A GRASP approach to transporter scheduling for ship assembly block operations management

Author keywords

GRASP; Greedy randomised adaptive search procedure; Heuristics; Parallel machine scheduling; Shipbuilding; Simulation

Indexed keywords

COMPUTATIONAL COMPLEXITY; MACHINERY; OPTIMIZATION; SCHEDULING ALGORITHMS; SHIPBUILDING; SHIPS;

EID: 84878484414     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2013.054133     Document Type: Article
Times cited : (11)

References (38)
  • 1
    • 33745192598 scopus 로고    scopus 로고
    • On a parallel machine scheduling problem with precedence constraints
    • Aho, I. and Makinen, E. (2006) 'On a parallel machine scheduling problem with precedence constraints', Journal of Scheduling, Vol. 9, No. 5, pp.493-495.
    • (2006) Journal of Scheduling , vol.9 , Issue.5 , pp. 493-495
    • Aho, I.1    Makinen, E.2
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., Gupta, J.N.D. and Aldowaisan, T. (1999) 'A review of scheduling research involving setup considerations', Omega, Vol. 27, No. 2, pp.219-239.
    • (1999) Omega , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 4
    • 34249066737 scopus 로고    scopus 로고
    • Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach
    • Armentano, V.A. and de Franca Filho, M.F. (2007) 'Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach', European Journal of Operational Research, Vol. 183, No. 1, pp.100-114.
    • (2007) European Journal of Operational Research , vol.183 , Issue.1 , pp. 100-114
    • Armentano, V.A.1    De Franca Filho, M.F.2
  • 5
    • 0141957114 scopus 로고    scopus 로고
    • An experimental study of algorithms for weighted completion time scheduling
    • Baev, I.D., Meleis, W.M. and Eichenberger, A. (2002) 'An experimental study of algorithms for weighted completion time scheduling', Algorithmica, Vol. 33, No. 1, pp.34-51.
    • (2002) Algorithmica , vol.33 , Issue.1 , pp. 34-51
    • Baev, I.D.1    Meleis, W.M.2    Eichenberger, A.3
  • 6
    • 65649113961 scopus 로고    scopus 로고
    • Restricted job completion time variance minimization on identical parallel machines
    • Chen, Y., Li, X. and Sawhney, R. (2009) 'Restricted job completion time variance minimization on identical parallel machines', European Journal of Industrial Engineering, Vol. 3, No. 3, pp.261-276.
    • (2009) European Journal of Industrial Engineering , vol.3 , Issue.3 , pp. 261-276
    • Chen, Y.1    Li, X.2    Sawhney, R.3
  • 7
    • 0025474221 scopus 로고
    • A state-of-art review of parallel machine scheduling research
    • Cheng, T.C.E. and Sin, C.C.S. (1990) 'A state-of-art review of parallel machine scheduling research', European Journal of Operational Research, Vol. 47, No. 3, pp.271-292.
    • (1990) European Journal of Operational Research , vol.47 , Issue.3 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 8
    • 0000869985 scopus 로고    scopus 로고
    • Approximation algorithms for precedence constrained scheduling problems on parallel machines that run at different speeds
    • Chudak, F.A. and Shmoys, D.B. (1999) 'Approximation algorithms for precedence constrained scheduling problems on parallel machines that run at different speeds', Journal of Algorithms, Vol. 30, No. 2, pp.323-343.
    • (1999) Journal of Algorithms , vol.30 , Issue.2 , pp. 323-343
    • Chudak, F.A.1    Shmoys, D.B.2
  • 9
    • 0036507578 scopus 로고    scopus 로고
    • Optimal idle time insertion in early-tardy parallel machines scheduling with precedence constraints
    • Croce, F.D. and Trubian, M. (2002) 'Optimal idle time insertion in early-tardy parallel machines scheduling with precedence constraints', Production Planning & Control, Vol. 13, No. 2, pp.133-142.
    • (2002) Production Planning & Control , vol.13 , Issue.2 , pp. 133-142
    • Croce, F.D.1    Trubian, M.2
  • 10
    • 0032678513 scopus 로고    scopus 로고
    • Scheduling preemptive jobs with precedence constraints on parallel machines
    • Djellab, K. (1999) 'Scheduling preemptive jobs with precedence constraints on parallel machines', European Journal of Operational Research, Vol. 117, No. 2, pp.355-367.
    • (1999) European Journal of Operational Research , vol.117 , Issue.2 , pp. 355-367
    • Djellab, K.1
  • 11
    • 79958031546 scopus 로고    scopus 로고
    • Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
    • doi:10.10.16/cie.2010.07.001
    • Driessel, R. and Monch, L. (2011) 'Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times', Computers & Industrial Engineering, Vol. 61, No. 2, pp.336-345, doi:10.10.16/cie.2010.07. 001.
    • (2011) Computers & Industrial Engineering , vol.61 , Issue.2 , pp. 336-345
    • Driessel, R.1    Monch, L.2
  • 12
    • 77953870243 scopus 로고    scopus 로고
    • Iterated greedy local search methods for unrelated parallel machine scheduling
    • Fanjul-Peyro, L. and Ruiz, R. (2010) 'Iterated greedy local search methods for unrelated parallel machine scheduling', European Journal of Operational Research, Vol. 207, No. 1, pp.55-69.
    • (2010) European Journal of Operational Research , vol.207 , Issue.1 , pp. 55-69
    • Fanjul-Peyro, L.1    Ruiz, R.2
  • 13
    • 0000049494 scopus 로고
    • Greedy randomized adaptive search procedures
    • Feo, T.A. and Resende, M.G.C. (1995) 'Greedy randomized adaptive search procedures', Journal of Global Optimization, Vol. 6, No. 2, pp.109-133.
    • (1995) Journal of Global Optimization , vol.6 , Issue.2 , pp. 109-133
    • Feo, T.A.1    Resende, M.G.C.2
  • 14
    • 77955274108 scopus 로고    scopus 로고
    • Parallel machine scheduling with precedence constraints and setup times
    • Gacias, B., Artigues, C. and Lopez, P. (2010) 'Parallel machine scheduling with precedence constraints and setup times', Computers & Operations Research, Vol. 37, No. 12, pp.2141-2151.
    • (2010) Computers & Operations Research , vol.37 , Issue.12 , pp. 2141-2151
    • Gacias, B.1    Artigues, C.2    Lopez, P.3
  • 15
    • 28244470744 scopus 로고    scopus 로고
    • Metaheuristics in combinatorial optimization
    • Gendreau, M. and Potvin, J.Y. (2005) 'Metaheuristics in combinatorial optimization', Annals of Operations Research, Vol. 140, No. 1, pp.189-213.
    • (2005) Annals of Operations Research , vol.140 , Issue.1 , pp. 189-213
    • Gendreau, M.1    Potvin, J.Y.2
  • 17
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham, R.L., Lawler, E.L., Lenstra, J.K. and Rinnooy Kan, A.H.G. (1979) 'Optimization and approximation in deterministic sequencing and scheduling: a survey', Annals of Discrete Mathematics, Vol. 5, No. 1, pp.287-326.
    • (1979) Annals of Discrete Mathematics , vol.5 , Issue.1 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 18
    • 0031275738 scopus 로고    scopus 로고
    • Heuristics for unrelated machine scheduling with precedence constraints
    • Herrmann, J., Proth, J.M. and Sauer, N. (1997) 'Heuristics for unrelated machine scheduling with precedence constraints', European Journal of Operational Research, Vol. 102, No. 3, pp.528-537.
    • (1997) European Journal of Operational Research , vol.102 , Issue.3 , pp. 528-537
    • Herrmann, J.1    Proth, J.M.2    Sauer, N.3
  • 19
    • 59049107225 scopus 로고    scopus 로고
    • Minimizing the normalized sum of square for workload deviations on m parallel processors
    • Ho, J.C., Tseng, T.L., Ruiz-Torres, A.J. and Lopez, F.J. (2009) 'Minimizing the normalized sum of square for workload deviations on m parallel processors', Computers & Industrial Engineering, Vol. 56, No. 1, pp.186-192.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 186-192
    • Ho, J.C.1    Tseng, T.L.2    Ruiz-Torres, A.J.3    Lopez, F.J.4
  • 20
    • 2942627919 scopus 로고    scopus 로고
    • The scheduling problem of PCBs for multiple non-identical parallel machines
    • Hop, N.V. and Nagarur, N.N. (2004) 'The scheduling problem of PCBs for multiple non-identical parallel machines', European Journal of Operational Research, Vol. 158, No. 3, pp.577-594.
    • (2004) European Journal of Operational Research , vol.158 , Issue.3 , pp. 577-594
    • Hop, N.V.1    Nagarur, N.N.2
  • 21
    • 74549151667 scopus 로고    scopus 로고
    • Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions
    • Hu, X., Bao, J.S. and Jin, Y. (2010) 'Minimising makespan on parallel machines with precedence constraints and machine eligibility restrictions', International Journal of Production Research, Vol. 48, No. 6, pp.1639-1651.
    • (2010) International Journal of Production Research , vol.48 , Issue.6 , pp. 1639-1651
    • Hu, X.1    Bao, J.S.2    Jin, Y.3
  • 22
    • 0035681031 scopus 로고    scopus 로고
    • List scheduling in a parallel machine environment with precedence constraints and setup times
    • Hurink, J. and Knust, S. (2001) 'List scheduling in a parallel machine environment with precedence constraints and setup times', Operations Research Letters, Vol. 29, No. 5, pp.231-239.
    • (2001) Operations Research Letters , vol.29 , Issue.5 , pp. 231-239
    • Hurink, J.1    Knust, S.2
  • 23
    • 53749099771 scopus 로고    scopus 로고
    • Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints
    • Kim, E.S., Sung, C.S. and Lee, I.S. (2009) 'Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints', Computers & Operations Research, Vol. 36, No. 3, pp.698-710.
    • (2009) Computers & Operations Research , vol.36 , Issue.3 , pp. 698-710
    • Kim, E.S.1    Sung, C.S.2    Lee, I.S.3
  • 24
    • 0035917224 scopus 로고    scopus 로고
    • Comparing the effectiveness of workload balancing objectives in FMS loading
    • Kumar, N. and Shanker, K. (2001) 'Comparing the effectiveness of workload balancing objectives in FMS loading', International Journal of Production Research, Vol. 39, No. 5, pp.843-871.
    • (2001) International Journal of Production Research , vol.39 , Issue.5 , pp. 843-871
    • Kumar, N.1    Shanker, K.2
  • 25
    • 78149280439 scopus 로고    scopus 로고
    • Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
    • Lin, S.W., Lee, Z.J., Ying, K.C. and Lu, C.C. (2011) 'Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates', Computers & Operations Research, Vol. 38, No. 5, pp.809-815.
    • (2011) Computers & Operations Research , vol.38 , Issue.5 , pp. 809-815
    • Lin, S.W.1    Lee, Z.J.2    Ying, K.C.3    Lu, C.C.4
  • 26
    • 0035519388 scopus 로고    scopus 로고
    • Parallel machine scheduling problems: A survey
    • Mokotoff, E. (2001) 'Parallel machine scheduling problems: a survey', Asia-Pacific Journal of Operational Research, Vol. 18, No. 2, pp.193-242.
    • (2001) Asia-Pacific Journal of Operational Research , vol.18 , Issue.2 , pp. 193-242
    • Mokotoff, E.1
  • 27
    • 67651208378 scopus 로고    scopus 로고
    • Assembly block storage location assignment problem: Revisited
    • Park, C. and Seo, J. (2009a) 'Assembly block storage location assignment problem: revisited', Production Planning & Control, Vol. 20, No. 3, pp.216-226.
    • (2009) Production Planning & Control , vol.20 , Issue.3 , pp. 216-226
    • Park, C.1    Seo, J.2
  • 28
    • 69649083955 scopus 로고    scopus 로고
    • Mathematical modeling and solving procedure of the planar storage location assignment problem
    • Park, C. and Seo, J. (2009b) 'Mathematical modeling and solving procedure of the planar storage location assignment problem', Computers & Industrial Engineering, Vol. 57, No. 3, pp.1062-1071.
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.3 , pp. 1062-1071
    • Park, C.1    Seo, J.2
  • 29
    • 74249112991 scopus 로고    scopus 로고
    • Comparing heuristic algorithm of the planar storage location assignment problem
    • Park, C. and Seo, J. (2010a) 'Comparing heuristic algorithm of the planar storage location assignment problem', Transportation Research Part E, Vol. 46, No. 1, pp.171-185.
    • (2010) Transportation Research Part e , vol.46 , Issue.1 , pp. 171-185
    • Park, C.1    Seo, J.2
  • 30
    • 84861894343 scopus 로고    scopus 로고
    • Ship assembly block operations management: A case study
    • Tavidze, A. (Ed.), Nova Science Publishers, New York
    • Park, C. and Seo, J. (2010b) 'Ship assembly block operations management: a case study', in Tavidze, A. (Ed.): Progress in Economics Research, Vol. 16, pp.131-146, Nova Science Publishers, New York.
    • (2010) Progress in Economics Research , vol.16 , pp. 131-146
    • Park, C.1    Seo, J.2
  • 31
    • 0036610212 scopus 로고    scopus 로고
    • A spatial scheduling application at the block paint shop in shipbuilding: The HYPOS project
    • Park, C., Chung, K.H., Park, J.C., Cho, K.K., Baek, T.H. and Son, E.I. (2002) 'A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project', Production Planning & Control, Vol. 13, No. 4, pp.342-354.
    • (2002) Production Planning & Control , vol.13 , Issue.4 , pp. 342-354
    • Park, C.1    Chung, K.H.2    Park, J.C.3    Cho, K.K.4    Baek, T.H.5    Son, E.I.6
  • 32
    • 33947672314 scopus 로고    scopus 로고
    • Assembly block storage location assignment at a shipyard: A case of Hyundai Heavy Industries
    • Park, C., Seo, J., Kim, J., Lee, S., Baek, T.H. and Min, S.K. (2007) 'Assembly block storage location assignment at a shipyard: a case of Hyundai Heavy Industries', Production Planning & Control, Vol. 18, No. 3, pp.180-189.
    • (2007) Production Planning & Control , vol.18 , Issue.3 , pp. 180-189
    • Park, C.1    Seo, J.2    Kim, J.3    Lee, S.4    Baek, T.H.5    Min, S.K.6
  • 34
    • 78650650542 scopus 로고    scopus 로고
    • Greedy randomized adaptive search procedures: Advances, hybridization, and applications
    • Gendreau, M. and Potvin, J.Y. (Eds.), 2nd ed., Springer, New York
    • Resende, M.G.C. and Ribeiro, C.C. (2010) 'Greedy randomized adaptive search procedures: advances, hybridization, and applications', in Gendreau, M. and Potvin, J.Y. (Eds.): Handbook of Metaheuristics, 2nd ed., pp.283-320, Springer, New York.
    • (2010) Handbook of Metaheuristics , pp. 283-320
    • Resende, M.G.C.1    Ribeiro, C.C.2
  • 35
    • 14644427728 scopus 로고    scopus 로고
    • A GRASP for parallel machine scheduling with time windows
    • Rojanasoonthon, S. and Bard, J. (2005) 'A GRASP for parallel machine scheduling with time windows', Journal of Computing, Vol. 17, No. 1, pp.32-51.
    • (2005) Journal of Computing , vol.17 , Issue.1 , pp. 32-51
    • Rojanasoonthon, S.1    Bard, J.2
  • 36
    • 0035900279 scopus 로고    scopus 로고
    • Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry
    • T'kindt, V., Billaut, J.C. and Proust, C. (2001) 'Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry', European Journal of Operational Research, Vol. 135, No. 1, pp.42-49.
    • (2001) European Journal of Operational Research , vol.135 , Issue.1 , pp. 42-49
    • T'Kindt, V.1    Billaut, J.C.2    Proust, C.3
  • 37
    • 67349221528 scopus 로고    scopus 로고
    • Design of a generic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
    • Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, M., Izadi, M. and Sassani, F. (2009) 'Design of a generic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints', Computers & Operations Research, Vol. 36, No. 12, pp.3224-3230.
    • (2009) Computers & Operations Research , vol.36 , Issue.12 , pp. 3224-3230
    • Tavakkoli-Moghaddam, R.1    Taheri, F.2    Bazzazi, M.3    Izadi, M.4    Sassani, F.5
  • 38
    • 71349083639 scopus 로고    scopus 로고
    • Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic
    • Ying, K.C. and Cheng, H.M. (2010) 'Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic', Expert Systems with Applications, Vol. 37, No. 4, pp.2848-2852.
    • (2010) Expert Systems with Applications , vol.37 , Issue.4 , pp. 2848-2852
    • Ying, K.C.1    Cheng, H.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.