-
1
-
-
34447260758
-
On optimal manufacturing batch size with rework process at single-stage production system
-
DOI 10.1016/j.cie.2007.04.008, PII S036083520700068X
-
Cárdenas-Barrón, L.E. (2007) 'On optimal manufacturing batch size with rework process at singlestage production system', Computers & Industrial Engineering, Vol. 53, pp.196-198. (Pubitemid 47044901)
-
(2007)
Computers and Industrial Engineering
, vol.53
, Issue.1
, pp. 196-198
-
-
Cardenas-Barron, L.E.1
-
2
-
-
55649099841
-
Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation
-
Cardenas-Barron, L.E. (2008) 'Optimal manufacturing batch size with rework in a single-stage production system - a simple derivation', Computers and Industrial Engineering, Vol. 55, pp.758-765.
-
(2008)
Computers and Industrial Engineering
, vol.55
, pp. 758-765
-
-
Cardenas-Barron, L.E.1
-
3
-
-
69649103599
-
Economic production quantity with rework process at a single-stage manufacturing system with planned back-orders
-
Cardenas-Barron, L.E. (2009) 'Economic production quantity with rework process at a single-stage manufacturing system with planned back-orders', Computers & Industrial Engineering, Vol. 57, pp.1105-1113.
-
(2009)
Computers & Industrial Engineering
, vol.57
, pp. 1105-1113
-
-
Cardenas-Barron, L.E.1
-
4
-
-
58849151362
-
On optimal batch sizing in a multi-stage production system with rework consideration
-
Cárdenas-Barrón, L.E. (2009) 'On optimal batch sizing in a multi-stage production system with rework consideration', European Journal of Operational Research, Vol. 196, pp.1238-1244.
-
(2009)
European Journal of Operational Research
, vol.196
, pp. 1238-1244
-
-
Cárdenas-Barrón, L.E.1
-
5
-
-
84969446242
-
Meta heuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach
-
Chandrasekaran, C., Rajendran, C., Krishnaiah-Chetty, O.V. and Hanumanna, D. (2007) 'Meta heuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach', European Journal of Industrial Engineering, Vol. 1, pp.152-181.
-
(2007)
European Journal of Industrial Engineering
, vol.1
, pp. 152-181
-
-
Chandrasekaran, C.1
Rajendran, C.2
Krishnaiah-Chetty, O.V.3
Hanumanna, D.4
-
6
-
-
2642535091
-
An application of fuzzy sets theory to the EOQ model with imperfect quality items
-
DOI 10.1016/S0305-0548(03)00166-7, PII S0305054803001667
-
Chang, H-C. (2004) 'An application of fuzzy sets theory to the EOQ model with imperfect quality items', Computers and Operations Research, Vol. 31, pp.2079-2092. (Pubitemid 38728570)
-
(2004)
Computers and Operations Research
, vol.31
, Issue.12
, pp. 2079-2092
-
-
Chang, H.-C.1
-
7
-
-
8744223416
-
Effects of random defective rate and imperfect rework process on economic production quantity model
-
Chiu, S.W., Gong, D.C. and Wee, H.M. (2004) 'Effects of random defective rate and imperfect rework process on economic production quantity model', Japan Journal of Industrial and Applied Mathematics, Vol. 21, pp.375-389. (Pubitemid 39519060)
-
(2004)
Japan Journal of Industrial and Applied Mathematics
, vol.21
, Issue.3
, pp. 375-389
-
-
Chiu, S.W.1
Gong, D.-C.2
Wee, H.-M.3
-
8
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
DOI 10.1016/j.ejor.2006.05.005, PII S0377221706003353
-
Chiu, S.W., Wang, S.L. and Chiu, Y.S.P. (2007) 'Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns', European Journal of Operational Research, Vol. 180, pp.664-676. (Pubitemid 46199072)
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.2
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.-L.2
Chiu, Y.-S.P.3
-
9
-
-
34247556105
-
A generalized ordering and recovery policy for reusable items
-
DOI 10.1016/j.ejor.2006.08.048, PII S0377221706008897
-
Choi, D.W., Hwang, H. and Koh, S.G. (2007) 'A generalized ordering and recovery policy for reusable items', European Journal of Operational Research, Vol. 182, pp.764-774. (Pubitemid 46667210)
-
(2007)
European Journal of Operational Research
, vol.182
, Issue.2
, pp. 764-774
-
-
Choi, D.-W.1
Hwang, H.2
Koh, S.-G.3
-
10
-
-
0036568439
-
Note on: Economic production quantity model for items with imperfect quality - A practical approach
-
DOI 10.1016/S0925-5273(01)00203-1, PII S0925527301002031
-
Goyal, S.K. and Cardenas-Barron, L.E. (2002) 'Note on economic production quantity model for items with imperfect quality - a practical approach', International Journal of Production Economics, Vol. 77, pp.85-87. (Pubitemid 34284489)
-
(2002)
International Journal of Production Economics
, vol.77
, Issue.1
, pp. 85-87
-
-
Goyal, S.K.1
Cardenas-Barron, L.E.2
-
11
-
-
69649095716
-
Economic production quantity with imperfect production system
-
Goyal, S.K. and Cárdenas-Barrón, L.E. (2005) 'Economic production quantity with imperfect production system', Industrial Engineering Journal, Vol. 34, pp.33-36.
-
(2005)
Industrial Engineering Journal
, vol.34
, pp. 33-36
-
-
Goyal, S.K.1
Cárdenas-Barrón, L.E.2
-
12
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
DOI 10.1080/095372801750397707
-
Hayek, P.A. and Salameh, M.K. (2001) 'Production lot sizing with the reworking of imperfect quality items produced', Production Planning and Control, Vol. 12, pp.584-590. (Pubitemid 35395061)
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
13
-
-
3242717595
-
An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration
-
Huang, C-K. (2004) 'An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration', International Journal of Production Economics, Vol. 91, pp.91-98.
-
(2004)
International Journal of Production Economics
, vol.91
, pp. 91-98
-
-
Huang, C.-K.1
-
14
-
-
49049117993
-
Economic production quantity model for items with imperfect quality subject to learning effects
-
Jaber, M.Y., Goyal, S.K. and Imran, M. (2008) 'Economic production quantity model for items with imperfect quality subject to learning effects', International Journal of Production Economics, Vol. 115, pp.143-150.
-
(2008)
International Journal of Production Economics
, vol.115
, pp. 143-150
-
-
Jaber, M.Y.1
Goyal, S.K.2
Imran, M.3
-
15
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
Jamal, A.M.M., Sarker, B.R. and Mondal, S. (2004) 'Optimal manufacturing batch size with rework process at a single-stage production system', Computers and Industrial Engineering, Vol. 47, pp.77-89.
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
16
-
-
56249098653
-
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
-
Liao, G.L., Chen, Y.H. and Sheu, S.H. (2009) 'Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance', European Journal of Operational Research, Vol. 195, pp.348-357.
-
(2009)
European Journal of Operational Research
, vol.195
, pp. 348-357
-
-
Liao, G.L.1
Chen, Y.H.2
Sheu, S.H.3
-
17
-
-
41749111161
-
A time-varying lot size method for the economic lot scheduling problem with shelf life considerations
-
DOI 10.1504/EJIE.2008.017689
-
Liu, J., Wu, L. and Zhou, Z. (2008) 'A time-varying lot size method for the economic lot scheduling problem with shelf life considerations', European Journal of Industrial Engineering, Vol. 2, pp.337-355. (Pubitemid 351486197)
-
(2008)
European Journal of Industrial Engineering
, vol.2
, Issue.3
, pp. 337-355
-
-
Liu, J.1
Wu, L.2
Zhou, Z.3
-
18
-
-
44449162546
-
Multi-item, economic order quantity model with permissible delay in payments and a budget constraint
-
DOI 10.1504/EJIE.2008.018439
-
Mohan, S., Mohan, G. and Chandrasekhar, A. (2008) 'Multi-item, economic order quantity model with permissible delay in payments and a budget constraint', European Journal of Industrial Engineering, Vol. 2, pp.446-460. (Pubitemid 351767068)
-
(2008)
European Journal of Industrial Engineering
, vol.2
, Issue.4
, pp. 446-460
-
-
Mohan, S.1
Mohan, G.2
Chandrasekhar, A.3
-
19
-
-
65649124587
-
Optimal batch sizing, quality improvement and rework for an imperfect production system with inspection and restoration
-
Parveen, M. and Rao, T.V.V.L.N. (2008) 'Optimal batch sizing, quality improvement and rework for an imperfect production system with inspection and restoration', European Journal of Industrial Engineering, Vol. 3, pp.305-335.
-
(2008)
European Journal of Industrial Engineering
, vol.3
, pp. 305-335
-
-
Parveen, M.1
Rao, T.V.V.L.N.2
-
20
-
-
37349077845
-
A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space
-
DOI 10.1016/j.amc.2007.05.007, PII S0096300307005802
-
Pasandideh, S.H.R. and Niaki, S.T.A. (2008) 'A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space', Applied Mathematics and Computation, Vol. 195, pp.506-514. (Pubitemid 350309632)
-
(2008)
Applied Mathematics and Computation
, vol.195
, Issue.2
, pp. 506-514
-
-
Pasandideh, S.H.R.1
Niaki, S.T.A.2
-
21
-
-
34548565651
-
Optimal batch sizing in a multi-stage production system with rework consideration
-
DOI 10.1016/j.ejor.2006.12.005, PII S0377221706012033
-
Sarker, B.R., Jamal, A.A.M. and Mondal, S. (2008) 'Optimal batch sizing in a multi-stage production system with rework consideration', European Journal of Operational Research, Vol. 184, pp.915-929. (Pubitemid 47391152)
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.1
Jamal, A.M.M.2
Mondal, S.3
-
22
-
-
79951600389
-
Economic production quantity model with scrapped items and limited production capacity
-
Taleizadeh, A.A., Najafi, A.A. and Niaki, S.T.A. (2010a) 'Economic production quantity model with scrapped items and limited production capacity', Scientia Iranica, Transaction E, Industrial Engineering, Vol. 17, pp.58-69.
-
(2010)
Scientia Iranica, Transaction E, Industrial Engineering
, vol.17
, pp. 58-69
-
-
Taleizadeh, A.A.1
Najafi, A.A.2
Niaki, S.T.A.3
-
23
-
-
70450240953
-
Multi-product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
-
Taleizadeh, A.A., Niaki, S.T.A. and Najafi, A.A. (2010b) 'Multi-product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint', Journal of Computational and Applied Mathematics, Vol. 233, pp.1834-1849.
-
(2010)
Journal of Computational and Applied Mathematics
, vol.233
, pp. 1834-1849
-
-
Taleizadeh, A.A.1
Niaki, S.T.A.2
Najafi, A.A.3
-
24
-
-
77955278534
-
Multi-product production quantity model with repair failure and partial backordering
-
Taleizadeh, A.A., Wee, H.M. and Sadjadi, S.J. (2010c) 'Multi-product production quantity model with repair failure and partial backordering', Computers & Industrial Engineering, Vol. 59, pp.45-54.
-
(2010)
Computers & Industrial Engineering
, vol.59
, pp. 45-54
-
-
Taleizadeh, A.A.1
Wee, H.M.2
Sadjadi, S.J.3
-
25
-
-
69349091956
-
Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return
-
Yoo, S.H., Kim, D.S. and Park, M.S. (2009) 'Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return', International Journal of Production Economics, Vol. 121, pp.255-265.
-
(2009)
International Journal of Production Economics
, vol.121
, pp. 255-265
-
-
Yoo, S.H.1
Kim, D.S.2
Park, M.S.3
|