메뉴 건너뛰기




Volumn 135, Issue 11, 2009, Pages 1146-1161

Whole life performance assessment: Critical success factors

Author keywords

Assessment; Bids; Construction management; Contract management; Contracts; Costs; Life cycles

Indexed keywords

ASSESSMENT; BEST PRACTICE; BIDS; COMMON FACTORS; CONSTRUCTION MANAGEMENT; CONSTRUCTION PERIOD; CONSTRUCTION PROCUREMENT; CONSTRUCTION PROJECTS; CONTRACT MANAGEMENT; CRITICAL FACTORS; CRITICAL SUCCESS FACTOR; HEALTH AND SAFETY; HUMAN RESOURCES; INDIVIDUAL FACTORS; LIFE PERFORMANCE; MATERIAL QUALITY; MATRIX; PROJECT BUDGET; PROJECT PARTICIPANTS; PROJECT PHASE; PROJECT SCOPE; PUBLIC SECTOR; QUESTIONNAIRE SURVEYS; RANKING TECHNIQUE; RELATIVE IMPORTANCE; SOUTH KOREA; SPEARMAN'S RANK CORRELATION; WEIGHTED AVERAGE METHOD; WHOLE LIFE COST; WHOLE LIFE COSTING; WORK SAFETY;

EID: 70350241411     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000090     Document Type: Article
Times cited : (79)

References (46)
  • 1
    • 70350220282 scopus 로고    scopus 로고
    • The development of an integrated life cycle costing model using object oriented and VR technologies
    • M. A. Lacasse and D. J. P. O. Vanier, eds., National Research Council of Canada, Vancouver, B.C..
    • Al-Hajj, A. A. G. (1999). " The development of an integrated life cycle costing model using object oriented and VR technologies.." Proc., Information Technology in Construction: CIB W78 Workshop Durability of Building Materials and Components, M. A. Lacasse, and, D. J. P. O. Vanier, eds., National Research Council of Canada, Vancouver, B.C., 2901-2908.
    • (1999) Proc., Information Technology in Construction: CIB W78 Workshop Durability of Building Materials and Components , pp. 2901-2908
    • Al-Hajj, A.A.G.1
  • 2
    • 84927635730 scopus 로고
    • Causes of delay in large building construction projects
    • " 0742-597X, (),. 10.1061/(ASCE)0742-597X(1995)11:2(45)
    • Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M. (1995). " Causes of delay in large building construction projects.." J. Manage. Eng. 0742-597X, 11 (2), 45. 10.1061/(ASCE)0742-597X(1995)11:2(45)
    • (1995) J. Manage. Eng. , vol.11 , Issue.2 , pp. 45
    • Assaf, S.A.1    Al-Khalil, M.2    Al-Hazmi, M.3
  • 3
    • 70350212359 scopus 로고    scopus 로고
    • Providing whole life cost data-Meeting client demands for long term value for money in built assets
    • ", CIB WBC, Wellington, New Zealand, Paper No. 10.
    • Bartlett, E., Waterman, A., and Bourke, K. (2001). " Providing whole life cost data-Meeting client demands for long term value for money in built assets.." Proc., CIB World Building Congress 2001, CIB WBC, Wellington, New Zealand, Paper No. 10, 1-9.
    • (2001) Proc., CIB World Building Congress 2001 , pp. 1-9
    • Bartlett, E.1    Waterman, A.2    Bourke, K.3
  • 4
    • 70350236202 scopus 로고    scopus 로고
    • Reliability and whole life performance: Integrating the supply chain
    • NRC Research, Vancouver.
    • Bartlett, E. V., and Clift, M. (1999). " Reliability and whole life performance: Integrating the supply chain.." Proc., Durability of Building Materials and Components, 8th, NRC Research, Vancouver, 1916-1923.
    • (1999) Proc., Durability of Building Materials and Components, 8th , pp. 1916-1923
    • Bartlett, E.V.1    Clift, M.2
  • 5
    • 32644486991 scopus 로고    scopus 로고
    • Estimating service lives using the factor method for use in whole life costing
    • NRC Research, Vancouver.
    • Bourke, K., and Davies, H. (1999). " Estimating service lives using the factor method for use in whole life costing.." Proc., Durability of Building Materials and Components, 8th, NRC Research, Vancouver, 1518-1526.
    • (1999) Proc., Durability of Building Materials and Components, 8th , pp. 1518-1526
    • Bourke, K.1    Davies, H.2
  • 7
    • 0030287181 scopus 로고    scopus 로고
    • An evaluation of construction time performance in the building industry
    • DOI 10.1016/0360-1323(96)00031-5, PII S0360132396000315
    • Chan, D. W. M., and Kumaraswamy, M. M. (1996). " An evaluation of construction time performance in the building industry.." Build. Environ. 0360-1323, 31 (6), 569-578. 10.1016/0360-1323(96)00031-5 (Pubitemid 126382837)
    • (1996) Building and Environment , vol.31 , Issue.6 , pp. 569-578
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 8
    • 60449084040 scopus 로고    scopus 로고
    • Factors influencing building contractors' pricing for time-related risks in tenders
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(2009)135:3(135)
    • Chan, E. H. W., and Au, M. C. Y. (2009). " Factors influencing building contractors' pricing for time-related risks in tenders.." J. Constr. Eng. Manage. 0733-9364, 135 (3), 135-145. 10.1061/(ASCE)0733-9364(2009) 135:3(135)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 135-145
    • Chan, E.H.W.1    Au, M.C.Y.2
  • 9
    • 0037941781 scopus 로고    scopus 로고
    • A needs-based methodology for classifying construction clients and selecting contractors
    • " 0144-6193, (),. 10.1080/014461998372628
    • Chinyio, E. A., Olomolaiye, P. O., Kometa, S. T., and Harris, F. C. (1998). " A needs-based methodology for classifying construction clients and selecting contractors.." Constr. Manage. Econom. 0144-6193, 16 (1), 91-98. 10.1080/014461998372628
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.1 , pp. 91-98
    • Chinyio, E.A.1    Olomolaiye, P.O.2    Kometa, S.T.3    Harris, F.C.4
  • 12
    • 70350217142 scopus 로고    scopus 로고
    • Client risk factors leading to cost over-run in highway projects
    • 12-14 March 2006, Gold Coast, Australia, 1-14.
    • Creedy, G. (2006). " Client risk factors leading to cost over-run in highway projects.." Second International Conference of the CRC for Construction Innovation, 12-14 March 2006, Gold Coast, Australia, 1-14.
    • (2006) Second International Conference of the CRC for Construction Innovation
    • Creedy, G.1
  • 13
    • 36549061114 scopus 로고    scopus 로고
    • Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity
    • DOI 10.1080/01446190701598681, PII 783079631
    • Dai, J., Goodrum, P. M., and Maloney, W. F. (2007). " Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity.." Constr. Manage. Econom. 0144-6193, 25 (11), 1139-1152. 10.1080/01446190701598681 (Pubitemid 350176766)
    • (2007) Construction Management and Economics , vol.25 , Issue.11 , pp. 1137-1150
    • Dai, J.1    Goodrum, P.M.2    Maloney, W.F.3
  • 14
  • 16
    • 32944469606 scopus 로고    scopus 로고
    • Comparing procurement methods for design-build projects
    • DOI 10.1061/(ASCE)0733-9364(2006)132:3(230)
    • El Wardani, M. A., Messner, J. I., and Horman, M. J. (2006). " Comparing procurement methods for design-build projects.." J. Constr. Eng. Manage. 0733-9364, 132 (3), 230-238. 10.1061/(ASCE)0733-9364(2006)132:3(230) (Pubitemid 43260123)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 230-238
    • El Wardani, M.A.1    Messner, J.I.2    Horman, M.J.3
  • 17
    • 70350236201 scopus 로고    scopus 로고
    • Managing risk for an uncertain future-A project management perspective
    • Research Centre for Construction and Real Estate Economics, Hong Kong.
    • Flanagan, R. (2002). " Managing risk for an uncertain future-A project management perspective.." Proc., Project Management-Impresario of the Construction Industry Symp., Research Centre for Construction and Real Estate Economics, Hong Kong, 22-32.
    • (2002) Proc., Project Management-Impresario of the Construction Industry Symp. , pp. 22-32
    • Flanagan, R.1
  • 22
    • 33751183766 scopus 로고    scopus 로고
    • Analysing cutomer satisfaction and quality in construction-the case of public and private customers
    • Karna, S. (2004). " Analysing cutomer satisfaction and quality in construction-the case of public and private customers.." Nordic Journal of Surveying and Real Estate Research, 2, 67-80.
    • (2004) Nordic Journal of Surveying and Real Estate Research , vol.2 , pp. 67-80
    • Karna, S.1
  • 23
    • 0035426616 scopus 로고    scopus 로고
    • Risk and its management in the Kuwaiti construction industry: A contractors' perspective
    • DOI 10.1016/S0263-7863(00)00014-4, PII S0263786300000144
    • Kartam, N. A., and Kartam, S. A. (2001). " Risk and its management in the Kuwaiti construction industry: A contractors' perspective.." Int. J. Proj. Manage. 0263-7863, 19, 325-335. 10.1016/S0263-7863(00)00014-4 (Pubitemid 32646672)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 325-335
    • Kartam, N.A.1    Kartam, S.A.2
  • 24
    • 0042123819 scopus 로고    scopus 로고
    • A model for smoothing time-series data in construction
    • DOI 10.1080/0144619032000073541
    • Khosrowshahi, F., and Alani, A. M. (2003). " A model for smoothing time-series data in construction.." Constr. Manage. Econom. 0144-6193, 21 (5), 483-494. 10.1080/0144619032000073541 (Pubitemid 36967871)
    • (2003) Construction Management and Economics , vol.21 , Issue.5 , pp. 483-494
    • Khosrowshahi, F.1    Alani, A.M.2
  • 25
    • 13944250668 scopus 로고    scopus 로고
    • Re-engineering the whole life cycle costing process
    • DOI 10.1080/01446190410001678765
    • Kirkham, R. (2005). " Re-engineering the whole life cycle costing process.." Constr. Manage. Econom. 0144-6193, 23 (1), 9-14. 10.1080/01446190410001678765 (Pubitemid 40273708)
    • (2005) Construction Management and Economics , vol.23 , Issue.1 , pp. 9-14
    • Kirkham, R.J.1
  • 26
    • 84874995285 scopus 로고
    • An evaluation of clients' needs and responsibilities in the construction process
    • " 0969-9988.
    • Kometa, S. T., Olomolaiye, P. O., and Harris, F. C. (1995). " An evaluation of clients' needs and responsibilities in the construction process.." Eng., Constr., Archit. Manage. 0969-9988, 2 (1), 57-76.
    • (1995) Eng., Constr., Archit. Manage. , vol.2 , Issue.1 , pp. 57-76
    • Kometa, S.T.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 27
    • 70350221607 scopus 로고    scopus 로고
    • Korean National Statistics Office.., National Statistics Office, Seoul.
    • Korean National Statistics Office. (2008). Korea statistics yearbook, National Statistics Office, Seoul.
    • (2008) Korea Statistics Yearbook
  • 29
    • 70350214171 scopus 로고    scopus 로고
    • Analysis of present ordering condition of turn-key contract for civil engineering projects
    • ", Korean Society of Civil Engineers, Seoul.
    • Lee, Y. -k., Kang, L. -S., Kim, C. -H., and Park, J. -H. (2006). " Analysis of present ordering condition of turn-key contract for civil engineering projects.." Proc., KSCE Conf. and Civil Expo, Korean Society of Civil Engineers, Seoul, 950-953.
    • (2006) Proc., KSCE Conf. and Civil Expo , pp. 950-953
    • Lee, Y.-K.1    Kang, L.-S.2    Kim, C.-H.3    Park, J.-H.4
  • 30
    • 30844439150 scopus 로고    scopus 로고
    • Determinants of international architectural, engineering, and construction firms' project success in China
    • " 0733-9364.
    • Ling, F. Y. Y., Ibbs, C. W., and Hoo, W. Y. (2006). " Determinants of international architectural, engineering, and construction firms' project success in China.." J. Constr. Eng. Manage. 0733-9364, 132, 206-214.
    • (2006) J. Constr. Eng. Manage. , vol.132 , pp. 206-214
    • Ling, F.Y.Y.1    Ibbs, C.W.2    Hoo, W.Y.3
  • 31
    • 70350229934 scopus 로고    scopus 로고
    • Topped by cross-winds, tugged at by sinuous undercurrents: E-learning organizational critical success factors as identified by HE practitioners
    • Association for Learning Technology., U.K..
    • McPherson, M., and Nunes, M. B. (2006). " Topped by cross-winds, tugged at by sinuous undercurrents: E-learning organizational critical success factors as identified by HE practitioners.." Proc., ALT-C 2006 Research, Association for Learning Technology., U.K., 70-80.
    • (2006) Proc., ALT-C 2006 Research , pp. 70-80
    • McPherson, M.1    Nunes, M.B.2
  • 32
    • 2342437726 scopus 로고    scopus 로고
    • Whole life appraisal of the repair and improvement work costs of Post Office buildings in Japan
    • DOI 10.1080/0144619032000108254
    • Minami, K. (2004). " Whole life appraisal of the repair and improvement work costs of post office buildings in Japan.." Constr. Manage. Econom. 0144-6193, 22 (3), 311-318. 10.1080/0144619032000108254 (Pubitemid 38562535)
    • (2004) Construction Management and Economics , vol.22 , Issue.3 , pp. 311-318
    • Minami, K.1
  • 33
    • 0034394634 scopus 로고    scopus 로고
    • Greening the construction supply chain in Singapore
    • 10.1016/S0969-7012(00)00015-0
    • Ofori, G. (2000). " Greening the construction supply chain in Singapore.." European Journal of Purchasing & Supply Management, 6, 195-206. 10.1016/S0969-7012(00)00015-0
    • (2000) European Journal of Purchasing & Supply Management , vol.6 , pp. 195-206
    • Ofori, G.1
  • 34
    • 33645127062 scopus 로고    scopus 로고
    • Time-cost model for building projects in Nigeria
    • 0144-6193, (),. 10.1080/01446190500521041
    • Ogunsemi, D. R., and Jagboro, G. O. (2006). " Time-cost model for building projects in Nigeria.." Constr. Manage. Econom. 0144-6193, 24 (3), 253-258. 10.1080/01446190500521041
    • (2006) Constr. Manage. Econom. , vol.24 , Issue.3 , pp. 253-258
    • Ogunsemi, D.R.1    Jagboro, G.O.2
  • 35
    • 3242715742 scopus 로고    scopus 로고
    • Modelling the determinants of multi-firm project success: A grounded exploration of differing participant perspectives
    • DOI 10.1080/0144619042000190243
    • Phua, F. T. T. (2004). " Modelling the determinants of multi-firm project success: A grounded exploration of differing participant perspectives.." Constr. Manage. Econom. 0144-6193, 22, 451-459. 10.1080/0144619042000190243 (Pubitemid 38958153)
    • (2004) Construction Management and Economics , vol.22 , Issue.5 , pp. 451-459
    • Phua, F.T.T.1
  • 37
    • 0018451997 scopus 로고
    • Chief executives define their own data needs
    • 0017-8012.
    • Rockhart, J. F. (1979). " Chief executives define their own data needs.." Harvard Bus. Rev. 0017-8012, 57, 81-93.
    • (1979) Harvard Bus. Rev. , vol.57 , pp. 81-93
    • Rockhart, J.F.1
  • 39
    • 0003925331 scopus 로고    scopus 로고
    • Continuous assessment of project performance
    • " 0733-9364, (),. 10.1061/(ASCE)0733-9364(1997)123:1(64)
    • Russell, J. S., Jaselskis, E. J., and Lawrence, S. P. (1997). " Continuous assessment of project performance.." J. Constr. Eng. Manage. 0733-9364, 123 (1), 64-71. 10.1061/(ASCE)0733-9364(1997)123:1(64)
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 64-71
    • Russell, J.S.1    Jaselskis, E.J.2    Lawrence, S.P.3
  • 40
    • 0000643379 scopus 로고
    • Factors considered in tendering decisions by top UK contractors
    • 0144-6193, (),. 10.1080/01446199300000004
    • Shash, A. (1993). " Factors considered in tendering decisions by top UK contractors.." Constr. Manage. Econom. 0144-6193, 11 (2), 111-118. 10.1080/01446199300000004
    • (1993) Constr. Manage. Econom. , vol.11 , Issue.2 , pp. 111-118
    • Shash, A.1
  • 41
    • 84992985891 scopus 로고    scopus 로고
    • Modelling the satisfaction of contractors: The impact of client performance
    • 10.1046/j.1365-232X.2002.00278.x 0969-9988
    • Soetanto, R., and Proverbs, D. G. (2002). " Modelling the satisfaction of contractors: The impact of client performance.." Eng. Constr. Archit. Manage., 9 (5-6), 453-465. 10.1046/j.1365-232X.2002.00278.x 0969-9988
    • (2002) Eng. Constr. Archit. Manage. , vol.9 , Issue.56 , pp. 453-465
    • Soetanto, R.1    Proverbs, D.G.2
  • 42
    • 0037410976 scopus 로고    scopus 로고
    • Making the link: Climate policy and the reform of the UK construction industry
    • DOI 10.1016/S0301-4215(02)00130-1, PII S0301421502001301
    • Sorrell, S. (2003). " Making the link: Climate policy and the reform of the UK construction industry.." Energy Policy 0301-4215, 31 (9), 865-878. 10.1016/S0301-4215(02)00130-1 (Pubitemid 36339743)
    • (2003) Energy Policy , vol.31 , Issue.9 , pp. 865-878
    • Sorrell, S.1
  • 43
    • 84986166631 scopus 로고    scopus 로고
    • Critical success factors for quality management implementation in Russia
    • 10.1108/00197850210447255
    • Khoo, H. H., and Tan, K. C. (2002). " Critical success factors for quality management implementation in Russia.." Industrial and Commercial Training, 34 (7), 263-268. 10.1108/00197850210447255
    • (2002) Industrial and Commercial Training , vol.34 , Issue.7 , pp. 263-268
    • Khoo, H.H.1    Tan, K.C.2
  • 44
    • 70350231343 scopus 로고    scopus 로고
    • Evaluation of pre-qualification criteria: Client perspective; Jordan case study
    • 1812-5654, (),. 10.3923/jas.2004.354.363
    • Tarawneh, S. A. (2004). " Evaluation of pre-qualification criteria: Client perspective; Jordan case study.." J. Appl. Sci. 1812-5654, 4 (3), 354-363. 10.3923/jas.2004.354.363
    • (2004) J. Appl. Sci. , vol.4 , Issue.3 , pp. 354-363
    • Tarawneh, S.A.1
  • 45
    • 84903985448 scopus 로고    scopus 로고
    • Critical success factors for project performance; A study from front-end assessments of large public projects in Norway
    • ", Concepts Reports, Norway.
    • Torp, O., Austeng, K., and Mengesha, W. J. (2004). " Critical success factors for project performance; a study from front-end assessments of large public projects in Norway.." Proc., Nordnet 2004 Conf., Concepts Reports, Norway, 1-5.
    • (2004) Proc., Nordnet 2004 Conf. , pp. 1-5
    • Torp, O.1    Austeng, K.2    Mengesha, W.J.3
  • 46
    • 16444384169 scopus 로고    scopus 로고
    • Time-dependent construction social costs model
    • DOI 10.1080/01446190500040281
    • Yu, W. -D., and Lo, S. -S. (2005). " Time-dependent construction social costs model.." Constr. Manage. Econom. 0144-6193, 23 (3), 327-337. 10.1080/01446190500040281 (Pubitemid 40479062)
    • (2005) Construction Management and Economics , vol.23 , Issue.3 , pp. 327-337
    • Yu, W.-D.1    Lo, S.-S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.