-
1
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
Agnetis, A., 2000. Scheduling no-wait robotic cells with two and three machines. European Journal of Operational Research, 123 (2), 303-314.
-
(2000)
European Journal of Operational Research
, vol.123
, Issue.2
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0034315580
-
Part sequencing in three machine no-wait robotic cells
-
Agnetis, A. and Pacciarelli, D., 2000. Part sequencing in three machine no-wait robotic cells. Operations Research Letters, 27 (4), 185-192.
-
(2000)
Operations Research Letters
, vol.27
, Issue.4
, pp. 185-192
-
-
Agnetis, A.1
Pacciarelli, D.2
-
3
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
Akcalt, E., Nemoto, K., and Uzsoy, R., 2001. Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 14 (1), 48-56.
-
(2001)
IEEE Transactions on Semiconductor Manufacturing
, vol.14
, Issue.1
, pp. 48-56
-
-
Akcalt, E.1
Nemoto, K.2
Uzsoy, R.3
-
4
-
-
0032791011
-
Scheduling of parts and robot activities in two-machine robotic cell
-
Aneja, Y.P. and Kamoun, H., 1999. Scheduling of parts and robot activities in two-machine robotic cell. Computers & Operations Research, 26 (4), 297-312.
-
(1999)
Computers & Operations Research
, vol.26
, Issue.4
, pp. 297-312
-
-
Aneja, Y.P.1
Kamoun, H.2
-
5
-
-
0013112614
-
-
Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France
-
Brauner, N. and Finke, G., (1997). Final results on the one-cycle conjecture in robotic cells. Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France.
-
(1997)
Final Results on the One-Cycle Conjecture in Robotic Cells.
-
-
Brauner, N.1
Finke, G.2
-
6
-
-
0002804434
-
On a conjecture in robotic cells: New simplified proof for the three-machine case
-
Brauner, N. and Finke, G., 1999. On a conjecture in robotic cells: new simplified proof for the three-machine case. INFOR, 37 (1), 20-36.
-
(1999)
INFOR
, vol.37
, Issue.1
, pp. 20-36
-
-
Brauner, N.1
Finke, G.2
-
7
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
Che, A., Chu, C., and Chu, F., 2002. Multicyclic hoist scheduling with constant processing times. IEEE Transactions on Robotics and Automation, 18 (1), 69-80.
-
(2002)
IEEE Transactions on Robotics and Automation
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
8
-
-
0037448766
-
A polynomial algorithm for 2-degree cyclic robot scheduling
-
Che, A., Chu, C., and Levner, E., 2003. A polynomial algorithm for 2-degree cyclic robot scheduling. European Journal of Operational Research, 145 (14), 31-44.
-
(2003)
European Journal of Operational Research
, vol.145
, Issue.14
, pp. 31-44
-
-
Che, A.1
Chu, C.2
Levner, E.3
-
9
-
-
0032000755
-
Cyclic scheduling with time window constraints
-
Chen, H., Chu, C., and Proth, J., 1998. Cyclic scheduling with time window constraints. IEEE Transactions on Robotics and Automation, 14 (1), 144-152.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, Issue.1
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.3
-
11
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Crama, Y. and van de Klundert, J., 1997. Cyclic scheduling of identical parts in a robotic cell. Operations Research, 45 (6), 952-965.
-
(1997)
Operations Research
, vol.45
, Issue.6
, pp. 952-965
-
-
Crama, Y.1
Van De Klundert, J.2
-
12
-
-
0002604088
-
Cyclic scheduling in 3-machine robotic flow shops
-
Crama, Y. and van de Klundert, J., 1999. Cyclic scheduling in 3-machine robotic flow shops. Journal of Scheduling, 2 (1), 35-54.
-
(1999)
Journal of Scheduling
, vol.2
, Issue.1
, pp. 35-54
-
-
Crama, Y.1
Van De Klundert, J.2
-
13
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
Dawande, M., et al., 2005. Sequencing and scheduling in robotic cells: recent developments. Journal of Scheduling, 8 (5), 387-426.
-
(2005)
Journal of Scheduling
, vol.8
, Issue.5
, pp. 387-426
-
-
Dawande, M.1
-
15
-
-
0036769403
-
On throughput maximization in constant travel-time robotic cells
-
Dawande, M., Sriskandarajah, C., and Sethi, S., 2002. On throughput maximization in constant travel-time robotic cells. Manufacturing and Service Operations Management, 4 (4), 296-312.
-
(2002)
Manufacturing and Service Operations Management
, vol.4
, Issue.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.3
-
16
-
-
3242715937
-
Increasing throughput for robotic cells with parallel machines and multiple robots
-
Geismar, H.N., Sriskandarajah, C., and Ramanan, N., 2004. Increasing throughput for robotic cells with parallel machines and multiple robots. IEEE Transactions on Automation Science & Engineering, 1 (1), 84-89.
-
(2004)
IEEE Transactions on Automation Science & Engineering
, vol.1
, Issue.1
, pp. 84-89
-
-
Geismar, H.N.1
Sriskandarajah, C.2
Ramanan, N.3
-
17
-
-
33748279816
-
The permutation flowshop problem with blocking. A tabu search approach
-
Grabowski, J. and Pempera, J., 2007. The permutation flowshop problem with blocking. A tabu search approach. Omega, 35 (3), 302-311.
-
(2007)
Omega
, vol.35
, Issue.3
, pp. 302-311
-
-
Grabowski, J.1
Pempera, J.2
-
18
-
-
0000410538
-
Scheduling of re-entrant flow shops
-
Graves, S.C., et al., 1983. Scheduling of re-entrant flow shops. Journal of Operations Management, 3 (4), 197-207.
-
(1983)
Journal of Operations Management
, vol.3
, Issue.4
, pp. 197-207
-
-
Graves, S.C.1
-
19
-
-
52049112175
-
Pure cycles in flexible robotic cells
-
Gultekin, H., Karasan, O.E. and Akturk, M.S., 2009. Pure cycles in flexible robotic cells. Computers & Operations Research, 36 (2), 329-343.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.2
, pp. 329-343
-
-
Gultekin, H.1
Karasan, O.E.2
Akturk, M.S.3
-
20
-
-
0012220631
-
Operations research techniques for robotic systems
-
S.Y. Nof, ed., Canada: John Wiley and Sons
-
Hall, N.G., 1999. Operations research techniques for robotic systems. In: S.Y. Nof, ed. Handbook of industrial robotics, second edition. Canada: John Wiley and Sons, 543-578.
-
(1999)
Handbook of Industrial Robotics, Second Edition
, pp. 543-578
-
-
Hall, N.G.1
-
21
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
Hall, N.G., Kamoun, H., and Sriskandarajah, C., 1997. Scheduling in robotic cells: classification, two and three machine cells. Operations Research, 45 (3), 421-439.
-
(1997)
Operations Research
, vol.45
, Issue.3
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
22
-
-
0002868454
-
Scheduling in robotic cells: Complexity and steady state analysis
-
Hall, N.G., Kamoun, H., and Sriskandarajah, C., 1998. Scheduling in robotic cells: complexity and steady state analysis. European Journal of Operational Research, 109 (1), 43-63.
-
(1998)
European Journal of Operational Research
, vol.109
, Issue.1
, pp. 43-63
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
23
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall, N.G. and Sriskandarajah, C., 1996. A survey of machine scheduling problems with blocking and no-wait in process. Operations Research, 44 (3), 510-525.
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
24
-
-
0029275394
-
Schedule efficiency in a robotic production cell
-
Ioachim, I. and Soumis, F., 1995. Schedule efficiency in a robotic production cell. International Journal of Flexible Manufacturing Systems, 7 (1), 5-26.
-
(1995)
International Journal of Flexible Manufacturing Systems
, vol.7
, Issue.1
, pp. 5-26
-
-
Ioachim, I.1
Soumis, F.2
-
25
-
-
0033312656
-
Scheduling in robotic cells: Heuristics and cell design
-
Kamoun, H., Hall, N.G., and Sriskandarajah, C., 1999. Scheduling in robotic cells: heuristics and cell design. Operations Research, 47 (6), 821-83.
-
(1999)
Operations Research
, vol.47
, Issue.6
, pp. 821-883
-
-
Kamoun, H.1
Hall, N.G.2
Sriskandarajah, C.3
-
26
-
-
0000757511
-
Cyclic scheduling in flow lines: Modelling, observations, effective heuristics and a cycle time minimization procedure
-
Karabati, S. and Kouvelis, P., 1996. Cyclic scheduling in flow lines: modelling, observations, effective heuristics and a cycle time minimization procedure. Naval Research Logistics, 43 (2), 211-231.
-
(1996)
Naval Research Logistics
, vol.43
, Issue.2
, pp. 211-231
-
-
Karabati, S.1
Kouvelis, P.2
-
27
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
Kats, V., Levner, E., and Meyzin, L., 1999. Multiple-part cyclic hoist scheduling using a sieve method. IEEE Transactions on Robotics and Automation, 15 (4), 704-713.
-
(1999)
IEEE Transactions on Robotics and Automation
, vol.15
, Issue.4
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Meyzin, L.3
-
28
-
-
0345757595
-
Cyclic scheduling in a robotic production line
-
Kats, V. and Levner, E., 2002. Cyclic scheduling in a robotic production line. Journal of Scheduling, 5 (1), 23-41.
-
(2002)
Journal of Scheduling
, vol.5
, Issue.1
, pp. 23-41
-
-
Kats, V.1
Levner, E.2
-
29
-
-
0033360348
-
Cyclic scheduling in synchronous production lines
-
Kouvelis, P. and Karabati, S., 1999. Cyclic scheduling in synchronous production lines. IIE Transactions, 31 (8), 709-719.
-
(1999)
IIE Transactions
, vol.31
, Issue.8
, pp. 709-719
-
-
Kouvelis, P.1
Karabati, S.2
-
30
-
-
11844251167
-
Minimizing cycle time in large robotic cells
-
Kumar, S., Ramanan, N., and Sriskandarajah, C., 2005. Minimizing cycle time in large robotic cells. IIE Transactions, 37 (2), 123-136.
-
(2005)
IIE Transactions
, vol.37
, Issue.2
, pp. 123-136
-
-
Kumar, S.1
Ramanan, N.2
Sriskandarajah, C.3
-
31
-
-
3242697916
-
Modelling and scheduling of ratio-driven FMS using unfolding time Petri nets
-
Lee, J. and Korbaa, O., 2004. Modelling and scheduling of ratio-driven FMS using unfolding time Petri nets. Computers & Industrial Engineering, 46 (4), 639-653.
-
(2004)
Computers & Industrial Engineering
, vol.46
, Issue.4
, pp. 639-653
-
-
Lee, J.1
Korbaa, O.2
-
32
-
-
0030691565
-
Performance measures and schedules in periodic jobshops
-
Lee, T.E. and Posner, M.E., 1997. Performance measures and schedules in periodic jobshops. Operations Research, 45 (1), 72-91.
-
(1997)
Operations Research
, vol.45
, Issue.1
, pp. 72-91
-
-
Lee, T.E.1
Posner, M.E.2
-
33
-
-
0035333368
-
Optimal Cyclic Scheduling of a robotic processing line with two-product and time-window constraints
-
Lei, L. and Liu, Q., 2001. Optimal Cyclic Scheduling of a robotic processing line with two-product and time-window constraints. INFOR, 39 (2), 185-199.
-
(2001)
INFOR
, vol.39
, Issue.2
, pp. 185-199
-
-
Lei, L.1
Liu, Q.2
-
34
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
Lei, L. and Wang, T.J., 1994. Determining optimal cyclic hoist schedules in a single-hoist electroplating line. IIE Transactions, 26 (2), 25-33.
-
(1994)
IIE Transactions
, vol.26
, Issue.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.J.2
-
35
-
-
12344318544
-
Optimal cyclic multi-hoist scheduling: A mixed integer programming approach
-
Leung, J.M.Y., et al., 2004. Optimal cyclic multi-hoist scheduling: a mixed integer programming approach. Operations Research, 52 (6), 965-976.
-
(2004)
Operations Research
, vol.52
, Issue.6
, pp. 965-976
-
-
Leung, J.M.Y.1
-
36
-
-
0031095268
-
An improved algorithm for cyclic flowshop scheduling in a robotic cell
-
Levner, E., Kats, V., and Levit, V., 1997. An improved algorithm for cyclic flowshop scheduling in a robotic cell. European Journal of Operational Research, 97 (3), 500-508.
-
(1997)
European Journal of Operational Research
, vol.97
, Issue.3
, pp. 500-508
-
-
Levner, E.1
Kats, V.2
Levit, V.3
-
37
-
-
0036778727
-
Cyclic scheduling of a single hoist in extended electroplating lines: A comprehensive integer programming solution
-
Liu, J., Jiang, J., and Zhou, Z., 2002. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution. IIE Transactions, 34 (10), 905-914.
-
(2002)
IIE Transactions
, vol.34
, Issue.10
, pp. 905-914
-
-
Liu, J.1
Jiang, J.2
Zhou, Z.3
-
38
-
-
0020699921
-
A heuristic algorithm for the m-Machine, n-Job flow-shop sequencing problem
-
Nawaz, M., Enscore, E.E., and Ham, I., 1983. A heuristic algorithm for the m-Machine, n-Job flow-shop sequencing problem. OMEGA, 11 (1), 91-95.
-
(1983)
OMEGA
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
-
39
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
Perkinson, T., Gyurcsik, R., and McLarty, P., 1996. Single-wafer cluster tool performance: an analysis of the effects of redundant chambers and revisitation sequences on throughput. IEEE Transactions on Semiconductor Manufacturing, 9 (3), 384-400.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.3
, pp. 384-400
-
-
Perkinson, T.1
Gyurcsik, R.2
McLarty, P.3
-
40
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
Perkinson, T., et al., 1994. Single-wafer cluster tool performance: an analysis of throughput. IEEE Transactions on Semiconductor Manufacturing, 7 (3), 369-373.
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.1
-
41
-
-
0242578576
-
A note on constructive heuristics for the flowshop problem with blocking
-
Ronconi, D.P., 2004. A note on constructive heuristics for the flowshop problem with blocking. International journal of Production Economics, 87 (1), 39-48.
-
(2004)
International Journal of Production Economics
, vol.87
, Issue.1
, pp. 39-48
-
-
Ronconi, D.P.1
-
43
-
-
0032042832
-
Petri net modeling and scheduling for cyclic job shops with blocking
-
Song, J.S. and Lee, T.E., 1998. Petri net modeling and scheduling for cyclic job shops with blocking. Computers and Industrial Engineering, 34 (2), 281-295.
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.2
, pp. 281-295
-
-
Song, J.S.1
Lee, T.E.2
-
44
-
-
84877343203
-
An algorithm for scheduling a chemical processing tank line
-
Song, W., Zabinsky, Z.B., and Storch, R.L., 1993. An algorithm for scheduling a chemical processing tank line. Production Planning and Control, 4 (4), 323-332.
-
(1993)
Production Planning and Control
, vol.4
, Issue.4
, pp. 323-332
-
-
Song, W.1
Zabinsky, Z.B.2
Storch, R.L.3
-
45
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Venkatesh, S., et al., 1997. A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots. IEEE Transactions on Semiconductor Manufacturing, 10 (4), 418-424.
-
(1997)
IEEE Transactions on Semiconductor Manufacturing
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
-
46
-
-
0030212052
-
Simple Performance models for integrated processing tools
-
Wood, S., 1996. Simple Performance models for integrated processing tools. IEEE Transactions on Semiconductor Manufacturing, 9 (3), 320-328.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.3
, pp. 320-328
-
-
Wood, S.1
-
47
-
-
77956689709
-
A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
-
Yan, P., et al., 2010. A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows. International Journal of Production Research, 48 (21), 6461-6480.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.21
, pp. 6461-6480
-
-
Yan, P.1
-
48
-
-
78649470416
-
Bicriteria robotic cell scheduling with controllable processing times
-
Yildiz, S., Akturk, M.S., and Karasan, O.E., 2011. Bicriteria robotic cell scheduling with controllable processing times. International Journal of Production Research, 49 (2), 569-583.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.2
, pp. 569-583
-
-
Yildiz, S.1
Akturk, M.S.2
Karasan, O.E.3
|