-
6
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
-
I.M. Ovacik, and R. Uzsoy Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times International Journal of Production Research 33 1995 3173 3192
-
(1995)
International Journal of Production Research
, vol.33
, pp. 3173-3192
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
9
-
-
0013148980
-
A local-search heuristic for large set-covering problems
-
L.W. Jacobs, and M.J. Brusco A local-search heuristic for large set-covering problems Naval Research Logistics Quarterly 42 1995 1129 1140
-
(1995)
Naval Research Logistics Quarterly
, vol.42
, pp. 1129-1140
-
-
Jacobs, L.W.1
Brusco, M.J.2
-
10
-
-
84958631348
-
An evolutionary algorithm for large scale set covering problems with application to airline crew scheduling
-
E. Marchiori, and A. Steenbeek An evolutionary algorithm for large scale set covering problems with application to airline crew scheduling Lecture Notes in Computer Science 1803 2000 367 381
-
(2000)
Lecture Notes in Computer Science
, vol.1803
, pp. 367-381
-
-
Marchiori, E.1
Steenbeek, A.2
-
11
-
-
33750841084
-
A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
-
R. Ruiz, and T. Sttzle A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem European Journal of Operational Research 177 2007 2033 2049
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 2033-2049
-
-
Ruiz, R.1
Sttzle, T.2
-
12
-
-
34548509933
-
A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time
-
D. Baraz, and G. Mosheiov A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time European Journal of Operational Research 184 2008 810 813
-
(2008)
European Journal of Operational Research
, vol.184
, pp. 810-813
-
-
Baraz, D.1
Mosheiov, G.2
-
13
-
-
37049022197
-
An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
-
R. Ruiz, and T. Sttzle An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives European Journal of Operational Research 187 2008 1143 1159
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 1143-1159
-
-
Ruiz, R.1
Sttzle, T.2
-
14
-
-
49349104489
-
Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic
-
K.C. Ying Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic International Journal of Advanced Manufacturing Technology 38 2008 348 354
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.38
, pp. 348-354
-
-
Ying, K.C.1
-
15
-
-
67449115947
-
An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks
-
K.C. Ying An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks Journal of the Operational Research 60 2009 810 817
-
(2009)
Journal of the Operational Research
, vol.60
, pp. 810-817
-
-
Ying, K.C.1
-
16
-
-
58349107029
-
Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic
-
K.C. Ying, S.W. Lin, and C.Y. Huang Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic Expert Systems with Applications 36 2009 7087 7092
-
(2009)
Expert Systems with Applications
, vol.36
, pp. 7087-7092
-
-
Ying, K.C.1
Lin, S.W.2
Huang, C.Y.3
|