Interrelationships among critical success factors of construction projects based on the structural equation model

Author keywords

Construction projects; Critical success factors; Interrelationship; Structural equation model

Indexed keywords

CONSTRUCTION PROJECTS; CRITICAL CONTROL POINTS; CRITICAL SUCCESS FACTOR; EMERGENCY PROJECTS; GOODNESS OF FIT; HYPOTHETICAL MODELS; INFLUENCE MECHANISM; INTERRELATIONSHIP; LITERATURE REVIEWS; PRICE FLUCTUATION; PROJECT DATA; PROJECT MANAGERS; QUESTIONNAIRE SURVEYS; STRUCTURAL EQUATION MODELS;

EID: 84873397260     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000104     Document Type: Article
Times cited : (121)

References (38)
  • 1
    • 42949084772 scopus 로고    scopus 로고
    • Critical success factors influencing safety program performance in Thai construction projects
    • 10.1016/j.ssci.2007.06.006
    • Aksorn, T., and, Hadikusumo, B. H. W. (2008). " Critical success factors influencing safety program performance in Thai construction projects." Saf. Sci. SSCIEO 0925-7535, 46 (4), 709-727. 10.1016/j.ssci.2007.06.006
    • (2008) Saf. Sci. SSCIEO 0925-7535 , vol.46 , Issue.4 , pp. 709-727
    • Aksorn, T.1    Hadikusumo, B.H.W.2
  • 3
    • 84965402882 scopus 로고
    • Tests for structural equation models: Introduction
    • 10.1177/0049124192021002001
    • Bollen, K. A., and, Long, J. S. (1992). " Tests for structural equation models: Introduction." Sociol. Methods Res. 0049-1241, 21 (2), 123-131. 10.1177/0049124192021002001
    • (1992) Sociol. Methods Res. 0049-1241 , vol.21 , Issue.2 , pp. 123-131
    • Bollen, K.A.1    Long, J.S.2
  • 5
    • 77951288378 scopus 로고    scopus 로고
    • Critical success factors for PPPs in infrastructure developments: Chinese perspective
    • 10.1061/(ASCE)CO.1943-7862.0000152
    • Chan, A. P. C., Lam, P. T. I., Chan, D. W. M., Cheung, E., and, Ke, Y. J. (2010). " Critical success factors for PPPs in infrastructure developments: Chinese perspective." J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (5), 484-494. 10.1061/(ASCE)CO.1943-7862.0000152
    • (2010) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.136 , Issue.5 , pp. 484-494
    • Chan, A.P.C.1    Lam, P.T.I.2    Chan, D.W.M.3    Cheung, E.4    Ke, Y.J.5
  • 6
    • 13944265046 scopus 로고    scopus 로고
    • Factors affecting the success of a construction project
    • 10.1061/(ASCE)0733-9364(2004)130:1(153)
    • Chan, A. P. C., Scott, D., and, Chan, A. P. L. (2004). " Factors affecting the success of a construction project." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (1), 153-155. 10.1061/(ASCE)0733-9364(2004)130:1(153)
    • (2004) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.130 , Issue.1 , pp. 153-155
    • Chan, A.P.C.1    Scott, D.2    Chan, A.P.L.3
  • 7
    • 67349251176 scopus 로고    scopus 로고
    • Effect of project characteristics on project performance in construction projects based on structural equation model
    • 10.1016/j.eswa.2009.01.032
    • Cho, K. M., Hong, T. H., and, Hyun, C. T. (2009). " Effect of project characteristics on project performance in construction projects based on structural equation model." Expert Syst. Appl. ESAPEH 0957-4174, 36 (7), 10461-10470. 10.1016/j.eswa.2009.01.032
    • (2009) Expert Syst. Appl. ESAPEH 0957-4174 , vol.36 , Issue.7 , pp. 10461-10470
    • Cho, K.M.1    Hong, T.H.2    Hyun, C.T.3
  • 8
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factors for different project objectives
    • 10.1061/(ASCE)0733-9364(1999)125:3(142)
    • Chua, D. K. H., Kog, Y. C., and, Loh, P. K. (1999). " Critical success factors for different project objectives." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 142-150. 10.1061/(ASCE)0733-9364(1999)125:3(142)
    • (1999) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 9
    • 0036532705 scopus 로고    scopus 로고
    • The 'real' success factors on projects
    • 10.1016/S0263-7863(01)00067-9
    • Cooke-Davies, T. (2002). " The 'real' success factors on projects." Int. J. Proj. Manage. IPMAEL 0263-7863, 20 (3), 185-190. 10.1016/S0263-7863(01)00067-9
    • (2002) Int. J. Proj. Manage. IPMAEL 0263-7863 , vol.20 , Issue.3 , pp. 185-190
    • Cooke-Davies, T.1
  • 10
    • 33646950425 scopus 로고    scopus 로고
    • Critical managerial factors affecting defense projects success: A comparison between neural network and regression analysis
    • 10.1016/j.engappai.2005.12.002
    • Dvir, D., Ben-David, A., Sadeh, A., and, Shenhar, A. J. (2006). " Critical managerial factors affecting defense projects success: A comparison between neural network and regression analysis." Eng. Appl. Artif. Intell. EAAIE6 0952-1976, 19 (5), 535-543. 10.1016/j.engappai.2005.12.002
    • (2006) Eng. Appl. Artif. Intell. EAAIE6 0952-1976 , vol.19 , Issue.5 , pp. 535-543
    • Dvir, D.1    Ben-David, A.2    Sadeh, A.3    Shenhar, A.J.4
  • 11
    • 30744474430 scopus 로고    scopus 로고
    • Framing of project critical success factors by a systems model
    • 10.1016/j.ijproman.2005.07.004
    • Fortune, J., and, White, D. (2006). " Framing of project critical success factors by a systems model." Int. J. Proj. Manage. IPMAEL 0263-7863, 24 (1), 53-65. 10.1016/j.ijproman.2005.07.004
    • (2006) Int. J. Proj. Manage. IPMAEL 0263-7863 , vol.24 , Issue.1 , pp. 53-65
    • Fortune, J.1    White, D.2
  • 13
    • 34248590966 scopus 로고    scopus 로고
    • Predicting profit performance for selecting candidate international construction projects
    • 10.1061/(ASCE)0733-9364(2007)133:6(425)
    • Han, S. H., Kim, D. Y., and, Kim, H. (2007). " Predicting profit performance for selecting candidate international construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (6), 425-436. 10.1061/(ASCE)0733- 9364(2007)133:6(425)
    • (2007) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.133 , Issue.6 , pp. 425-436
    • Han, S.H.1    Kim, D.Y.2    Kim, H.3
  • 15
    • 15744362051 scopus 로고    scopus 로고
    • Structural equation model of project planning effectiveness
    • 10.1080/0144619042000301384
    • Islam, M. D. M., and, Faniran, O. O. (2005). " Structural equation model of project planning effectiveness." Constr. Manage. Econ. 0144-6193, 23 (2), 215-223. 10.1080/0144619042000301384
    • (2005) Constr. Manage. Econ. 0144-6193 , vol.23 , Issue.2 , pp. 215-223
    • Islam, M.D.M.1    Faniran, O.O.2
  • 16
    • 18144374111 scopus 로고    scopus 로고
    • Factors affecting cost performance: Evidence from Indian construction projects
    • 10.1016/j.ijproman.2004.10.003
    • Iyer, K. C., and, Jha, K. N. (2005). " Factors affecting cost performance: Evidence from Indian construction projects." Int. J. Proj. Manage. IPMAEL 0263-7863, 23 (4), 283-295. 10.1016/j.ijproman.2004.10.003
    • (2005) Int. J. Proj. Manage. IPMAEL 0263-7863 , vol.23 , Issue.4 , pp. 283-295
    • Iyer, K.C.1    Jha, K.N.2
  • 17
    • 33746190774 scopus 로고    scopus 로고
    • Critical factors affecting schedule performance: Evidence from Indian construction projects
    • 10.1061/(ASCE)0733-9364(2006)132:8(871)
    • Iyer, K. C., and, Jha, K. N. (2006). " Critical factors affecting schedule performance: Evidence from Indian construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (8), 871-881. 10.1061/(ASCE)0733- 9364(2006)132:8(871)
    • (2006) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.132 , Issue.8 , pp. 871-881
    • Iyer, K.C.1    Jha, K.N.2
  • 18
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • 10.1080/014461997373132
    • Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and, Harris, F. C. (1997). " Factors influencing construction time and cost overruns on high-rise projects in Indonesia." Constr. Manage. Econ. 0144-6193, 15 (1), 83-94. 10.1080/014461997373132
    • (1997) Constr. Manage. Econ. 0144-6193 , vol.15 , Issue.1 , pp. 83-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 19
    • 56349120726 scopus 로고    scopus 로고
    • Structuring the prediction model of project performance for international construction projects: A comparative analysis
    • 10.1016/j.eswa.2007.12.048
    • Kim, D. Y., Han, S. H., Kim, H., and, Park, H. (2009). " Structuring the prediction model of project performance for international construction projects: A comparative analysis." Expert Syst. Appl. ESAPEH 0957-4174, 36 (2), 1961-1971. 10.1016/j.eswa.2007.12.048
    • (2009) Expert Syst. Appl. ESAPEH 0957-4174 , vol.36 , Issue.2 , pp. 1961-1971
    • Kim, D.Y.1    Han, S.H.2    Kim, H.3    Park, H.4
  • 21
    • 42549124018 scopus 로고    scopus 로고
    • Determinants of successful design-build projects
    • 10.1061/(ASCE)0733-9364(2008)134:5(333)
    • Lam, E. W. M., Chan, A. P. C., and, Chan, D. W. M. (2008). " Determinants of successful design-build projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (5), 333-341. 10.1061/(ASCE)0733-9364(2008)134:5(333)
    • (2008) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.134 , Issue.5 , pp. 333-341
    • Lam, E.W.M.1    Chan, A.P.C.2    Chan, D.W.M.3
  • 22
    • 22144480927 scopus 로고    scopus 로고
    • Critical success factors for PPP/PFI projects in the UK construction industry
    • 10.1080/01446190500041537
    • Li, B., Akintoye, A., Edwards, P. J., and, Hardcastle, C. (2005). " Critical success factors for PPP/PFI projects in the UK construction industry." Constr. Manage. Econ. 0144-6193, 23 (5), 459-471. 10.1080/01446190500041537
    • (2005) Constr. Manage. Econ. 0144-6193 , vol.23 , Issue.5 , pp. 459-471
    • Li, B.1    Akintoye, A.2    Edwards, P.J.3    Hardcastle, C.4
  • 23
    • 2142774401 scopus 로고    scopus 로고
    • Predicting performance of design-build and design-bid-build projects
    • 10.1061/(ASCE)0733-9364(2004)130:1(75)
    • Ling, F. Y. Y., Chan, S. L., Chong, E., and, Ee, L. P. (2004). " Predicting performance of design-build and design-bid-build projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (1), 75-83. 10.1061/(ASCE)0733- 9364(2004)130:1(75)
    • (2004) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.130 , Issue.1 , pp. 75-83
    • Ling, F.Y.Y.1    Chan, S.L.2    Chong, E.3    Ee, L.P.4
  • 24
    • 2642566694 scopus 로고    scopus 로고
    • Using neural network to predict performance of design-build projects in Singapore
    • 10.1016/j.buildenv.2004.02.008
    • Ling, F. Y. Y., and, Liu, M. (2004). " Using neural network to predict performance of design-build projects in Singapore." Build. Environ. BUSCBC 0360-1323, 39 (10), 1263-1274. 10.1016/j.buildenv.2004.02.008
    • (2004) Build. Environ. BUSCBC 0360-1323 , vol.39 , Issue.10 , pp. 1263-1274
    • Ling, F.Y.Y.1    Liu, M.2
  • 25
    • 0034225610 scopus 로고    scopus 로고
    • Structural equation model of construction contract dispute potential
    • 10.1061/(ASCE)0733-9364(2000)126:4(268)
    • Molenaar, K., Washington, S., and, Diekmann, J. (2000). " Structural equation model of construction contract dispute potential." J. Constr. Eng. Manage. JCEMD4 0733-9364, 126 (4), 268-277. 10.1061/(ASCE)0733-9364(2000) 126:4(268)
    • (2000) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.126 , Issue.4 , pp. 268-277
    • Molenaar, K.1    Washington, S.2    Diekmann, J.3
  • 26
    • 77951623769 scopus 로고    scopus 로고
    • A structural equation model of feasibility evaluation and project success for public-private partnerships in Hong Kong
    • 10.1109/TEM.2009.2037142
    • Ng, S. T., Wong, Y. M. W., and, Wong, J. M. W. (2010). " A structural equation model of feasibility evaluation and project success for public-private partnerships in Hong Kong." IEEE Trans. Eng. Manage. IEEMA4 0018-9391, 57 (2), 310-322. 10.1109/TEM.2009.2037142
    • (2010) IEEE Trans. Eng. Manage. IEEMA4 0018-9391 , vol.57 , Issue.2 , pp. 310-322
    • Ng, S.T.1    Wong, Y.M.W.2    Wong, J.M.W.3
  • 27
    • 70350241411 scopus 로고    scopus 로고
    • Whole life performance assessment: Critical success factors
    • 10.1061/(ASCE)CO.1943-7862.0000090
    • Park, S. H. (2009). " Whole life performance assessment: Critical success factors." J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (11), 1146-1161. 10.1061/(ASCE)CO.1943-7862.0000090
    • (2009) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.135 , Issue.11 , pp. 1146-1161
    • Park, S.H.1
  • 28
    • 0002344077 scopus 로고
    • Reliability: A review of psychometric basics and recent marketing practices
    • 10.2307/3150868
    • Peter, J. P. (1979). " Reliability: A review of psychometric basics and recent marketing practices." J. Market. Res. 0022-2437, 16 (1), 6-17. 10.2307/3150868
    • (1979) J. Market. Res. 0022-2437 , vol.16 , Issue.1 , pp. 6-17
    • Peter, J.P.1
  • 30
    • 0006822095 scopus 로고
    • The changing role of the information systems executive: A critical success factors perspective
    • Rockart, J. F. (1982). " The changing role of the information systems executive: A critical success factors perspective." Sloan Management Review, 24 (1), 3-13.
    • (1982) Sloan Management Review , vol.24 , Issue.1 , pp. 3-13
    • Rockart, J.F.1
  • 31
    • 0026835330 scopus 로고
    • Critical success factors for construction projects
    • 10.1061/(ASCE)0733-9364(1992)118:1(94)
    • Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., and, Coyle, M. (1992). " Critical success factors for construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 118 (1), 94-111. 10.1061/(ASCE)0733- 9364(1992)118:1(94)
    • (1992) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.118 , Issue.1 , pp. 94-111
    • Sanvido, V.1    Grobler, F.2    Parfitt, K.3    Guvenis, M.4    Coyle, M.5
  • 32
    • 84873332311 scopus 로고    scopus 로고
    • Chapter 5, Applied multivariate techniques, Wiley, New York, 116-123
    • Sharma, S. (1996). " Factor analysis." Chapter 5, Applied multivariate techniques, Wiley, New York, 116-123.
    • (1996) Factor Analysis
    • Sharma, S.1
  • 33
    • 0000971955 scopus 로고    scopus 로고
    • Project characteristics for successful public-sector design-build
    • 10.1061/(ASCE)0733-9364(1997)123:1(34)
    • Songer, A. D., and, Molenaar, K. R. (1997). " Project characteristics for successful public-sector design-build." J. Constr. Eng. Manage. JCEMD4 0733-9364, 123 (1), 34-40. 10.1061/(ASCE)0733-9364(1997)123: 1(34)
    • (1997) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.123 , Issue.1 , pp. 34-40
    • Songer, A.D.1    Molenaar, K.R.2
  • 34
    • 84873378675 scopus 로고    scopus 로고
    • SPSS 18 [Computer software]. SPSS, Inc. Chicago
    • SPSS 18 [Computer software]. SPSS, Inc., Chicago.
  • 35
    • 44049107957 scopus 로고    scopus 로고
    • Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry
    • 10.1016/j.ijproman.2007.08.003
    • Toor, S. R., and, Ogunlana, S. O. (2008). " Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry." Int. J. Proj. Manage. IPMAEL 0263-7863, 26 (4), 420-430. 10.1016/j.ijproman.2007.08.003
    • (2008) Int. J. Proj. Manage. IPMAEL 0263-7863 , vol.26 , Issue.4 , pp. 420-430
    • Toor, S.R.1    Ogunlana, S.O.2
  • 36
    • 84993047714 scopus 로고    scopus 로고
    • Australian multi-unit residential project construction time performance factors
    • 10.1108/eb021152
    • Walker, D. H. T., and, Vines, M. W. (2000). " Australian multi-unit residential project construction time performance factors." Eng., Constr. Archit. Manage. 0969-9988, 7 (3), 278-284. 10.1108/eb021152
    • (2000) Eng. Constr. Archit. Manage. 0969-9988 , vol.7 , Issue.3 , pp. 278-284
    • Walker, D.H.T.1    Vines, M.W.2
  • 37
    • 15944372664 scopus 로고    scopus 로고
    • Structural equation model of trust and partnering success
    • 10.1061/(ASCE)0742-597X(2005)21:2(70)
    • Wong, P. S. P., and, Cheung, S. O. (2005). " Structural equation model of trust and partnering success." J. Manage. Eng. JMENEA 0742-597X, 21 (2), 70-80. 10.1061/(ASCE)0742-597X(2005)21:2(70)
    • (2005) J. Manage. Eng. JMENEA 0742-597X , vol.21 , Issue.2 , pp. 70-80
    • Wong, P.S.P.1    Cheung, S.O.2
  • 38
    • 33750118745 scopus 로고    scopus 로고
    • Investigation of critical success factors in construction project briefing by way of content analysis
    • 10.1061/(ASCE)0733-9364(2006)132:11(1178)
    • Yu, A. T. W., Shen, Q., Kelly, J., and, Hunter, K. (2006). " Investigation of critical success factors in construction project briefing by way of content analysis." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (11), 1178-1186. 10.1061/(ASCE)0733-9364(2006)132:11(1178)
    • (2006) J. Constr. Eng. Manage. JCEMD4 0733-9364 , vol.132 , Issue.11 , pp. 1178-1186
    • Yu, A.T.W.1    Shen, Q.2    Kelly, J.3    Hunter, K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.