|
Volumn 29, Issue 7, 2011, Pages 797-807
|
Study on safety control for Wuhan metro construction in complex environments
|
Author keywords
Complex engineering environments; Construction scheme; Impact analysis; Metro station; Numerical simulation; Safety control
|
Indexed keywords
COMPUTER SIMULATION;
EXCAVATION;
FINITE ELEMENT METHOD;
FOUNDATIONS;
GEOTECHNICAL ENGINEERING;
LIGHT RAIL TRANSIT;
NUMERICAL MODELS;
PILES;
SUBWAY STATIONS;
SUBWAYS;
COMPLEX ENGINEERING;
CONSTRUCTION SCHEME;
IMPACT ANALYSIS;
METRO STATIONS;
SAFETY CONTROLS;
SAFETY ENGINEERING;
BRIDGE;
CONSTRUCTION;
DEWATERING;
DIAPHRAGM WALL;
EXCAVATION;
FINITE DIFFERENCE METHOD;
FOUNDATION;
GEOTECHNICAL ENGINEERING;
LIGHT RAIL SYSTEM;
METRO SYSTEM;
NUMERICAL MODEL;
PILE;
SAFETY;
CHINA;
HUBEI;
WUHAN;
|
EID: 80051922042
PISSN: 02637863
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ijproman.2011.04.006 Document Type: Article |
Times cited : (43)
|
References (12)
|