메뉴 건너뛰기




Volumn 65, Issue 1, 2013, Pages 128-136

Inventory write-down prediction for semiconductor manufacturing considering inventory age, accounting principle, and product structure with real settings

Author keywords

Accounting principle; Bill of material; Inventory age; Inventory write down; Semiconductor manufacturing; Supply chain management

Indexed keywords

COMMERCE; COST BENEFIT ANALYSIS; COSTS; FLASH MEMORY; FORECASTING; MANUFACTURE; POLYNOMIAL APPROXIMATION; SENSITIVITY ANALYSIS; SUPPLY CHAIN MANAGEMENT;

EID: 84879687952     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2011.11.020     Document Type: Article
Times cited : (20)

References (36)
  • 2
    • 67549098336 scopus 로고    scopus 로고
    • Supply chain strategies for perishable products: The case of fresh produce
    • Blackburn, J., & Scudder, G. (2009). Supply chain strategies for perishable products: The case of fresh produce. Production & Operations Management, 18(2), 129-137.
    • (2009) Production & Operations Management , vol.18 , Issue.2 , pp. 129-137
    • Blackburn, J.1    Scudder, G.2
  • 7
    • 40249114802 scopus 로고    scopus 로고
    • Made in taiwan: Shifting paradigms in high-Tech industries
    • Chien, C.-F. (2007). Made in Taiwan: Shifting paradigms in high-Tech industries. Industrial Engineer: IE, 39(2), 47-49.
    • (2007) Industrial Engineer: IE , vol.39 , Issue.2 , pp. 47-49
    • Chien, C.-F.1
  • 8
    • 84879694079 scopus 로고    scopus 로고
    • Manufacturing intelligence and unison analysis for modeling non-volatile memory products demand forecast problem in semiconductor manufacturing
    • Chien, C.-F. & Chen, Y.-J. (2011). Manufacturing intelligence and UNISON analysis for modeling non-volatile memory products demand forecast problem in semiconductor manufacturing. In Proceedings of international conference on IML2011 (pp. 1-7).
    • (2011) Proceedings of International Conference on IML2011 , pp. 1-7
    • Chien, C.-F.1    Chen, Y.-J.2
  • 9
    • 78049265768 scopus 로고    scopus 로고
    • Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle
    • Chien, C.-F., Chen, Y.-J., & Peng, J.-T. (2010a). Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle. International Journal of Production Economics, 128(2), 496-509.
    • (2010) International Journal of Production Economics , vol.128 , Issue.2 , pp. 496-509
    • Chien, C.-F.1    Chen, Y.-J.2    Peng, J.-T.3
  • 10
    • 33847023612 scopus 로고    scopus 로고
    • Constructing the oge for promoting tool group productivity in semiconductor manufacturing
    • Chien, C.-F., Chen, H.-K., Wu, J.-Z., & Hu, C.-H. (2007). Constructing the OGE for promoting tool group productivity in semiconductor manufacturing. International Journal of Production Research, 45(3), 509-524.
    • (2007) International Journal of Production Research , vol.45 , Issue.3 , pp. 509-524
    • Chien, C.-F.1    Chen, H.-K.2    Wu, J.-Z.3    Hu, C.-H.4
  • 11
  • 12
    • 79958823122 scopus 로고    scopus 로고
    • Unison analysis to model and reduce step-And-scan overlay errors for semiconductor manufacturing
    • Chien, C.-F., & Hsu, C. (2011). UNISON analysis to model and reduce step-And-scan overlay errors for semiconductor manufacturing. Journal of Intelligent Manufacturing, 22(3), 399-412.
    • (2011) Journal of Intelligent Manufacturing , vol.22 , Issue.3 , pp. 399-412
    • Chien, C.-F.1    Hsu, C.2
  • 13
    • 79952616762 scopus 로고    scopus 로고
    • Modeling order assignment for semiconductor assembly hierarchical outsourcing and its decision support system
    • Chien, C.-F., Wu, J.-Z., & Weng, Y.-D. (2010b). Modeling order assignment for semiconductor assembly hierarchical outsourcing and its decision support system. Flexible Services and Manufacturing Journal, 22(1-2), 109-139.
    • (2010) Flexible Services and Manufacturing Journal , vol.22 , Issue.1-2 , pp. 109-139
    • Chien, C.-F.1    Wu, J.-Z.2    Weng, Y.-D.3
  • 14
    • 84879013885 scopus 로고    scopus 로고
    • A two-stage stochastic programming approach for new tape-out allocation decisions for demand fulfillment planning in semiconductor manufacturing
    • doi:10.1007/s10696-011-9109-0
    • Chien, C.-F., Wu, J.-Z., & Wu, C.-C. (2011). A two-stage stochastic programming approach for new tape-out allocation decisions for demand fulfillment planning in semiconductor manufacturing. Flexible Services and Manufacturing Journal. doi:10.1007/s10696-011-9109-0.
    • (2011) Flexible Services and Manufacturing Journal.
    • Chien, C.-F.1    Wu, J.-Z.2    Wu, C.-C.3
  • 15
    • 84870930472 scopus 로고    scopus 로고
    • Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing
    • doi:10.1007/s10845-011-0561-1
    • Chien, C.-F., & Zheng, J. (2011). Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing. Journal of Intelligent Manufacturing. doi:10.1007/s10845-011-0561-1.
    • (2011) Journal of Intelligent Manufacturing.
    • Chien, C.-F.1    Zheng, J.2
  • 16
    • 0000879068 scopus 로고
    • Optimal policies for a multi-echelon inventory problem
    • Clark, A. J., & Scarf, H. (1960). Optimal policies for a multi-echelon inventory problem. Management Science, 6(4), 475-490.
    • (1960) Management Science , vol.6 , Issue.4 , pp. 475-490
    • Clark, A.J.1    Scarf, H.2
  • 17
    • 0024480893 scopus 로고
    • Near-optimal service constrained stocking policies for spare parts
    • Cohen, M. A., Kleindorfer, P. R., & Lee, H. L. (1989). Near-optimal service constrained stocking policies for spare parts. Operations Research, 37(1), 104-117.
    • (1989) Operations Research , vol.37 , Issue.1 , pp. 104-117
    • Cohen, M.A.1    Kleindorfer, P.R.2    Lee, H.L.3
  • 18
    • 77952125031 scopus 로고    scopus 로고
    • Managing perishables with substitution: Inventory issuance and replenishment heuristics
    • Deniz, B., Karaesmen, I., & Scheller-Wolf, A. (2010). Managing perishables with substitution: Inventory issuance and replenishment heuristics. Manufacturing & Service Operations Management, 12(2), 319-329.
    • (2010) Manufacturing & Service Operations Management , vol.12 , Issue.2 , pp. 319-329
    • Deniz, B.1    Karaesmen, I.2    Scheller-Wolf, A.3
  • 19
    • 33749382720 scopus 로고    scopus 로고
    • Ibm solves a mixed-integer program to optimize its semiconductor supply chain
    • Denton, B. T., Forrest, J., & Milne, R. J. (2006). IBM solves a mixed-integer program to optimize its semiconductor supply chain. Interfaces, 36(5), 386-399.
    • (2006) Interfaces , vol.36 , Issue.5 , pp. 386-399
    • Denton, B.T.1    Forrest, J.2    Milne, R.J.3
  • 20
    • 38849189445 scopus 로고    scopus 로고
    • Optimal control of an inventory with simultaneous obsolescence
    • Emsermann, M., & Simon, B. (2007). Optimal control of an inventory with simultaneous obsolescence. Interfaces, 37(5), 445.
    • (2007) Interfaces , vol.37 , Issue.5 , pp. 445
    • Emsermann, M.1    Simon, B.2
  • 22
    • 77957074539 scopus 로고
    • Logistics of production and inventory
    • In A. H. G. R. K. S. C. Graves & P. H. Zipkin (Eds.). Amsterdam: Elsevier
    • Graves, S. C., & Rinnooy Kan, A. H. G. (1993). Logistics of production and inventory. In A. H. G. R. K. S. C. Graves & P. H. Zipkin (Eds.). Logistics of production and inventory (Vol. 4, pp. v-vii). Amsterdam: Elsevier.
    • (1993) Logistics of Production and Inventory , vol.4
    • Graves, S.C.1    Rinnooy Kan, A.H.G.2
  • 24
    • 78049473177 scopus 로고    scopus 로고
    • International Financial Reporting Standards (IFRS) No 2. IFRS Foundation Trustees, IFRS Interpretations Committee
    • International Financial Reporting Standards (IFRS) No. 2. (2010). Inventories. IFRS Foundation Trustees, IFRS Interpretations Committee.
    • (2010) Inventories
  • 25
    • 78651071873 scopus 로고    scopus 로고
    • Manufacturing intelligence to exploit the value of production and tool data to reduce cycle time
    • Kuo, C.-J., Chien, C.-F., & Chen, J.-D. (2011). Manufacturing intelligence to exploit the value of production and tool data to reduce cycle time. IEEE Transactions on Automation Science and Engineering, 8(1), 103-111.
    • (2011) IEEE Transactions on Automation Science and Engineering , vol.8 , Issue.1 , pp. 103-111
    • Kuo, C.-J.1    Chien, C.-F.2    Chen, J.-D.3
  • 28
    • 56349152806 scopus 로고    scopus 로고
    • Production planning for a deteriorating item with stochastic demand and consumer choice
    • Lodree, E. J., Jr., & Uzochukwu, B. M. (2008). Production planning for a deteriorating item with stochastic demand and consumer choice. International Journal of Production Economics, 116(2), 219-232.
    • (2008) International Journal of Production Economics , vol.116 , Issue.2 , pp. 219-232
    • Lodree Jr., E.J.1    Uzochukwu, B.M.2
  • 29
    • 0025720325 scopus 로고
    • Survey of literature on continuously deteriorating inventory models
    • Raafat, F. (1991). Survey of literature on continuously deteriorating inventory models. Journal of the Operational Research Society, 42(1), 27-37.
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.1 , pp. 27-37
    • Raafat, F.1
  • 30
    • 0037213090 scopus 로고    scopus 로고
    • Assessing the effects of operational processes and information systems on inventory performance
    • Rabinovich, E., Dresner, M. E., & Evers, P. T. (2003). Assessing the effects of operational processes and information systems on inventory performance. Journal of Operations Management, 21(1), 63-80.
    • (2003) Journal of Operations Management , vol.21 , Issue.1 , pp. 63-80
    • Rabinovich, E.1    Dresner, M.E.2    Evers, P.T.3
  • 31
    • 0004084146 scopus 로고    scopus 로고
    • Semiconductor Industry Association (SIA). San Jose CA
    • Semiconductor Industry Association (SIA) (2011). Press Releases. San Jose, CA. .
    • (2011) Press Releases
  • 33
    • 0001633076 scopus 로고    scopus 로고
    • Managing inventory with the prospect of obsolescence
    • Song, J.-S., & Zipkin, P. H. (1996). Managing inventory with the prospect of obsolescence. Operations Research, 44(1), 215-222.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 215-222
    • Song, J.-S.1    Zipkin, P.H.2
  • 34
    • 43449116079 scopus 로고    scopus 로고
    • Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings
    • Wu, J.-Z., & Chien, C.-F. (2008a). Modeling strategic semiconductor assembly outsourcing decisions based on empirical settings. OR Spectrum, 30(3), 401-430.
    • (2008) OR Spectrum , vol.30 , Issue.3 , pp. 401-430
    • Wu, J.-Z.1    Chien, C.-F.2
  • 35
    • 44949261129 scopus 로고    scopus 로고
    • Modeling semiconductor testing job scheduling and dynamic testing machine configuration
    • Wu, J.-Z., & Chien, C.-F. (2008b). Modeling semiconductor testing job scheduling and dynamic testing machine configuration. Expert Systems with Applications, 35(1/2), 485-496.
    • (2008) Expert Systems with Applications , vol.35 , Issue.1-2 , pp. 485-496
    • Wu, J.-Z.1    Chien, C.-F.2
  • 36
    • 33646080103 scopus 로고    scopus 로고
    • A flow-network approach for equilibrium of material requirements planning
    • Yenisey, M. M. (2006). A flow-network approach for equilibrium of material requirements planning. International Journal of Production Economics, 102(2), 317-332.
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 317-332
    • Yenisey, M.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.