-
2
-
-
0036680985
-
Selecting the appropriate project delivery method using AHP
-
IPMAEL 10.1016/S0263-7863(01)00032-1
-
Al Khalil, M. I. (2002). " Selecting the appropriate project delivery method using AHP." Int. J. Proj. Manage., 20 (6), 469-474. IPMAEL 10.1016/S0263-7863(01)00032-1
-
(2002)
Int. J. Proj. Manage.
, vol.20
, Issue.6
, pp. 469-474
-
-
Al Khalil, M.I.1
-
3
-
-
29244459839
-
-
American Institute of Architects and Associated General Contractors of America (AIA-AGC). American Institute of Architects, Associated General Contractors of America, Washington, DC, and Alexandria, VA
-
American Institute of Architects and Associated General Contractors of America (AIA-AGC). (2004). Primer on project delivery, American Institute of Architects, Associated General Contractors of America, Washington, DC, and Alexandria, VA.
-
(2004)
Primer on Project Delivery
-
-
-
4
-
-
0026851280
-
Owner involvement in construction projects in Saudi Arabia
-
JMENEA 0742-597X 10.1061/(ASCE)9742-597X(1992)8:2(176)
-
Bubshait, A., and, Al-Musaid, A. (1992). " Owner involvement in construction projects in Saudi Arabia." J. Manage. Eng., 8 (2), 176-185. JMENEA 0742-597X 10.1061/(ASCE)9742-597X(1992)8:2(176)
-
(1992)
J. Manage. Eng.
, vol.8
, Issue.2
, pp. 176-185
-
-
Bubshait, A.1
Al-Musaid, A.2
-
5
-
-
84872740405
-
-
Construction Industry Institute (CII) (Sep. 22, 2011)
-
Construction Industry Institute (CII). (2005). " Performance metrics, formulas, and definitions." http://construction-institute.org/ scriptcontent/toolkit/Metrics-Definitions-04012005.pdf (Sep. 22, 2011).
-
(2005)
Performance Metrics, Formulas, and Definitions
-
-
-
6
-
-
84872726108
-
-
Dept. of Energy (DOE) (Oct. 5, 2009)
-
Dept. of Energy (DOE). (2009). " High performance buildings database." http://www.energy.gov/energyefficiency/buildings.htm (Oct. 5, 2009).
-
(2009)
High Performance Buildings Database
-
-
-
7
-
-
0034225748
-
Partnering: Why project owner-contractor relationships change
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2000)126:4(293)
-
Drexler, J., and, Larson, E. (2000). " Partnering: Why project owner-contractor relationships change." J. Constr. Eng. Manage., 126 (4), 293-297. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2000)126:4(293)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 293-297
-
-
Drexler, J.1
Larson, E.2
-
8
-
-
69949090822
-
-
Construction Research Congress, ASCE, Reston, VA
-
Enache-Pommer, E., and, Horman, M. (2009). " Key processes in the building delivery of green hospitals." Construction Research Congress, ASCE, Reston, VA, 636-645.
-
(2009)
Key Processes in the Building Delivery of Green Hospitals
, pp. 636-645
-
-
Enache-Pommer, E.1
Horman, M.2
-
9
-
-
0029753326
-
Achieving industrial facility quality: Integration is key
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1996)12:1(49)
-
Fergusson, K. J., and, Teicholz, P. M. (1996). " Achieving industrial facility quality: Integration is key." J. Manage. Eng., 12 (1), 49-56. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1996)12:1(49)
-
(1996)
J. Manage. Eng.
, vol.12
, Issue.1
, pp. 49-56
-
-
Fergusson, K.J.1
Teicholz, P.M.2
-
11
-
-
0043117245
-
-
Government Accounting Office (GAO). Rep. GAO/PEMD-10.1.5, Program Evaluation Methodology Division, Washington, DC
-
Government Accounting Office (GAO). (1991). " Using structured interviewing techniques." Rep. GAO/PEMD-10.1.5, Program Evaluation Methodology Division, Washington, DC.
-
(1991)
Using Structured Interviewing Techniques
-
-
-
12
-
-
84872739014
-
-
AACE International, Morgantown, WV
-
Gransberg, D. D., and, Buitrago, M. E. V. (2002). Construction project performance metrics, AACE International, Morgantown, WV.
-
(2002)
Construction Project Performance Metrics
-
-
Gransberg, D.D.1
Buitrago, M.E.V.2
-
13
-
-
79960424677
-
-
Green Globes Oct. 5, 2009
-
Green Globes. (2009). " Case studies." http://www.greenglobes. com/casestudies.asp (Oct. 5, 2009).
-
(2009)
Case Studies
-
-
-
14
-
-
13944260870
-
Project delivery systems and project change: Quantitative analysis
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2003)129:4(382)
-
Ibbs, C., Kwak, Y., Ng, T., and, Odabasi, A. (2003). " Project delivery systems and project change: Quantitative analysis." J. Constr. Eng. Manage., 129 (4), 382-387. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2003) 129:4(382)
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 382-387
-
-
Ibbs, C.1
Kwak, Y.2
Ng, T.3
Odabasi, A.4
-
15
-
-
77955316224
-
-
Integrated Project Delivery (IPD) (Oct. 5, 2009)
-
Integrated Project Delivery (IPD). (2009). " Integrated project delivery: A guide." http://www.aia.org/contractdocs/AIAS077630 (Oct. 5, 2009).
-
(2009)
Integrated Project Delivery: A Guide
-
-
-
16
-
-
0032207592
-
Comparison of United States project delivery systems
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1998)124:6(435)
-
Konchar, M., and, Sanvido, V. (1998). " Comparison of United States project delivery systems." J. Constr. Eng. Manage., 124 (6), 435-444. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1998)124:6(435)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
17
-
-
77955327823
-
Piloting evaluation metrics for sustainable, high performance building project delivery
-
JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000195
-
Korkmaz, S., Riley, D., and, Horman, M. (2010). " Piloting evaluation metrics for sustainable, high performance building project delivery." J. Constr. Eng. Manage., 136 (8), 877-885. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000195
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.8
, pp. 877-885
-
-
Korkmaz, S.1
Riley, D.2
Horman, M.3
-
18
-
-
33748796091
-
Lean processes for sustainable project delivery
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:10(1083)
-
Lapinski, A., Horman, M., and, Riley, D. (2006). " Lean processes for sustainable project delivery." J. Constr. Eng. Manage., 132 (10), 1083-1091. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:10(1083)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.10
, pp. 1083-1091
-
-
Lapinski, A.1
Horman, M.2
Riley, D.3
-
19
-
-
84862945816
-
Critical project management factors of AEC firms for delivering green building projects in Singapore
-
JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000370
-
Li, Y. Y., Chen, P., Chew, D. A. S., Teo, C. C., and, Ding, R. G. (2011). " Critical project management factors of AEC firms for delivering green building projects in Singapore." J. Constr. Eng. Manage., 137 (12), 1153-1163. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000370
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.12
, pp. 1153-1163
-
-
Li, Y.Y.1
Chen, P.2
Chew, D.A.S.3
Teo, C.C.4
Ding, R.G.5
-
20
-
-
73849101441
-
A design process evaluation method for sustainable buildings
-
1745-2007, 10.3763/aedm.2009.0907
-
Magent, C., Korkmaz, S., Klotz, L., and, Riley, D. (2009). " A design process evaluation method for sustainable buildings." Archit. Eng. Design Manage. 1745-2007, 5 (1-2), 62-74. 10.3763/aedm.2009.0907
-
(2009)
Archit. Eng. Design Manage.
, vol.5
, Issue.12
, pp. 62-74
-
-
Magent, C.1
Korkmaz, S.2
Klotz, L.3
Riley, D.4
-
21
-
-
79251511476
-
-
Rep. to the Charles Pankow Foundation, Claremont, CA
-
Molenaar, K. R., Sobin, N., Gransberg, D. G., McCuen, T., Korkmaz, S., and, Horman, M. (2009). " Sustainable, high performance projects and project delivery methods: A state-of-practice report." Rep. to the Charles Pankow Foundation, Claremont, CA.
-
(2009)
Sustainable, High Performance Projects and Project Delivery Methods: A State-of-practice Report
-
-
Molenaar, K.R.1
Sobin, N.2
Gransberg, D.G.3
McCuen, T.4
Korkmaz, S.5
Horman, M.6
-
22
-
-
78649233013
-
The integrated project team: Team working and partnering
-
Office of Government Commerce (OGC) Office of Government Commerce, London, UK
-
Office of Government Commerce (OGC). (2005). " The integrated project team: Team working and partnering." Achieving excellence in construction procurement guide 05, Office of Government Commerce, London, UK.
-
(2005)
Achieving Excellence in Construction Procurement Guide 05
-
-
-
23
-
-
84855924269
-
-
Rep. to the Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
Oyetunji, A., and, Anderson, S. (2001). " Project delivery and contract strategy." Rep. to the Construction Industry Institute, Univ. of Texas at Austin, Austin, TX.
-
(2001)
Project Delivery and Contract Strategy
-
-
Oyetunji, A.1
Anderson, S.2
-
24
-
-
0005474505
-
Impact of management approach on project interaction and performance
-
(a). JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1997)123:4(411)
-
Pocock, J., Liu, L. Y., and, Kim, M. K. (1997 a). " Impact of management approach on project interaction and performance." J. Constr. Eng. Manage., 123 (4), 411-418. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1997) 123:4(411)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.4
, pp. 411-418
-
-
Pocock, J.1
Liu, L.Y.2
Kim, M.K.3
-
25
-
-
0031103107
-
Prediction of project performance based on degree of interaction
-
(b). JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1997)13:2(63)
-
Pocock, J., Liu, L. Y., and, Tang, W. H. (1997 b). " Prediction of project performance based on degree of interaction." J. Manage. Eng., 13 (2), 63-76. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1997)13:2(63)
-
(1997)
J. Manage. Eng.
, vol.13
, Issue.2
, pp. 63-76
-
-
Pocock, J.1
Liu, L.Y.2
Tang, W.H.3
-
26
-
-
78650330073
-
Green project management practices for sustainable construction
-
JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000030
-
Robichaud, L. B., and, Anantatmula, V. S. (2011). " Green project management practices for sustainable construction." J. Manage. Eng., 27 (1), 48-57. JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000030
-
(2011)
J. Manage. Eng.
, vol.27
, Issue.1
, pp. 48-57
-
-
Robichaud, L.B.1
Anantatmula, V.S.2
-
27
-
-
58149247681
-
Early contractor involvement in design and its impact on construction schedule performance
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:1(12)
-
Song, L., Mohamed, Y., and, AbouRizk, S. M. (2009). " Early contractor involvement in design and its impact on construction schedule performance." J. Manage. Eng., 25 (1), 12-20. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:1(12)
-
(2009)
J. Manage. Eng.
, vol.25
, Issue.1
, pp. 12-20
-
-
Song, L.1
Mohamed, Y.2
Abourizk, S.M.3
-
28
-
-
84855913313
-
Project delivery metrics for sustainable, high-performance buildings
-
JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000379
-
Swarup, L., Korkmaz, S., and, Riley, D. (2011). " Project delivery metrics for sustainable, high-performance buildings." J. Constr. Eng. Manage., 137 (12), 1043-1051. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862. 0000379
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.12
, pp. 1043-1051
-
-
Swarup, L.1
Korkmaz, S.2
Riley, D.3
-
29
-
-
79955460590
-
Meeting the burden of proof with case study research
-
JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000283
-
Taylor, J. E., Dossick, J. S., and, Garvin, M. (2011). " Meeting the burden of proof with case study research." J. Constr. Eng. Manage., 137 (4), 303-311. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000283
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.4
, pp. 303-311
-
-
Taylor, J.E.1
Dossick, J.S.2
Garvin, M.3
-
30
-
-
78650388363
-
Selection of project delivery method in transit: Drivers and objectives
-
JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000027
-
Touran, A., Gransberg, D. D., Molenaar, K. R., and, Ghavamifar, K. (2011). " Selection of project delivery method in transit: Drivers and objectives." J. Manage. Eng., 27 (1), 21-27. JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000027
-
(2011)
J. Manage. Eng.
, vol.27
, Issue.1
, pp. 21-27
-
-
Touran, A.1
Gransberg, D.D.2
Molenaar, K.R.3
Ghavamifar, K.4
-
31
-
-
64549115173
-
-
Final Rep. Prepared for the U.S. Green Building Council, Washington, DC
-
Turner, C., and, Frankel, M. (2008). " Energy performance of LEED for new construction buildings." Final Rep. Prepared for the U.S. Green Building Council, Washington, DC.
-
(2008)
Energy Performance of LEED for New Construction Buildings
-
-
Turner, C.1
Frankel, M.2
-
32
-
-
84857028428
-
-
U.S. Green Building Council (USGBC) Oct. 5, 2009
-
U.S. Green Building Council (USGBC). (2009). " LEED projects and case studies directory." http://www.usgbc.org/LEED/Project/ CertifiedProjectList.aspx (Oct. 5, 2009).
-
(2009)
LEED Projects and Case Studies Directory
-
-
-
33
-
-
84872691380
-
-
U.S. Green Building Council (USGBC) May 2, 2010
-
U.S. Green Building Council (USGBC). (2010). " About." http://www.usgbc.org/DisplayPage.aspx?CMSPageID=124 (May 2, 2010).
-
(2010)
About
-
-
-
34
-
-
84872701491
-
-
Proc. Symp. on Design for the Global Environment, Atlanta, GA, Nov. 2-4
-
Vanegas, J. A., DuBose, J. R., and, Pearce, A. R. (1996). " Sustainable technologies for the building construction industries." Proc., Symp. on Design for the Global Environment, Atlanta, GA, Nov. 2-4.
-
(1996)
Sustainable Technologies for the Building Construction Industries
-
-
Vanegas, J.A.1
Dubose, J.R.2
Pearce, A.R.3
-
35
-
-
84872710736
-
-
Whole Building Design Guide (WBDG) (Oct. 3, 2009)
-
Whole Building Design Guide (WBDG). (2009). " Engage the integrated design process." http://www.wbdg.org/design/engage-process.php (Oct. 3, 2009).
-
(2009)
Engage the Integrated Design Process
-
-
|