Bicriteria robotic cell scheduling with controllable processing times

Author keywords

bicriteria optimisation; CNC; controllable processing times; robotic cell; scheduling

Indexed keywords

BI-CRITERIA; BICRITERIA SCHEDULING PROBLEM; CNC; CNC MACHINE; CONTROLLABLE PROCESSING TIME; CYCLE TIME; MACHINING CONDITIONS; MANUFACTURING COST; NONDOMINATED SOLUTIONS; ON-MACHINES; OPERATIONAL FLEXIBILITY; OPTIMISATIONS; PROCESS FLEXIBILITY; PROCESSING TIME; ROBOTIC CELL; ROBOTIC-CELL SCHEDULING; WORST-CASE PERFORMANCE;

EID: 78649470416     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903491799     Document Type: Article
Times cited : (26)

References (16)
  • 1
    • 49749086485 scopus 로고    scopus 로고
    • Identical part production in cyclic robotic cells: Concepts, overview and open questions
    • Brauner, N., 2008. Identical part production in cyclic robotic cells: concepts, overview and open questions. Discrete Applied Mathematics, 156(13), 2480-2492.
    • (2008) Discrete Applied Mathematics , vol.156 , Issue.13 , pp. 2480-2492
    • Brauner, N.1
  • 2
    • 0032222091 scopus 로고    scopus 로고
    • Bicriterion single machine scheduling with resource dependent processing times
    • Cheng, T. C. E., Janiak, A., and Kovalyov, M. Y., 1998. Bicriterion single machine scheduling with resource dependent processing times. SIAM Journal on Optimization, 8(2), 617-630.
    • (1998) SIAM Journal on Optimization , vol.8 , Issue.2 , pp. 617-630
    • Cheng, T.C.E.1    Janiak, A.2    Kovalyov, M.Y.3
  • 3
    • 0034367676 scopus 로고    scopus 로고
    • Cyclic scheduling in robotic flowshops
    • Crama, Y., et al., 2000. Cyclic scheduling in robotic flowshops. Annals of Operations Research, 96 (1-4), 97-124.
    • (2000) Annals of Operations Research , vol.96 , Issue.1-4 , pp. 97-124
    • Crama, Y.1
  • 4
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • Dawande, M., et al., 2005. Sequencing and scheduling in robotic cells: recent developments. Journal of Scheduling, 8(5), 387-426.
    • (2005) Journal of Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Dawande, M.1
  • 5
    • 30844461467 scopus 로고    scopus 로고
    • Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots
    • Galante, G. and Passannanti, G., 2006. Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots. International Journal of Production Research, 44(4), 639-652.
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 639-652
    • Galante, G.1    Passannanti, G.2
  • 8
    • 33750493583 scopus 로고    scopus 로고
    • Considering manufacturing cost and scheduling performance on a CNC turning machine
    • Gurel, S. and Akturk, M. S., 2007. Considering manufacturing cost and scheduling performance on a CNC turning machine. European Journal of Operational Research, 177(1), 325-343.
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 325-343
    • Gurel, S.1    Akturk, M.S.2
  • 10
    • 13544276185 scopus 로고    scopus 로고
    • A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
    • Kayan, R. K. and Akturk, M. S., 2005. A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. European Journal of Operational Research, 167(3), 624-643.
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 624-643
    • Kayan, R.K.1    Akturk, M.S.2
  • 11
    • 0035637004 scopus 로고    scopus 로고
    • Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases
    • Lee, C.-Y. and Lei, L., 2001. Multiple-project scheduling with controllable project duration and hard resource constraint: some solvable cases. Annals of Operations Research, 102 (1-4), 287-307.
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 287-307
    • Lee, C.-Y.1    Lei, L.2
  • 13
    • 33746868325 scopus 로고    scopus 로고
    • Single machine scheduling with controllable release and processing parameters
    • Shakhlevich, N. V. and Strusevich, V. A., 2006. Single machine scheduling with controllable release and processing parameters. Discrete Applied Mathematics, 154(15), 2178-2199.
    • (2006) Discrete Applied Mathematics , vol.154 , Issue.15 , pp. 2178-2199
    • Shakhlevich, N.V.1    Strusevich, V.A.2
  • 14
    • 34547404222 scopus 로고    scopus 로고
    • A survey of scheduling with controllable processing times
    • Shabtay, D. and Steiner, G., 2007. A survey of scheduling with controllable processing times. Discrete Applied Mathematics, 155, 1643-1666.
    • (2007) Discrete Applied Mathematics , vol.155 , pp. 1643-1666
    • Shabtay, D.1    Steiner, G.2
  • 15
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
    • Vickson, R. G., 1980. Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine. Operations Research, 28(5), 1155-1167.
    • (1980) Operations Research , vol.28 , Issue.5 , pp. 1155-1167
    • Vickson, R.G.1
  • 16
    • 35548954656 scopus 로고    scopus 로고
    • A bicriteria approach to minimise maximal lateness and resource consumption for scheduling a single machine
    • Yedidsion, L., Shabtay, D., and Kaspi, M., 2007. A bicriteria approach to minimise maximal lateness and resource consumption for scheduling a single machine. Journal of Scheduling, 10(6), 341-352.
    • (2007) Journal of Scheduling , vol.10 , Issue.6 , pp. 341-352
    • Yedidsion, L.1    Shabtay, D.2    Kaspi, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.