메뉴 건너뛰기




Volumn 66, Issue 4, 2013, Pages 879-888

Economic production quantity models for deteriorating/imperfect products and service with rework

Author keywords

Deteriorating items; Economic production quantity (EPQ); Imperfect quality; Rework; Shortages backordering

Indexed keywords

BACKORDERING; DETERIORATING ITEMS; ECONOMIC PRODUCTION QUANTITY; IMPERFECT QUALITY; REWORK;

EID: 84888287911     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2013.09.007     Document Type: Article
Times cited : (61)

References (35)
  • 1
    • 85079787445 scopus 로고    scopus 로고
    • Development and management of corporate image in South Africa
    • R. Abratt, and T.N. Mofokeng Development and management of corporate image in South Africa European Journal of Marketing 35 3/4 2001 368 386
    • (2001) European Journal of Marketing , vol.35 , Issue.34 , pp. 368-386
    • Abratt, R.1    Mofokeng, T.N.2
  • 2
    • 33747026665 scopus 로고    scopus 로고
    • Optimizing a production system with rework and equal sized batch shipments
    • DOI 10.1016/j.cor.2005.03.011, PII S0305054805001061
    • U. Buscher, and G. Lindner Optimizing a production system with rework and equal sized batch shipments Computers (Pubitemid 44205371)
    • (2007) Computers and Operations Research , vol.34 , Issue.2 , pp. 515-535
    • Buscher, U.1    Lindner, G.2
  • 3
    • 69649103599 scopus 로고    scopus 로고
    • Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
    • L.E. Cárdenas-Barrón Economic production quantity with rework process at a single-stage manufacturing system with planned backorders Computers & Industrial Engineering 57 3 2009 1105 1113
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.3 , pp. 1105-1113
    • Cárdenas-Barrón, L.E.1
  • 4
    • 0345872325 scopus 로고    scopus 로고
    • A new EPQ model: Integrating lower pricing, rework and reject situations
    • W.M. Chan, R.N. Ibrahim, and P.B. Lochert A new EPQ model: Integrating lower pricing, rework and reject situations Production Planning & Control 14 7 2003 588 595
    • (2003) Production Planning & Control , vol.14 , Issue.7 , pp. 588-595
    • Chan, W.M.1    Ibrahim, R.N.2    Lochert, P.B.3
  • 5
    • 70649114418 scopus 로고    scopus 로고
    • Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"
    • H.C. Chang, and C.H. Ho Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering" Omega 38 3-4 2010 233 237
    • (2010) Omega , vol.38 , Issue.34 , pp. 233-237
    • Chang, H.C.1    Ho, C.H.2
  • 6
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • DOI 10.1016/j.ejor.2006.05.005, PII S0377221706003353
    • S.W. Chiu, S.L. Wang, and Y.S.P. Chiu Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns European Journal of Operational Research 180 2 2007 664 676 (Pubitemid 46199072)
    • (2007) European Journal of Operational Research , vol.180 , Issue.2 , pp. 664-676
    • Chiu, S.W.1    Wang, S.-L.2    Chiu, Y.-S.P.3
  • 7
    • 78649323401 scopus 로고    scopus 로고
    • Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system
    • C.J. Chung, and H.M. Wee Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system International Journal of Production Economics 129 1 2011 195 203
    • (2011) International Journal of Production Economics , vol.129 , Issue.1 , pp. 195-203
    • Chung, C.J.1    Wee, H.M.2
  • 8
    • 59049103474 scopus 로고    scopus 로고
    • A two-warehouse inventory model with imperfect quality production processes
    • K.J. Chung, C.C. Her, and S.D. Lin A two-warehouse inventory model with imperfect quality production processes Computers & Industrial Engineering 56 1 2009 193 197
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 193-197
    • Chung, K.J.1    Her, C.C.2    Lin, S.D.3
  • 9
    • 0018026559 scopus 로고
    • Integrating human factors models into statistical quality control
    • C.G. Drury Integrating human factors models into statistical quality control Human Factors: The Journal of the Human Factors and Ergonomics Society 20 5 1978 561 572 (Pubitemid 9034682)
    • (1978) Human Factors , vol.20 , Issue.5 , pp. 561-572
    • Drury, C.G.1
  • 11
    • 34249876921 scopus 로고    scopus 로고
    • An economic production lot size model with increasing demand, shortages and partial backlogging
    • DOI 10.1111/j.1475-3995.2005.00500.x
    • B.C. Giri, A.K. Jalan, and K.S. Chaudhuri An economic production lot size model with increasing demand, shortages and partial backlogging International Transactions in Operational Research 12 2005 235 245 (Pubitemid 40345227)
    • (2005) International Transactions In Operational Researc , vol.12 , Issue.2 , pp. 235-245
    • Giri, B.C.1    Jalan, A.K.2    Chaudhuri, K.S.3
  • 13
    • 84872732426 scopus 로고    scopus 로고
    • A multi-stage production-inventory model with learning and forgetting effects, rework and scrap
    • C.H. Glock, and M.Y. Jaber A multi-stage production-inventory model with learning and forgetting effects, rework and scrap Computers & Industrial Engineering 64 2 2013 708 720
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.2 , pp. 708-720
    • Glock, C.H.1    Jaber, M.Y.2
  • 14
    • 84870664063 scopus 로고    scopus 로고
    • Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns
    • J.T. Hsu, and L.F. Hsu Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns Computers & Industrial Engineering 64 1 2013 389 402
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.1 , pp. 389-402
    • Hsu, J.T.1    Hsu, L.F.2
  • 15
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A.M.M. Jamal, B.R. Sarker, and S. Sanjay Mondal Optimal manufacturing batch size with rework process at a single-stage production system Computers & Industrial Engineering 47 1 2004 77 89
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.1 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Sanjay Mondal, S.3
  • 17
    • 33750797755 scopus 로고    scopus 로고
    • On an EPQ model for deteriorating items under permissible delay in payments
    • J.J. Liao On an EPQ model for deteriorating items under permissible delay in payments Applied Mathematical Modelling 31 3 2007 393 403
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.3 , pp. 393-403
    • Liao, J.J.1
  • 18
    • 33646519233 scopus 로고    scopus 로고
    • Determining a common production cycle time for an economic lot scheduling problem with deteriorating items
    • G.C. Lin, D.E. Kroll, and C.J. Lin Determining a common production cycle time for an economic lot scheduling problem with deteriorating items European Journal of Operational Research 173 2 2006 669 682
    • (2006) European Journal of Operational Research , vol.173 , Issue.2 , pp. 669-682
    • Lin, G.C.1    Kroll, D.E.2    Lin, C.J.3
  • 19
    • 0023168332 scopus 로고
    • Determining optimal production-inventory control policies for an inventory system with partial backlogging
    • DOI 10.1016/0305-0548(87)90067-0
    • K.L. Mak Determining optimal production-inventory control policies for an inventory system with partial backlogging Computers & Operations Research 14 1987 299 304 (Pubitemid 17621254)
    • (1987) Computers and Operations Research , vol.14 , Issue.4 , pp. 299-304
    • Mak, K.L.1
  • 21
    • 50349095709 scopus 로고    scopus 로고
    • The deterministic EPQ with partial backordering: A new approach
    • D.W. Pentico, M.J. Drake, and C. Toews The deterministic EPQ with partial backordering: A new approach Omega 37 2009 624 636
    • (2009) Omega , vol.37 , pp. 624-636
    • Pentico, D.W.1    Drake, M.J.2    Toews, C.3
  • 22
    • 44649137961 scopus 로고    scopus 로고
    • A deterministic, multi-item inventory model with supplier selection and imperfect quality
    • DOI 10.1016/j.apm.2007.07.009, PII S0307904X07001771
    • J. Rezaei, and M. Davoodi A deterministic, multi-item inventory model with supplier selection and imperfect quality Applied Mathematical Modelling 32 10 2008 2106 2116 (Pubitemid 351773026)
    • (2008) Applied Mathematical Modelling , vol.32 , Issue.10 , pp. 2106-2116
    • Rezaei, J.1    Davoodi, M.2
  • 23
    • 0033874992 scopus 로고    scopus 로고
    • Economic production quantity model for items with imperfect quality
    • DOI 10.1016/S0925-5273(99)00044-4
    • M.K. Salameh, and M.Y. Jaber Economic production quantity model for items with imperfect quality International Journal of Production Economics 64 2000 59 64 (Pubitemid 30557643)
    • (2000) International Journal of Production Economics , vol.64 , Issue.1 , pp. 59-64
    • Salameh, M.K.1    Jaber, M.Y.2
  • 27
    • 4544290995 scopus 로고    scopus 로고
    • Economic production quantity models for deteriorating items with price- and stock-dependent demand
    • J.T. Teng, and C.T. Chang Economic production quantity models for deteriorating items with price- and stock-dependent demand Computers & Operations Research 32 2 2005 297 308
    • (2005) Computers & Operations Research , vol.32 , Issue.2 , pp. 297-308
    • Teng, J.T.1    Chang, C.T.2
  • 28
    • 33750985387 scopus 로고    scopus 로고
    • A comparison between two pricing and lot-sizing models with partial backlogging and deteriorated items
    • J.T. Teng, L.Y. Ouyang, and L.H. Chen A comparison between two pricing and lot-sizing models with partial backlogging and deteriorated items International Journal of Production Economics 105 1 2007 190 203
    • (2007) International Journal of Production Economics , vol.105 , Issue.1 , pp. 190-203
    • Teng, J.T.1    Ouyang, L.Y.2    Chen, L.H.3
  • 29
    • 84888295282 scopus 로고    scopus 로고
    • Economic order and production quantity models without constraint on the percentage of defective items
    • J. Vörös Economic order and production quantity models without constraint on the percentage of defective items Central European Journal of Operations Research 2012 1 19
    • (2012) Central European Journal of Operations Research , pp. 1-19
    • Vörös, J.1
  • 30
    • 0027624316 scopus 로고
    • Economic production lot size model for deteriorating items with partial back-ordering
    • H.M. Wee Economic production lot size model for deteriorating items with partial back-ordering Computers & Industrial Engineering 24 3 1993 449 458
    • (1993) Computers & Industrial Engineering , vol.24 , Issue.3 , pp. 449-458
    • Wee, H.M.1
  • 32
    • 84859892101 scopus 로고    scopus 로고
    • An economic production quantity model for deteriorating items with multiple production setups and rework
    • G.A. Widyadana, and H.M. Wee An economic production quantity model for deteriorating items with multiple production setups and rework International Journal of Production Economics 138 1 2012 62 67
    • (2012) International Journal of Production Economics , vol.138 , Issue.1 , pp. 62-67
    • Widyadana, G.A.1    Wee, H.M.2
  • 33
    • 33644690197 scopus 로고    scopus 로고
    • A collaborative inventory system with permissible delay in payment for deteriorating items
    • DOI 10.1016/j.mcm.2005.09.029, PII S0895717705004474
    • P.C. Yang, and H.M. Wee A collaborative inventory system with permissible delay in payment for deteriorating items Mathematical and Computer Modelling 43 3-4 2006 209 221 (Pubitemid 43330852)
    • (2006) Mathematical and Computer Modelling , vol.43 , Issue.3-4 , pp. 209-221
    • Yang, P.C.1    Wee, H.M.2
  • 34
    • 80055047692 scopus 로고    scopus 로고
    • Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model
    • A. Yassine, B. Maddah, and M. Salameh Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model International Journal of Production Economics 135 1 2012 345 352
    • (2012) International Journal of Production Economics , vol.135 , Issue.1 , pp. 345-352
    • Yassine, A.1    Maddah, B.2    Salameh, M.3
  • 35
    • 69349091956 scopus 로고    scopus 로고
    • Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return
    • S.H. Yoo, D.S. Kim, and M.S. Park Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return International Journal of Production Economics 121 1 2009 255 265
    • (2009) International Journal of Production Economics , vol.121 , Issue.1 , pp. 255-265
    • Yoo, S.H.1    Kim, D.S.2    Park, M.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.