메뉴 건너뛰기




Volumn 13, Issue 1, 2006, Pages 7-26

The impact of a design management training initiative on project performance

Author keywords

Construction works; Design management; Procurement; Project management; Project teams; Training methods

Indexed keywords

METHOD OF MOMENTS; PERSONNEL TRAINING; PRODUCT DESIGN; PROJECT MANAGEMENT; SOCIETIES AND INSTITUTIONS;

EID: 30644476972     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980610646476     Document Type: Article
Times cited : (9)

References (21)
  • 1
    • 0030093820 scopus 로고    scopus 로고
    • A data flow model to plan and manage the build design process
    • Austin, S.A., Baldwin, A.N. and Newton, A.J. (1996), “A data flow model to plan and manage the build design process”, Journal of Engineering Design, Vol. 7 No. 1, pp. 3-17.
    • (1996) Journal of Engineering Design , vol.7 , Issue.1 , pp. 3-17
    • Austin, S.A.1    Baldwin, A.N.2    Newton, A.J.3
  • 4
    • 1842824481 scopus 로고
    • Why change programs don't produce change
    • in Mabey, C. and Mayon-White, B. (Eds), Paul Chapman Publishing, London.
    • Beer, M., Eisenstat, R.A. and Spector, B. (1993), “Why change programs don't produce change”, in Mabey, C. and Mayon-White, B. (Eds), Managing Change, 2nd ed., Paul Chapman Publishing, London.
    • (1993) Managing Change, 2nd ed.
    • Beer, M.1    Eisenstat, R.A.2    Spector, B.3
  • 8
    • 84993081841 scopus 로고    scopus 로고
    • Design management in practice: testing a training initiative to deliver tools and learning
    • Bibby, L., Bouchlaghem, D. and Austin, S. (2003b), “Design management in practice: testing a training initiative to deliver tools and learning”, Construction Innovation, Vol. 3 No. 4.
    • (2003) Construction Innovation , vol.3 , Issue.4
    • Bibby, L.1    Bouchlaghem, D.2    Austin, S.3
  • 11
    • 0000716911 scopus 로고    scopus 로고
    • Cultural issues in implementing changes to new product development process in a small to medium sized enterprise (SME)
    • Filson, A. and Lewis, A. (2000), “Cultural issues in implementing changes to new product development process in a small to medium sized enterprise (SME)”, Journal of Engineering Design, Vol. 11 No. 2, pp. 149-57.
    • (2000) Journal of Engineering Design , vol.11 , Issue.2 , pp. 149-157
    • Filson, A.1    Lewis, A.2
  • 13
    • 0039346545 scopus 로고    scopus 로고
    • Why does industry ignore design science
    • Frost, R.B. (1999), “Why does industry ignore design science”, Journal of Engineering Design, Vol. 10 No. 4, pp. 301-4.
    • (1999) Journal of Engineering Design , vol.10 , Issue.4 , pp. 301-304
    • Frost, R.B.1
  • 15
    • 0034195958 scopus 로고    scopus 로고
    • Have we forgotten the fundamental IT enabler: ease of use
    • Kanter, J. (2000), “Have we forgotten the fundamental IT enabler: ease of use”, Information Systems Management, Vol. 17 No. 3, pp. 71-7.
    • (2000) Information Systems Management , vol.17 , Issue.3 , pp. 71-77
    • Kanter, J.1
  • 16
    • 1542493572 scopus 로고    scopus 로고
    • Project management actions to improve design phase cost performance
    • Kuprenas, J.A. (2003), “Project management actions to improve design phase cost performance”, Journal of Management in Engineering, Vol. 19 No. 1, pp. 25-32.
    • (2003) Journal of Management in Engineering , vol.19 , Issue.1 , pp. 25-32
    • Kuprenas, J.A.1
  • 19
    • 0042341140 scopus 로고    scopus 로고
    • Project maturity and competence interface
    • Skulmoski, G. (2001), “Project maturity and competence interface”, Cost Engineering, Vol. 43 No. 6, pp. 11-18.
    • (2001) Cost Engineering , vol.43 , Issue.6 , pp. 11-18
    • Skulmoski, G.1
  • 20
    • 0000004970 scopus 로고
    • The Scanlon Plan: causes and correlates of success
    • White, K. (1979), “The Scanlon Plan: causes and correlates of success”, Academy of Management Journal, Vol. 22, June, pp. 292-312.
    • (1979) Academy of Management Journal , vol.22 , pp. 292-312
    • White, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.