On a parallel machine scheduling problem with precedence constraints
-
Aho, I. and Makinen, E., 2006. On a parallel machine scheduling problem with precedence constraints. Journal of Scheduling, 9 (5), 493-495.
-
(2006)
Journal of Scheduling
, vol.9
, Issue.5
, pp. 493-495
-
-
Aho, I.1
Makinen, E.2
-
2
-
-
1242265218
-
Minimizing makespan on parallel machines with release time and machine eligibility restrictions
-
Centeno, G. and Armacost, R.L., 2004. Minimizing makespan on parallel machines with release time and machine eligibility restrictions. International Journal of Production Research, 42 (6), 1243-1256.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.6
, pp. 1243-1256
-
-
Centeno, G.1
Armacost, R.L.2
-
3
-
-
0013027033
-
An efficient approximation algorithm for minimizing makespan on uniformly related machines
-
Chekuri, C., 2001. An efficient approximation algorithm for minimizing makespan on uniformly related machines. Journal ofAlgorithms, 41 (2), 212-224.
-
(2001)
Journal ofAlgorithms
, vol.41
, Issue.2
, pp. 212-224
-
-
Chekuri, C.1
-
4
-
-
0025474221
-
A state-of-the-art review of parallel machine scheduling research
-
Cheng, T.C.E. and Sin, C.C.S., 1990. A state-of-the-art review of parallel machine scheduling research. European Journal of Operational Research, 47 (3), 271-292.
-
(1990)
European Journal of Operational Research
, vol.47
, Issue.3
, pp. 271-292
-
-
Cheng, T.C.E.1
Sin, C.C.S.2
-
5
-
-
0031641788
-
Integrated process planning and scheduling systems for block assembly in shipbuilding
-
Cho, K.K., et al., 1998. Integrated process planning and scheduling systems for block assembly in shipbuilding. CIRP Annals Manufacturing Technology, 47 (1), 419-422.
-
(1998)
CIRP Annals Manufacturing Technology
, vol.47
, Issue.1
, pp. 419-422
-
-
Cho, K.K.1
-
6
-
-
0034957508
-
A spatial scheduling system for block painting process in shipbuilding
-
Cho, K.K., et al., 2001. A spatial scheduling system for block painting process in shipbuilding. CIRP Annals Manufacturing Technology, 50 (1), 339-342.
-
(2001)
CIRP Annals Manufacturing Technology
, vol.50
, Issue.1
, pp. 339-342
-
-
Cho, K.K.1
-
7
-
-
34247131354
-
Looking-forward scheduling approach applied in pre-erection area of a shipyard
-
Duck, Y.Y. and Ranjan, V., 2007. Looking-forward scheduling approach applied in pre-erection area of a shipyard. Journal ofShip Production, 23 (1), 30-35.
-
(2007)
Journal ofShip Production
, vol.23
, Issue.1
, pp. 30-35
-
-
Duck, Y.Y.1
Ranjan, V.2
-
8
-
-
0031275738
-
Heuristics for unrelated machine scheduling with precedence constraints
-
Herrmann, J., Proth, J.-M., and Sauer, N., 1997. Heuristics for unrelated machine scheduling with precedence constraints. European Journal of Operational Research, 102 (3), 528-537.
-
(1997)
European Journal of Operational Research
, vol.102
, Issue.3
, pp. 528-537
-
-
Herrmann, J.1
Proth, J.-M.2
Sauer, N.3
-
9
-
-
0035681031
-
List scheduling in a parallel machine environment with precedence constraints and setup times
-
Hurink, J. and Knust, S., 2001. List scheduling in a parallel machine environment with precedence constraints and setup times. Operational Research Letters, 29 (5), 231-239.
-
(2001)
Operational Research Letters
, vol.29
, Issue.5
, pp. 231-239
-
-
Hurink, J.1
Knust, S.2
-
10
-
-
0036374260
-
Applying digital manufacturing technology to ship production and the martime environment
-
Kim, H., et al., 2002. Applying digital manufacturing technology to ship production and the martime environment. Integrated Manufacturing Systems, 13 (5), 295-305.
-
(2002)
Integrated Manufacturing Systems
, vol.13
, Issue.5
, pp. 295-305
-
-
Kim, H.1
-
11
-
-
32144460178
-
A model for a simulation-based shipbuilding system in a shipyard manufacturing process
-
Kim, H., et al., 2005. A model for a simulation-based shipbuilding system in a shipyard manufacturing process. International Journal of Computer Integrated manufacturing, 18 (6), 427-441.
-
(2005)
International Journal of Computer Integrated manufacturing
, vol.18
, Issue.6
, pp. 427-441
-
-
Kim, H.1
-
12
-
-
0031103567
-
Developing scheduling systems for Daewoo Shipbuilding: DAS project
-
Lee, J.K., et al., 1997. Developing scheduling systems for Daewoo Shipbuilding: DAS project. European Journal Operation Research, 97 (2), 380-395.
-
(1997)
European Journal Operation Research
, vol.97
, Issue.2
, pp. 380-395
-
-
Lee, J.K.1
-
13
-
-
33745188709
-
Complexity of scheduling under precedence constraints
-
Lenstra, J.K. and Rinnooy Kan, A.H.G., 1987. Complexity of scheduling under precedence constraints. Operations Research, 26 (1), 23-35.
-
(1987)
Operations Research
, vol.26
, Issue.1
, pp. 23-35
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
-
14
-
-
34548502246
-
Parallel machine scheduling with machine availability and eligibility constraints
-
Liao, L.-W. and Shin, G.-J., 2007. Parallel machine scheduling with machine availability and eligibility constraints. European Journal ofOperational Research, 184 (2), 458-467.
-
(2007)
European Journal ofOperational Research
, vol.184
, Issue.2
, pp. 458-467
-
-
Liao, L.-W.1
Shin, G.-J.2
-
16
-
-
74549113735
-
-
European Journal ofOperational Research, 156 (1), 261-266.
-
European Journal ofOperational Research, 156 (1), 261-266.
-
-
-
-
18
-
-
0030196914
-
Modeling and solving the spatial block scheduling problem in a shipbuilding company
-
Park, K., et al., 1996. Modeling and solving the spatial block scheduling problem in a shipbuilding company. Computer and Industrial Engineering, 30 (3), 357-364.
-
(1996)
Computer and Industrial Engineering
, vol.30
, Issue.3
, pp. 357-364
-
-
Park, K.1
-
20
-
-
33750189214
-
Approximation bounds for a general class of precedence constrained parallel machine scheduling problems
-
Queyranne, M. and Schulz, A.S., 2006. Approximation bounds for a general class of precedence constrained parallel machine scheduling problems. SIAM Journal on Computing, 35 (5), 1241-1253.
-
(2006)
SIAM Journal on Computing
, vol.35
, Issue.5
, pp. 1241-1253
-
-
Queyranne, M.1
Schulz, A.S.2
-
21
-
-
33644537918
-
Sequencing precedence-related jobs on two machines to minimize the weighted completion time
-
Ramachandra, G. and Elmaghraby, S.E., 2006. Sequencing precedence-related jobs on two machines to minimize the weighted completion time. International Journal of Production Economics, 100 (1), 44-58.
-
(2006)
International Journal of Production Economics
, vol.100
, Issue.1
, pp. 44-58
-
-
Ramachandra, G.1
Elmaghraby, S.E.2
-
22
-
-
33748711826
-
Shipbuilding erection network optimization: A TSP method
-
Ranjan, V. and Duck, Y.Y., 2006. Shipbuilding erection network optimization: a TSP method. Journal of Ship Production, 22 (3), 139-146.
-
(2006)
Journal of Ship Production
, vol.22
, Issue.3
, pp. 139-146
-
-
Ranjan, V.1
Duck, Y.Y.2
-
23
-
-
34548386186
-
Generation of production material information for a building block and simulation of block erection for process planning and scheduling in shipbuilding
-
Roh, M.-I. and Lee, K.-Y., 2007. Generation of production material information for a building block and simulation of block erection for process planning and scheduling in shipbuilding. International Journal of Production Research, 45 (20), 4653-4683.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.20
, pp. 4653-4683
-
-
Roh, M.-I.1
Lee, K.-Y.2
|