메뉴 건너뛰기




Volumn 58, Issue 2, 2010, Pages 239-248

Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration

Author keywords

Hot consumption; Mathematical model; Scheduling; Tabu search; Transportation; Worst case analysis

Indexed keywords

COMPLETION TIME; COMPUTATIONAL RESULTS; HOT CONSUMPTION; IDLE TIME; IDLE TIME PENALTIES; PARALLEL CONVERTER; SCHEDULING PROBLEM; STEELMAKING OPERATION; TABU SEARCH ALGORITHMS; WAITING-TIME; WORST CASE; WORST-CASE ANALYSIS;

EID: 76349105056     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.07.014     Document Type: Article
Times cited : (54)

References (25)
  • 1
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • Allaoui H., and Artiba A. Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Computers and Industrial Engineering 47 (2004) 431-450
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 2
    • 3042795380 scopus 로고    scopus 로고
    • Complexity results for flow-shop and open-shop scheduling problems with transportation delays
    • Brucker P., Knust S., Cheng T.C.E., and Shakhlevich N.V. Complexity results for flow-shop and open-shop scheduling problems with transportation delays. Annals of Operations Research 129 (2004) 81-106
    • (2004) Annals of Operations Research , vol.129 , pp. 81-106
    • Brucker, P.1    Knust, S.2    Cheng, T.C.E.3    Shakhlevich, N.V.4
  • 4
    • 10044233768 scopus 로고    scopus 로고
    • A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
    • Che A., and Chu C.B. A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line. Operations Research Letters 33 (2005) 274-284
    • (2005) Operations Research Letters , vol.33 , pp. 274-284
    • Che, A.1    Chu, C.B.2
  • 5
    • 0030216821 scopus 로고    scopus 로고
    • Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
    • Chen Z.L. Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs. European Journal of Operational Research 93 (1996) 49-60
    • (1996) European Journal of Operational Research , vol.93 , pp. 49-60
    • Chen, Z.L.1
  • 7
    • 33745207776 scopus 로고    scopus 로고
    • A fast polynomial algorithm for 2-cyclic robotic scheduling
    • Chu C.B. A fast polynomial algorithm for 2-cyclic robotic scheduling. Journal of Scheduling 9 (2006) 453-468
    • (2006) Journal of Scheduling , vol.9 , pp. 453-468
    • Chu, C.B.1
  • 9
    • 0035885224 scopus 로고    scopus 로고
    • Makespan minimization for flow-shop problems with transportation times and a single robot
    • Hurink J., and Knust S. Makespan minimization for flow-shop problems with transportation times and a single robot. Discrete Applied Mathematics 112 (2001) 199-216
    • (2001) Discrete Applied Mathematics , vol.112 , pp. 199-216
    • Hurink, J.1    Knust, S.2
  • 10
    • 28544441283 scopus 로고    scopus 로고
    • A contract net based intelligent agent system for solving the reactive hoist scheduling problem
    • Jégou D., Kim D.W., Baptiste P., and Lee K.H. A contract net based intelligent agent system for solving the reactive hoist scheduling problem. Expert Systems with Applications 30 (2006) 156-167
    • (2006) Expert Systems with Applications , vol.30 , pp. 156-167
    • Jégou, D.1    Kim, D.W.2    Baptiste, P.3    Lee, K.H.4
  • 11
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee C.Y., and Chen Z.L. Machine scheduling with transportation considerations. Journal of Scheduling 4 (2001) 3-24
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 12
    • 33750012584 scopus 로고    scopus 로고
    • Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
    • Li K., Ganesan V.K., and Sivakumar A.I. Scheduling of single stage assembly with air transportation in a consumer electronic supply chain. Computers and Industrial Engineering 51 (2006) 264-278
    • (2006) Computers and Industrial Engineering , vol.51 , pp. 264-278
    • Li, K.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 14
    • 76349123052 scopus 로고    scopus 로고
    • A m-parallel crane problem with a non-crossing constraint
    • Lim A., Rodrigues B., and Xu Z. A m-parallel crane problem with a non-crossing constraint. Naval Research Logistics 54 (2007) 1-13
    • (2007) Naval Research Logistics , vol.54 , pp. 1-13
    • Lim, A.1    Rodrigues, B.2    Xu, Z.3
  • 15
    • 18744387412 scopus 로고    scopus 로고
    • An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem
    • Liu J.Y., and Jiang Y. An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem. Operations Research 53 (2005) 313-327
    • (2005) Operations Research , vol.53 , pp. 313-327
    • Liu, J.Y.1    Jiang, Y.2
  • 16
    • 0041587599 scopus 로고
    • On equivalent job-for-job block in 2 × n sequencing problem with transportation times
    • Maggu P.L., Das G., and Kumar R. On equivalent job-for-job block in 2 × n sequencing problem with transportation times. Journal of the Operations Research Society of Japan 24 (1981) 136-146
    • (1981) Journal of the Operations Research Society of Japan , vol.24 , pp. 136-146
    • Maggu, P.L.1    Das, G.2    Kumar, R.3
  • 18
    • 59349095559 scopus 로고    scopus 로고
    • Incorporating lateral transfers of vehicles and inventory into an integrated replenishment and routing plan for a there-echelon supply chain
    • 10.1016/j.cie.2007.09.004
    • Shen S.Y., and Honda M. Incorporating lateral transfers of vehicles and inventory into an integrated replenishment and routing plan for a there-echelon supply chain. Computers and Industrial Engineering (2007) 10.1016/j.cie.2007.09.004
    • (2007) Computers and Industrial Engineering
    • Shen, S.Y.1    Honda, M.2
  • 19
    • 28044455256 scopus 로고    scopus 로고
    • Minimizing makespan in a two-stage system with flowshop and open shop
    • Su L.H., Chou F.D., and Ting W.C. Minimizing makespan in a two-stage system with flowshop and open shop. Computers and Industrial Engineering 49 (2005) 520-536
    • (2005) Computers and Industrial Engineering , vol.49 , pp. 520-536
    • Su, L.H.1    Chou, F.D.2    Ting, W.C.3
  • 20
    • 0036489508 scopus 로고    scopus 로고
    • Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
    • Sung C.S., and Kim Y.H. Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed. Computer and Operations Research 29 (2002) 275-294
    • (2002) Computer and Operations Research , vol.29 , pp. 275-294
    • Sung, C.S.1    Kim, Y.H.2
  • 21
    • 0035341619 scopus 로고    scopus 로고
    • Scheduling in a two-machine flowshop with batch processing machine(s) for earliness under a common due date
    • Sung C.S., and Min J.I. Scheduling in a two-machine flowshop with batch processing machine(s) for earliness under a common due date. European Journal of Operational Research 131 (2001) 95-106
    • (2001) European Journal of Operational Research , vol.131 , pp. 95-106
    • Sung, C.S.1    Min, J.I.2
  • 22
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking-continuous casting production
    • Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. A mathematical programming model for scheduling steelmaking-continuous casting production. European Journal of Operational Research 120 (2000) 423-435
    • (2000) European Journal of Operational Research , vol.120 , pp. 423-435
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 25
    • 0037404554 scopus 로고    scopus 로고
    • Single hoist cyclic scheduling with multiple tanks: A material handling solution
    • Zhou Z.L., and Li L. Single hoist cyclic scheduling with multiple tanks: A material handling solution. Computers and Operations Research 30 (2003) 811-819
    • (2003) Computers and Operations Research , vol.30 , pp. 811-819
    • Zhou, Z.L.1    Li, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.