메뉴 건너뛰기




Volumn 29, Issue 1, 2013, Pages 71-78

Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes

Author keywords

Buildings; Construction industry; Delivery; Project management; Sustainable development

Indexed keywords

CONSTRUCTION MANAGEMENT AT RISK; DELIVERY; DELIVERY PROCESS; DESIGN BUILD; ENERGY COST; ENERGY STRATEGY; IN-BUILDINGS; INDOOR ENVIRONMENTAL QUALITY; PROJECT DELIVERY METHOD; PROJECT OUTCOMES; PROJECT SUCCESS; PROJECT SUSTAINABILITY; PROJECT TEAM; SUSTAINABLE BUILDING; TEAM INTEGRATION; WELL BEING;

EID: 84872731494     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000114     Document Type: Article
Times cited : (168)

References (36)
  • 2
    • 0036680985 scopus 로고    scopus 로고
    • Selecting the appropriate project delivery method using AHP
    • IPMAEL 10.1016/S0263-7863(01)00032-1
    • Al Khalil, M. I. (2002). " Selecting the appropriate project delivery method using AHP." Int. J. Proj. Manage., 20 (6), 469-474. IPMAEL 10.1016/S0263-7863(01)00032-1
    • (2002) Int. J. Proj. Manage. , vol.20 , Issue.6 , pp. 469-474
    • Al Khalil, M.I.1
  • 3
    • 29244459839 scopus 로고    scopus 로고
    • American Institute of Architects and Associated General Contractors of America (AIA-AGC). American Institute of Architects, Associated General Contractors of America, Washington, DC, and Alexandria, VA
    • American Institute of Architects and Associated General Contractors of America (AIA-AGC). (2004). Primer on project delivery, American Institute of Architects, Associated General Contractors of America, Washington, DC, and Alexandria, VA.
    • (2004) Primer on Project Delivery
  • 4
    • 0026851280 scopus 로고
    • Owner involvement in construction projects in Saudi Arabia
    • JMENEA 0742-597X 10.1061/(ASCE)9742-597X(1992)8:2(176)
    • Bubshait, A., and, Al-Musaid, A. (1992). " Owner involvement in construction projects in Saudi Arabia." J. Manage. Eng., 8 (2), 176-185. JMENEA 0742-597X 10.1061/(ASCE)9742-597X(1992)8:2(176)
    • (1992) J. Manage. Eng. , vol.8 , Issue.2 , pp. 176-185
    • Bubshait, A.1    Al-Musaid, A.2
  • 5
    • 84872740405 scopus 로고    scopus 로고
    • Construction Industry Institute (CII) (Sep. 22, 2011)
    • Construction Industry Institute (CII). (2005). " Performance metrics, formulas, and definitions." http://construction-institute.org/ scriptcontent/toolkit/Metrics-Definitions-04012005.pdf (Sep. 22, 2011).
    • (2005) Performance Metrics, Formulas, and Definitions
  • 6
    • 84872726108 scopus 로고    scopus 로고
    • Dept. of Energy (DOE) (Oct. 5, 2009)
    • Dept. of Energy (DOE). (2009). " High performance buildings database." http://www.energy.gov/energyefficiency/buildings.htm (Oct. 5, 2009).
    • (2009) High Performance Buildings Database
  • 7
    • 0034225748 scopus 로고    scopus 로고
    • Partnering: Why project owner-contractor relationships change
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2000)126:4(293)
    • Drexler, J., and, Larson, E. (2000). " Partnering: Why project owner-contractor relationships change." J. Constr. Eng. Manage., 126 (4), 293-297. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2000)126:4(293)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 293-297
    • Drexler, J.1    Larson, E.2
  • 9
    • 0029753326 scopus 로고    scopus 로고
    • Achieving industrial facility quality: Integration is key
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1996)12:1(49)
    • Fergusson, K. J., and, Teicholz, P. M. (1996). " Achieving industrial facility quality: Integration is key." J. Manage. Eng., 12 (1), 49-56. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1996)12:1(49)
    • (1996) J. Manage. Eng. , vol.12 , Issue.1 , pp. 49-56
    • Fergusson, K.J.1    Teicholz, P.M.2
  • 11
    • 0043117245 scopus 로고
    • Government Accounting Office (GAO). Rep. GAO/PEMD-10.1.5, Program Evaluation Methodology Division, Washington, DC
    • Government Accounting Office (GAO). (1991). " Using structured interviewing techniques." Rep. GAO/PEMD-10.1.5, Program Evaluation Methodology Division, Washington, DC.
    • (1991) Using Structured Interviewing Techniques
  • 13
    • 79960424677 scopus 로고    scopus 로고
    • Green Globes Oct. 5, 2009
    • Green Globes. (2009). " Case studies." http://www.greenglobes. com/casestudies.asp (Oct. 5, 2009).
    • (2009) Case Studies
  • 14
    • 13944260870 scopus 로고    scopus 로고
    • Project delivery systems and project change: Quantitative analysis
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2003)129:4(382)
    • Ibbs, C., Kwak, Y., Ng, T., and, Odabasi, A. (2003). " Project delivery systems and project change: Quantitative analysis." J. Constr. Eng. Manage., 129 (4), 382-387. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2003) 129:4(382)
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 382-387
    • Ibbs, C.1    Kwak, Y.2    Ng, T.3    Odabasi, A.4
  • 15
    • 77955316224 scopus 로고    scopus 로고
    • Integrated Project Delivery (IPD) (Oct. 5, 2009)
    • Integrated Project Delivery (IPD). (2009). " Integrated project delivery: A guide." http://www.aia.org/contractdocs/AIAS077630 (Oct. 5, 2009).
    • (2009) Integrated Project Delivery: A Guide
  • 16
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of United States project delivery systems
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1998)124:6(435)
    • Konchar, M., and, Sanvido, V. (1998). " Comparison of United States project delivery systems." J. Constr. Eng. Manage., 124 (6), 435-444. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1998)124:6(435)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 17
    • 77955327823 scopus 로고    scopus 로고
    • Piloting evaluation metrics for sustainable, high performance building project delivery
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000195
    • Korkmaz, S., Riley, D., and, Horman, M. (2010). " Piloting evaluation metrics for sustainable, high performance building project delivery." J. Constr. Eng. Manage., 136 (8), 877-885. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000195
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.8 , pp. 877-885
    • Korkmaz, S.1    Riley, D.2    Horman, M.3
  • 18
    • 33748796091 scopus 로고    scopus 로고
    • Lean processes for sustainable project delivery
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:10(1083)
    • Lapinski, A., Horman, M., and, Riley, D. (2006). " Lean processes for sustainable project delivery." J. Constr. Eng. Manage., 132 (10), 1083-1091. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:10(1083)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.10 , pp. 1083-1091
    • Lapinski, A.1    Horman, M.2    Riley, D.3
  • 19
    • 84862945816 scopus 로고    scopus 로고
    • Critical project management factors of AEC firms for delivering green building projects in Singapore
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000370
    • Li, Y. Y., Chen, P., Chew, D. A. S., Teo, C. C., and, Ding, R. G. (2011). " Critical project management factors of AEC firms for delivering green building projects in Singapore." J. Constr. Eng. Manage., 137 (12), 1153-1163. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000370
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.12 , pp. 1153-1163
    • Li, Y.Y.1    Chen, P.2    Chew, D.A.S.3    Teo, C.C.4    Ding, R.G.5
  • 20
    • 73849101441 scopus 로고    scopus 로고
    • A design process evaluation method for sustainable buildings
    • 1745-2007, 10.3763/aedm.2009.0907
    • Magent, C., Korkmaz, S., Klotz, L., and, Riley, D. (2009). " A design process evaluation method for sustainable buildings." Archit. Eng. Design Manage. 1745-2007, 5 (1-2), 62-74. 10.3763/aedm.2009.0907
    • (2009) Archit. Eng. Design Manage. , vol.5 , Issue.12 , pp. 62-74
    • Magent, C.1    Korkmaz, S.2    Klotz, L.3    Riley, D.4
  • 22
    • 78649233013 scopus 로고    scopus 로고
    • The integrated project team: Team working and partnering
    • Office of Government Commerce (OGC) Office of Government Commerce, London, UK
    • Office of Government Commerce (OGC). (2005). " The integrated project team: Team working and partnering." Achieving excellence in construction procurement guide 05, Office of Government Commerce, London, UK.
    • (2005) Achieving Excellence in Construction Procurement Guide 05
  • 23
    • 84855924269 scopus 로고    scopus 로고
    • Rep. to the Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • Oyetunji, A., and, Anderson, S. (2001). " Project delivery and contract strategy." Rep. to the Construction Industry Institute, Univ. of Texas at Austin, Austin, TX.
    • (2001) Project Delivery and Contract Strategy
    • Oyetunji, A.1    Anderson, S.2
  • 24
    • 0005474505 scopus 로고    scopus 로고
    • Impact of management approach on project interaction and performance
    • (a). JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1997)123:4(411)
    • Pocock, J., Liu, L. Y., and, Kim, M. K. (1997 a). " Impact of management approach on project interaction and performance." J. Constr. Eng. Manage., 123 (4), 411-418. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1997) 123:4(411)
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 411-418
    • Pocock, J.1    Liu, L.Y.2    Kim, M.K.3
  • 25
    • 0031103107 scopus 로고    scopus 로고
    • Prediction of project performance based on degree of interaction
    • (b). JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1997)13:2(63)
    • Pocock, J., Liu, L. Y., and, Tang, W. H. (1997 b). " Prediction of project performance based on degree of interaction." J. Manage. Eng., 13 (2), 63-76. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1997)13:2(63)
    • (1997) J. Manage. Eng. , vol.13 , Issue.2 , pp. 63-76
    • Pocock, J.1    Liu, L.Y.2    Tang, W.H.3
  • 26
    • 78650330073 scopus 로고    scopus 로고
    • Green project management practices for sustainable construction
    • JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000030
    • Robichaud, L. B., and, Anantatmula, V. S. (2011). " Green project management practices for sustainable construction." J. Manage. Eng., 27 (1), 48-57. JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000030
    • (2011) J. Manage. Eng. , vol.27 , Issue.1 , pp. 48-57
    • Robichaud, L.B.1    Anantatmula, V.S.2
  • 27
    • 58149247681 scopus 로고    scopus 로고
    • Early contractor involvement in design and its impact on construction schedule performance
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:1(12)
    • Song, L., Mohamed, Y., and, AbouRizk, S. M. (2009). " Early contractor involvement in design and its impact on construction schedule performance." J. Manage. Eng., 25 (1), 12-20. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:1(12)
    • (2009) J. Manage. Eng. , vol.25 , Issue.1 , pp. 12-20
    • Song, L.1    Mohamed, Y.2    Abourizk, S.M.3
  • 28
    • 84855913313 scopus 로고    scopus 로고
    • Project delivery metrics for sustainable, high-performance buildings
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000379
    • Swarup, L., Korkmaz, S., and, Riley, D. (2011). " Project delivery metrics for sustainable, high-performance buildings." J. Constr. Eng. Manage., 137 (12), 1043-1051. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862. 0000379
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.12 , pp. 1043-1051
    • Swarup, L.1    Korkmaz, S.2    Riley, D.3
  • 29
    • 79955460590 scopus 로고    scopus 로고
    • Meeting the burden of proof with case study research
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000283
    • Taylor, J. E., Dossick, J. S., and, Garvin, M. (2011). " Meeting the burden of proof with case study research." J. Constr. Eng. Manage., 137 (4), 303-311. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000283
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.4 , pp. 303-311
    • Taylor, J.E.1    Dossick, J.S.2    Garvin, M.3
  • 30
    • 78650388363 scopus 로고    scopus 로고
    • Selection of project delivery method in transit: Drivers and objectives
    • JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000027
    • Touran, A., Gransberg, D. D., Molenaar, K. R., and, Ghavamifar, K. (2011). " Selection of project delivery method in transit: Drivers and objectives." J. Manage. Eng., 27 (1), 21-27. JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000027
    • (2011) J. Manage. Eng. , vol.27 , Issue.1 , pp. 21-27
    • Touran, A.1    Gransberg, D.D.2    Molenaar, K.R.3    Ghavamifar, K.4
  • 32
    • 84857028428 scopus 로고    scopus 로고
    • U.S. Green Building Council (USGBC) Oct. 5, 2009
    • U.S. Green Building Council (USGBC). (2009). " LEED projects and case studies directory." http://www.usgbc.org/LEED/Project/ CertifiedProjectList.aspx (Oct. 5, 2009).
    • (2009) LEED Projects and Case Studies Directory
  • 33
    • 84872691380 scopus 로고    scopus 로고
    • U.S. Green Building Council (USGBC) May 2, 2010
    • U.S. Green Building Council (USGBC). (2010). " About." http://www.usgbc.org/DisplayPage.aspx?CMSPageID=124 (May 2, 2010).
    • (2010) About
  • 35
    • 84872710736 scopus 로고    scopus 로고
    • Whole Building Design Guide (WBDG) (Oct. 3, 2009)
    • Whole Building Design Guide (WBDG). (2009). " Engage the integrated design process." http://www.wbdg.org/design/engage-process.php (Oct. 3, 2009).
    • (2009) Engage the Integrated Design Process


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.