메뉴 건너뛰기




Volumn 130, Issue 1, 2004, Pages 75-83

Predicting performance of design-build and design-bid-build projects

Author keywords

Design build; Models; Performance evaluation; Project management

Indexed keywords

CONTRACTORS; DESIGN/BUILD; PERFORMANCE EVALUATION; SAFETY MANAGEMENT;

EID: 2142774401     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:1(75)     Document Type: Article
Times cited : (182)

References (12)
  • 2
    • 84860077941 scopus 로고    scopus 로고
    • Singapore building and construction authority home page
    • Apr. 19, 2002
    • Building and Construction Authority (BCA). (2002). "Singapore building and construction authority home page." Building and Construction Authority, 〈http://www.bca.gov.sg〉 (Apr. 19, 2002).
    • (2002) Building and Construction Authority
  • 3
    • 0035280018 scopus 로고    scopus 로고
    • Design and build project success factors: Multivariate analysis
    • Chan, A. P. C., Ho, D. C. K., and Tam, C. M. (2001). "Design and build project success factors: Multivariate analysis." J. Constr. Eng. Manage., 127(2), 93-100.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.2 , pp. 93-100
    • Chan, A.P.C.1    Ho, D.C.K.2    Tam, C.M.3
  • 6
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1997). "Factors influencing construction time and cost overruns on high-rise projects in Indonesia." Constr. Manage. Econom., 15(1), 82-94.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.1 , pp. 82-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 7
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. project delivery systems
    • Konchar, M., and Sanvido, V. (1998). "Comparison of U.S. project delivery systems." J. Constr. Eng. Manage., 124(6), 435-444.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 8
    • 0000896765 scopus 로고
    • Determinants of construction duration
    • Kumaraswamy, M. M., and Chan, W. M. (1995). "Determinants of construction duration." Constr. Manage. Econom., 13(2), 209-217.
    • (1995) Constr. Manage. Econom. , vol.13 , Issue.2 , pp. 209-217
    • Kumaraswamy, M.M.1    Chan, W.M.2
  • 9
    • 0000610842 scopus 로고
    • Determinants of performance in the traditional building process
    • Mohsini, R. A., and Davidson, C. H. (1992). "Determinants of performance in the traditional building process." Constr. Manage. Econom., 10(4), 343-359.
    • (1992) Constr. Manage. Econom. , vol.10 , Issue.4 , pp. 343-359
    • Mohsini, R.A.1    Davidson, C.H.2
  • 10
    • 0032208060 scopus 로고    scopus 로고
    • Model for public sector design-build project selection
    • Molenaar, K. R., and Songer, A. D. (1998). "Model for public sector design-build project selection." J. Constr. Eng. Manage., 124(6), 467-479.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 467-479
    • Molenaar, K.R.1    Songer, A.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.