 4,15-19 June 2004 Page(s):2881-2884 Vol.4.
    • (2004) Fifth World Congress on , vol.4 , pp. 2881-2884
    • Wang, Y.1    Song, J.2    Yin, C.3
  • 6
    • 15744400692 scopus 로고    scopus 로고
    • Boccalatte A, Gozzi A, Paolucci M. A Multi-Agent System for Dynamic Just-in-time Manufacturing Production Scheduling [J]. IEEE International Conference , 2004, 6, 5548-5553.
    • Boccalatte A, Gozzi A, Paolucci M. A Multi-Agent System for Dynamic Just-in-time Manufacturing Production Scheduling [J]. IEEE International Conference , 2004, vol.6, 5548-5553.
  • 7
    • 0001947856 scopus 로고
    • Probabilistic Learning Combinations of Local Job-Shop Scheduling Rules
    • J. Muth and G. Thompson eds, Prentice-Hall, pp
    • H. Fisher and G. Thompson: Probabilistic Learning Combinations of Local Job-Shop Scheduling Rules, In Industrial Scheduling, J. Muth and G. Thompson eds., Prentice-Hall, pp.1225-1251 (1963).
    • (1963) Industrial Scheduling , pp. 1225-1251
    • Fisher, H.1    Thompson, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.