메뉴 건너뛰기




Volumn 32, Issue 2, 2013, Pages 382-391

Robust manufacturing line design with controlled moderate robustness in bottleneck buffer time to manage stochastic inter-task times

Author keywords

Buffer time; Conservatism level; Manufacturing line design; Robust optimization; Stochastic inter task time

Indexed keywords

BUFFER TIME; CONSERVATISM LEVEL; MANUFACTURING LINES; ROBUST OPTIMIZATION; STOCHASTIC INTER-TASK TIME;

EID: 84875263169     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2012.12.005     Document Type: Article
Times cited : (22)

References (32)
  • 1
    • 77957716540 scopus 로고    scopus 로고
    • Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility
    • E. Nazarian, J. Ko, and H. Wang Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility Journal of Manufacturing Systems 29 2010 35 46
    • (2010) Journal of Manufacturing Systems , vol.29 , pp. 35-46
    • Nazarian, E.1    Ko, J.2    Wang, H.3
  • 3
    • 43449085514 scopus 로고    scopus 로고
    • The sequence-dependent assembly line balancing problem
    • A. Scholl, N. Boysen, and M. Fliedner The sequence-dependent assembly line balancing problem OR Spectrum 30 2008 579 609
    • (2008) OR Spectrum , vol.30 , pp. 579-609
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 5
    • 0023586184 scopus 로고
    • An exploratory study on stopping a paced line when incompletions occur
    • H.S. Lau, and A. Shtub An exploratory study on stopping a paced line when incompletions occur IIE Transactions 19 1987 463 467
    • (1987) IIE Transactions , vol.19 , pp. 463-467
    • Lau, H.S.1    Shtub, A.2
  • 6
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • P.R. McMullen, and G.V. Frazier Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations International Journal of Production Research 36 1998 2717 2742
    • (1998) International Journal of Production Research , vol.36 , pp. 2717-2742
    • McMullen, P.R.1    Frazier, G.V.2
  • 7
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • P.R. McMullen, and P. Tarasewich Using ant techniques to solve the assembly line balancing problem IIE Transactions 35 2003 605 617
    • (2003) IIE Transactions , vol.35 , pp. 605-617
    • McMullen, P.R.1    Tarasewich, P.2
  • 9
  • 10
    • 77955285833 scopus 로고    scopus 로고
    • Manufacturing system design considering stochastic product evolution and task recurrence
    • J. Ko, and S.J. Hu Manufacturing system design considering stochastic product evolution and task recurrence Journal of Manufacturing Science and Engineering 131 2009 051012
    • (2009) Journal of Manufacturing Science and Engineering , vol.131 , pp. 051012
    • Ko, J.1    Hu, S.J.2
  • 11
    • 77951102264 scopus 로고    scopus 로고
    • Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches
    • Q. Wang, S. Lassalle, A.R. Mileham, and G.W. Owen Analysis of a linear walking worker line using a combination of computer simulation and mathematical modeling approaches Journal of Manufacturing Systems 28 2009 64 70
    • (2009) Journal of Manufacturing Systems , vol.28 , pp. 64-70
    • Wang, Q.1    Lassalle, S.2    Mileham, A.R.3    Owen, G.W.4
  • 13
    • 46149112187 scopus 로고    scopus 로고
    • Balancing of manufacturing systems with complex configurations for delayed product differentiation
    • J. Ko, and S.J. Hu Balancing of manufacturing systems with complex configurations for delayed product differentiation International Journal of Production Research 46 2008 4285 4308
    • (2008) International Journal of Production Research , vol.46 , pp. 4285-4308
    • Ko, J.1    Hu, S.J.2
  • 14
    • 75849138540 scopus 로고    scopus 로고
    • Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
    • U. Özcan Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm European Journal of Operational Research 205 2010 81 97
    • (2010) European Journal of Operational Research , vol.205 , pp. 81-97
    • Özcan, U.1
  • 15
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • F.N. Silverman, and J.C. Carter A cost-based methodology for stochastic line balancing with intermittent line stoppages Management Science 1986 455 463
    • (1986) Management Science , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 16
    • 0036568989 scopus 로고    scopus 로고
    • A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes
    • N.F. Giannelos, and M.C. Georgiadis A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes Industrial and Engineering Chemistry Research 41 2002 2178 2184
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , pp. 2178-2184
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 19
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • C. Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 2006 694 715
    • (2006) European Journal of Operational Research , vol.168 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 20
    • 84855779322 scopus 로고    scopus 로고
    • Design of assembly lines with the concurrent consideration of productivity and upper extremity musculoskeletal disorders using linear models
    • Z. Xu, J. Ko, D.J. Cochran, and M.C. Jung Design of assembly lines with the concurrent consideration of productivity and upper extremity musculoskeletal disorders using linear models Computers and Industrial Engineering 62 2012 431 441
    • (2012) Computers and Industrial Engineering , vol.62 , pp. 431-441
    • Xu, Z.1    Ko, J.2    Cochran, D.J.3    Jung, M.C.4
  • 24
    • 0025462434 scopus 로고
    • Development of cost model for the single-model stochastic assembly line balancing problem
    • S.C. Sarin, and E. Erel Development of cost model for the single-model stochastic assembly line balancing problem International Journal of Production Research 28 1990 1305 1316
    • (1990) International Journal of Production Research , vol.28 , pp. 1305-1316
    • Sarin, S.C.1    Erel, E.2
  • 25
    • 0021392913 scopus 로고
    • Effect of incompletion cost on line balancing with multiple manning of work stations
    • A. Shtub Effect of incompletion cost on line balancing with multiple manning of work stations International Journal of Production Research 22 1984 235 245
    • (1984) International Journal of Production Research , vol.22 , pp. 235-245
    • Shtub, A.1
  • 28
    • 0442266090 scopus 로고    scopus 로고
    • Robust solutions of linear programming problems contaminated with uncertain data
    • A. Ben-Tal, and A. Nemirovski Robust solutions of linear programming problems contaminated with uncertain data Mathematical Programming 88 2000 411 424
    • (2000) Mathematical Programming , vol.88 , pp. 411-424
    • Ben-Tal, A.1    Nemirovski, A.2
  • 32
    • 0342483479 scopus 로고
    • A computational procedure for balancing zoned assembly lines
    • J. Mitchell A computational procedure for balancing zoned assembly lines Research Report 1957 1 R3
    • (1957) Research Report
    • Mitchell, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.