메뉴 건너뛰기




Volumn 13, Issue 2, 1997, Pages 63-76

Prediction of project performance based on degree of interaction

Author keywords

[No Author keywords available]

Indexed keywords

DATABASE SYSTEMS; DESIGN; MODIFICATION; PERFORMANCE; REGRESSION ANALYSIS; SCHEDULING;

EID: 0031103107     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(1997)13:2(63)     Document Type: Review
Times cited : (15)

References (11)
  • 2
    • 5244361719 scopus 로고
    • Constructability, a primer
    • Constructability Task Force, Austin, Tex.
    • Construction Industry Institute. (CII). (1986). "Constructability, a primer." CII Publ. 3-1, Constructability Task Force, Austin, Tex., 1-16.
    • (1986) CII Publ. 3-1 , pp. 1-16
  • 3
    • 85033285277 scopus 로고
    • Construction quality in the Department of Defense
    • Ofc. of the Assistant Secretary of Defense (Installations), Washington, D.C.
    • Department of Defense (DOD). (1993). "Construction quality in the Department of Defense." Constr. Mgmt. Board Rep., Ofc. of the Assistant Secretary of Defense (Installations), Washington, D.C., 1-33.
    • (1993) Constr. Mgmt. Board Rep. , pp. 1-33
  • 4
    • 0343512844 scopus 로고
    • Doctoral dissertation, Dept. of Civ. Engrg., Stanford University, Stanford, Calif.
    • Fergusson, K. J. (1993). "Impact of integration on industrial facility quality," Doctoral dissertation, Dept. of Civ. Engrg., Stanford University, Stanford, Calif., 1-187.
    • (1993) Impact of Integration on Industrial Facility Quality , pp. 1-187
    • Fergusson, K.J.1
  • 5
    • 0026882125 scopus 로고
    • Noncontractual methods of integration on construction projects
    • ASCE
    • Nam, C. H., and Tatum, C. B. (1992). "Noncontractual methods of integration on construction projects." J. Constr. Engrg. and Mgmt., ASCE, 118(2), 385-398.
    • (1992) J. Constr. Engrg. and Mgmt. , vol.118 , Issue.2 , pp. 385-398
    • Nam, C.H.1    Tatum, C.B.2
  • 7
    • 0000995248 scopus 로고    scopus 로고
    • Relationship between project interaction and performance indicators
    • ASCE
    • Pocock, J. B., Hyun, C. T., Liu, L. Y., and Kim, M. K. (1996). "Relationship between project interaction and performance indicators." J. Constr. Engrg. and Mgmt., ASCE, 122(2), 1-12.
    • (1996) J. Constr. Engrg. and Mgmt. , vol.122 , Issue.2 , pp. 1-12
    • Pocock, J.B.1    Hyun, C.T.2    Liu, L.Y.3    Kim, M.K.4
  • 10
    • 0006804676 scopus 로고
    • Integrating construction resources and technology into engineering
    • New York, N.Y.
    • The Business Roundtable. (BR). (1982). "Integrating construction resources and technology into engineering." Constr. Industry Cost Effectiveness Proj. Rep. (Rep. B-1), New York, N.Y., 1-18.
    • (1982) Constr. Industry Cost Effectiveness Proj. Rep. (Rep. B-1) , pp. 1-18
  • 11
    • 0027675809 scopus 로고
    • Partnering project performance in the U.S. Army Corps of Engineers
    • ASCE
    • Weston and Gibson. (1993). "Partnering project performance in the U.S. Army Corps of Engineers." J. Mgmt. in Engrg., ASCE, 9(4).
    • (1993) J. Mgmt. in Engrg. , vol.9 , Issue.4
    • Weston1    Gibson2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.