메뉴 건너뛰기




Volumn 23, Issue 5-6, 2004, Pages 366-374

Workflow balancing strategies in parallel machine scheduling

Author keywords

Bottleneck; Parallel machine scheduling; Scheduling; Workflow balancing; Workload balancing

Indexed keywords

CODES (SYMBOLS); COMPUTER SOFTWARE; JOB ANALYSIS; OBJECT ORIENTED PROGRAMMING; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 1942537646     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00170-003-1603-4     Document Type: Article
Times cited : (40)

References (23)
  • 1
    • 0035519388 scopus 로고    scopus 로고
    • Parallel machine scheduling problems - A survey
    • Mokotoff E (2001) Parallel machine scheduling problems - a survey. Asia, Pac J Oper Res 18:193-242
    • (2001) Asia, Pac J Oper Res , vol.18 , pp. 193-242
    • Mokotoff, E.1
  • 3
    • 1942457612 scopus 로고
    • On parallel machine scheduling with operator constrained setups
    • T. R. 94-85, Institute for Systems Research, The University of Maryland
    • Herrmann JW, Lee CY (1994) On parallel machine scheduling with operator constrained setups. Technical Research Report, T. R. 94-85, Institute for Systems Research, The University of Maryland
    • (1994) Technical Research Report
    • Herrmann, J.W.1    Lee, C.Y.2
  • 4
    • 1942521977 scopus 로고    scopus 로고
    • Aggregate production planning of FMS using the concept of operation types
    • Graduate School of Business, The University of Michigan, Ann Arbor, Michigan
    • Koltai T, Farkas A, Stecke KE (1998) Aggregate production planning of FMS using the concept of operation types. Working Paper 98007, Graduate School of Business, The University of Michigan, Ann Arbor, Michigan
    • (1998) Working Paper 98007
    • Koltai, T.1    Farkas, A.2    Stecke, K.E.3
  • 5
    • 1942521979 scopus 로고    scopus 로고
    • Workload balancing using the concept of operation types
    • Graduate School of Business, The University of Michigan, Ann Arbor, Michigan
    • Koltai T, Farkas A, Stecke, KE (1999) Workload balancing using the concept of operation types. Working Paper 99-002, Graduate School of Business, The University of Michigan, Ann Arbor, Michigan
    • (1999) Working Paper , vol.99 , Issue.2
    • Koltai, T.1    Farkas, A.2    Stecke, K.E.3
  • 6
    • 0016319331 scopus 로고
    • A loading and balancing methodology for job shop control
    • Irastorza JC, Deane RH (1974) A loading and balancing methodology for job shop control. AIIE Trans 6:302-307
    • (1974) AIIE Trans , vol.6 , pp. 302-307
    • Irastorza, J.C.1    Deane, R.H.2
  • 7
    • 0025477454 scopus 로고
    • A mixed-integer programming approach to the machine loading and process planning problem in a process layout environment
    • Liang M, Dutta SP (1990) A mixed-integer programming approach to the machine loading and process planning problem in a process layout environment. Int J Prod 28:1471-1484
    • (1990) Int J Prod , vol.28 , pp. 1471-1484
    • Liang, M.1    Dutta, S.P.2
  • 8
    • 0035917224 scopus 로고    scopus 로고
    • Comparing the effectiveness of workload balancing objectives in FMS loading
    • Kumar N, Shankar K (2001) Comparing the effectiveness of workload balancing objectives in FMS loading. Int J Prod 39:843-871
    • (2001) Int J Prod , vol.39 , pp. 843-871
    • Kumar, N.1    Shankar, K.2
  • 9
    • 0033132503 scopus 로고    scopus 로고
    • Workload balancing in the manufacturing environment: A multicriteria trade-off analysis
    • Kuula M, Stam A, Leino S, Ranta J, Wallenius J (1999) Workload balancing in the manufacturing environment: a multicriteria trade-off analysis. Int J Prod 37:1459-1477
    • (1999) Int J Prod , vol.37 , pp. 1459-1477
    • Kuula, M.1    Stam, A.2    Leino, S.3    Ranta, J.4    Wallenius, J.5
  • 10
    • 0033101727 scopus 로고    scopus 로고
    • A workload balancing model for determining set-up time and batch size reductions in GT flow line work cells
    • Gung RR, Steudel HJ (1999) A workload balancing model for determining set-up time and batch size reductions in GT flow line work cells. Int J Prod 37:769-791
    • (1999) Int J Prod , vol.37 , pp. 769-791
    • Gung, R.R.1    Steudel, H.J.2
  • 11
    • 0034236868 scopus 로고    scopus 로고
    • Scheduling algorithms for computer aided line balancing in printed circuit board assembly
    • Hayrinen T, Johnsson M, Johtela T, Smed J, Nevalainen O (2000) Scheduling algorithms for computer aided line balancing in printed circuit board assembly. Prod Plan C 11:497-510
    • (2000) Prod Plan C , vol.11 , pp. 497-510
    • Hayrinen, T.1    Johnsson, M.2    Johtela, T.3    Smed, J.4    Nevalainen, O.5
  • 12
    • 0037051317 scopus 로고    scopus 로고
    • Effect of load, processing time and due date variation on the effectiveness of scheduling rules
    • Lejmi T, Sabuncuoglu I (2002) Effect of load, processing time and due date variation on the effectiveness of scheduling rules. Int J Prod 40:945-974
    • (2002) Int J Prod , vol.40 , pp. 945-974
    • Lejmi, T.1    Sabuncuoglu, I.2
  • 13
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho PM, Simaria AS (2002) A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. Int J Prod 40:1405-1420
    • (2002) Int J Prod , vol.40 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 14
    • 0024082539 scopus 로고
    • Configuring cellular manufacturing systems
    • Co HC, Araar A (1988) Configuring cellular manufacturing systems. Int J Prod 26:1511-1522
    • (1988) Int J Prod , vol.26 , pp. 1511-1522
    • Co, H.C.1    Araar, A.2
  • 15
    • 0026254174 scopus 로고
    • Effects of loading and routing decisions on performance of flexible manufacturing systems
    • Chen IJ, Chung C (1991) Effects of loading and routing decisions on performance of flexible manufacturing systems. Int J Prod 29:2209-2225
    • (1991) Int J Prod , vol.29 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.2
  • 16
    • 0032639332 scopus 로고    scopus 로고
    • Machine loading and part type selection in flexible manufacturing systems
    • Guerrero F, Lozano S, Koltai T, Larraneta J (1999) Machine loading and part type selection in flexible manufacturing systems. Int J Prod 37:1303-1317
    • (1999) Int J Prod , vol.37 , pp. 1303-1317
    • Guerrero, F.1    Lozano, S.2    Koltai, T.3    Larraneta, J.4
  • 17
    • 1942490039 scopus 로고
    • Machine utilizations achieved using balanced FMS production ratios in a simulated setting
    • Graduate School of Business, The University of Michigan, Ann Arbor, Michigan
    • Schriber TJ, Stecke KE (1986) Machine utilizations achieved using balanced FMS production ratios in a simulated setting. Working Paper 486, Graduate School of Business, The University of Michigan, Ann Arbor, Michigan
    • (1986) Working Paper , vol.486
    • Schriber, T.J.1    Stecke, K.E.2
  • 18
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops. A critical assessment
    • Land M, Gaalman G (1996) Workload control concepts in job shops. A critical assessment. Int J Pro E 46-47:535-548
    • (1996) Int J Pro E , vol.46-47 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 19
    • 0012237785 scopus 로고    scopus 로고
    • The influence of shop characteristics on workload control
    • The University of Groningen
    • Oosterman B, Land M, Gaalman GJC (1998) The influence of shop characteristics on workload control. Research report 98a28, The University of Groningen
    • (1998) Research Report 98a28
    • Oosterman, B.1    Land, M.2    Gaalman, G.J.C.3
  • 21
    • 1942457611 scopus 로고    scopus 로고
    • Simultaneous job scheduling and resource allocation on parallel machines
    • The University of Pennsylvania Research Foundation
    • Chen ZL (1999) Simultaneous job scheduling and resource allocation on parallel machines. Working paper 99-04, The University of Pennsylvania Research Foundation
    • (1999) Working Paper , vol.99 , Issue.4
    • Chen, Z.L.1
  • 22
    • 0036274180 scopus 로고    scopus 로고
    • A case study on the wafer probing scheduling problem
    • Pearn WL, Chung, Yang, SHM H (2000) A case study on the wafer probing scheduling problem. Prod Plan C 13:66-75
    • (2000) Prod Plan C , vol.13 , pp. 66-75
    • Pearn, W.L.1    Chung, Y.2    Shm, H.3
  • 23
    • 0033717569 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines applying neural network and heuristic rule
    • Park Y, Kim S, Lee JH (2000) Scheduling jobs on parallel machines applying neural network and heuristic rule. Comput Ind Eng 38:189-202
    • (2000) Comput Ind Eng , vol.38 , pp. 189-202
    • Park, Y.1    Kim, S.2    Lee, J.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.