메뉴 건너뛰기




Volumn 51, Issue 6, 2013, Pages 1885-1897

A simulation-based methodology to analyse production line disruptions

Author keywords

design of experiments (DOE); discrete event simulation (DES); manufacturing systems; parameter optimisation; performance improvement

Indexed keywords

AUTOMOTIVE MANUFACTURERS; CYCLE TIME; DECISION PARAMETERS; MANUFACTURING PROCESS; OPTIMAL SETS; PARAMETER OPTIMISATION; PARAMETER VALUES; PERFORMANCE IMPROVEMENTS; PRODUCTION LINE;

EID: 84871320945     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.720389     Document Type: Article
Times cited : (36)

References (34)
  • 3
    • 0012316374 scopus 로고    scopus 로고
    • Using response surfaces to improve the search for satisfactory behavior in system dynamics models
    • Bailey, R., Bras, B., and Allen, J.K., 2000. Using response surfaces to improve the search for satisfactory behavior in system dynamics models. System Dynamics Review, 16 (2), 75-90.
    • (2000) System Dynamics Review , vol.16 , Issue.2 , pp. 75-90
    • Bailey, R.1    Bras, B.2    Allen, J.K.3
  • 4
    • 4944222319 scopus 로고    scopus 로고
    • Humans: The missing link in manufacturing simulation?
    • Baines, T., et al., 2004. Humans: The missing link in manufacturing simulation? Simulation Modelling Practice and Theory, 12 (7- 8), 515-526.
    • (2004) Simulation Modelling Practice and Theory , vol.12 , Issue.7-8 , pp. 515-526
    • Baines, T.1
  • 5
    • 0346318408 scopus 로고    scopus 로고
    • On the interface between operations and human resources management
    • Boudreau, J., et al., 2003. On the interface between operations and human resources management. Manufacturing & Service Operations Management, 5 (3), 179-202.
    • (2003) Manufacturing & Service Operations Management , vol.5 , Issue.3 , pp. 179-202
    • Boudreau, J.1
  • 6
    • 56349156973 scopus 로고    scopus 로고
    • Effect of information sharing in supply chains with flexibility
    • Chan, H.K. and Chan, F.T.S., 2009. Effect of information sharing in supply chains with flexibility. International Journal of Production Research, 47 (1), 213-232.
    • (2009) International Journal of Production Research , vol.47 , Issue.1 , pp. 213-232
    • Chan, H.K.1    Chan, F.T.S.2
  • 7
    • 27744445781 scopus 로고    scopus 로고
    • An exploratory study of manufacturing strategy practices of machinery manufacturing companies in India
    • Dangayach, G.S. and Deshmukh, S.G., 2006. An exploratory study of manufacturing strategy practices of machinery manufacturing companies in India. Omega, 34 (3), 254-273.
    • (2006) Omega , vol.34 , Issue.3 , pp. 254-273
    • Dangayach, G.S.1    Deshmukh, S.G.2
  • 8
    • 0000432952 scopus 로고
    • Simulation optimization of several response variables
    • Derringer, G. and Suich, R., 1980. Simulation optimization of several response variables. Journal of Quality Technology, 12 (4), 214-219.
    • (1980) Journal of Quality Technology , vol.12 , Issue.4 , pp. 214-219
    • Derringer, G.1    Suich, R.2
  • 10
    • 0002478039 scopus 로고
    • The emerging theory of manufacturing
    • Drucker, P.F., 1990. The emerging theory of manufacturing. Harvard Business Review, 68 (3), 94-102.
    • (1990) Harvard Business Review , vol.68 , Issue.3 , pp. 94-102
    • Drucker, P.F.1
  • 11
    • 74349109291 scopus 로고    scopus 로고
    • Overall equipment effectiveness (OEE) and process capability (PC) measures: A relationship analysis
    • Garza-Reyes, J.A., et al., 2010. Overall equipment effectiveness (OEE) and process capability (PC) measures: A relationship analysis. International Journal of Quality & Reliability Management, 27 (1), 48-62.
    • (2010) International Journal of Quality & Reliability Management , vol.27 , Issue.1 , pp. 48-62
    • Garza-Reyes, J.A.1
  • 12
    • 84986018743 scopus 로고    scopus 로고
    • Application of discrete-event simulation to study the paving operation of asphalt concrete
    • Hassan, M.M. and Gruber, S., 2008. Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation: Information, Process, Management, 8 (1), 7-22.
    • (2008) Construction Innovation: Information, Process, Management , vol.8 , Issue.1 , pp. 7-22
    • Hassan, M.M.1    Gruber, S.2
  • 13
    • 84867369737 scopus 로고    scopus 로고
    • Optimal vehicle allocation for an automated materials handling system using simulation optimization
    • in press, DOI: 10.1080/00207543.2011.622311
    • Huang, C-J., Chang, K-H., and Lin, J.T., 2011. Optimal vehicle allocation for an automated materials handling system using simulation optimisation. International Journal of Production Research, in press, DOI: 10.1080/00207543.2011.622311.
    • (2011) International Journal of Production Research
    • Huang, C.-J.1    Chang, K.-H.2    Lin, J.T.3
  • 14
    • 79952378638 scopus 로고    scopus 로고
    • Root cause analysis support for quality improvement in electronics manufacturing
    • Huertas-Quintero, L.A.M., et al., 2011. Root cause analysis support for quality improvement in electronics manufacturing. Assembly Automation, 31 (1), 38-46.
    • (2011) Assembly Automation , vol.31 , Issue.1 , pp. 38-46
    • Huertas-Quintero, L.A.M.1
  • 16
    • 2942601463 scopus 로고    scopus 로고
    • Improved efficiency with production disturbance reduction in manufacturing systems based on discrete-event simulation
    • Ingemansson, A. and Bolmsjo, G.S., 2004. Improved efficiency with production disturbance reduction in manufacturing systems based on discrete-event simulation. Journal of Manufacturing Technology Management, 15 (3), 267-274.
    • (2004) Journal of Manufacturing Technology Management , vol.15 , Issue.3 , pp. 267-274
    • Ingemansson, A.1    Bolmsjo, G.S.2
  • 17
    • 23844471520 scopus 로고    scopus 로고
    • Reducing bottlenecks in a manufacturing system with automatic data collection and discrete-event simulation
    • Ingemansson, A., Ylipaa, T., and Bolmsjo, G.S., 2005. Reducing bottlenecks in a manufacturing system with automatic data collection and discrete-event simulation. Journal of Manufacturing Technology Management, 16 (6), 615-628.
    • (2005) Journal of Manufacturing Technology Management , vol.16 , Issue.6 , pp. 615-628
    • Ingemansson, A.1    Ylipaa, T.2    Bolmsjo, G.S.3
  • 18
    • 84982743538 scopus 로고
    • Sensitivity analysis and optimization of system dynamics model: Regression analysis and statistical design of experiments
    • Kleijnen, J.P.C., 1995. Sensitivity analysis and optimization of system dynamics model: Regression analysis and statistical design of experiments. System Dynamics Review, 11 (4), 321-327.
    • (1995) System Dynamics Review , vol.11 , Issue.4 , pp. 321-327
    • Kleijnen, J.P.C.1
  • 20
    • 33745866656 scopus 로고    scopus 로고
    • A comparative study of implementation of manufacturing strategies in Thai and Indian automotive manufacturing companies
    • Laosirihongthong, T. and Dangayach, G.S., 2005. A comparative study of implementation of manufacturing strategies in Thai and Indian automotive manufacturing companies. Journal of Manufacturing Systems, 24 (2), 131-143.
    • (2005) Journal of Manufacturing Systems , vol.24 , Issue.2 , pp. 131-143
    • Laosirihongthong, T.1    Dangayach, G.S.2
  • 21
    • 36248994722 scopus 로고    scopus 로고
    • Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines
    • Lavoie, P., Kenne, J.-P., and Gharbi, A., 2007. Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines. International Journal of Production Research, 45 (24), 5667-5685.
    • (2007) International Journal of Production Research , vol.45 , Issue.24 , pp. 5667-5685
    • Lavoie, P.1    Kenne, J.-P.2    Gharbi, A.3
  • 23
    • 5144231627 scopus 로고    scopus 로고
    • Speed delivery: Dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management
    • Liao, D.-Y. and Fu, H.-S., 2004. Speed delivery: Dynamic OHT allocation and dispatching in large-scale, 300-mm AMHS management. IEEE Robotics & Automation Magazine, 11 (3), 22-32.
    • (2004) IEEE Robotics & Automation Magazine , vol.11 , Issue.3 , pp. 22-32
    • Liao, D.-Y.1    Fu, H.-S.2
  • 24
    • 79959343389 scopus 로고    scopus 로고
    • Role of design complexity in technology improvement
    • McNerney, J., et al., 2011. Role of design complexity in technology improvement. Proceedings of the National Academy of Sciences, 108 (22), 9008-9013.
    • (2011) Proceedings of the National Academy of Sciences , vol.108 , Issue.22 , pp. 9008-9013
    • McNerney, J.1
  • 26
    • 33847067597 scopus 로고    scopus 로고
    • Analytical approach to estimating AMHS performance in 300mm fabs
    • Nazzal, D. and McGinnis, L.F., 2007. Analytical approach to estimating AMHS performance in 300mm fabs. International Journal of Production Research, 45 (3), 571-590.
    • (2007) International Journal of Production Research , vol.45 , Issue.3 , pp. 571-590
    • Nazzal, D.1    McGinnis, L.F.2
  • 27
    • 82855162630 scopus 로고    scopus 로고
    • Process evaluation of award of work contracts in a government department
    • Padhi, S.S. and Mohapatra, P.K.J., 2009. Process evaluation of award of work contracts in a government department. International Journal of Electronic Governance, 2 (2/3), 118-130.
    • (2009) International Journal of Electronic Governance , vol.2 , Issue.2-3 , pp. 118-130
    • Padhi, S.S.1    Mohapatra, P.K.J.2
  • 28
    • 37149023592 scopus 로고    scopus 로고
    • Organizational knowledge and the manufacturing strategy process: A resource-based view analysis
    • Paiva, E.L., Roth, A.V., and Fensterseifer, J.E., 2008. Organizational knowledge and the manufacturing strategy process: A resource-based view analysis. Journal of Operations Management, 26 (1), 115-132.
    • (2008) Journal of Operations Management , vol.26 , Issue.1 , pp. 115-132
    • Paiva, E.L.1    Roth, A.V.2    Fensterseifer, J.E.3
  • 29
    • 0031095822 scopus 로고    scopus 로고
    • Design of serial production systems using discrete event simulation and nonconvex programming techniques
    • Phillis, Y.A., et al., 1997. Design of serial production systems using discrete event simulation and nonconvex programming techniques. International Journal of Production Research, 35 (3), 753-766.
    • (1997) International Journal of Production Research , vol.35 , Issue.3 , pp. 753-766
    • Phillis, Y.A.1
  • 30
    • 5044233746 scopus 로고    scopus 로고
    • Operational design of a supply chain system using the Taguchi method, response surface methodology, simulation and optimization
    • Shang, J.S., Li, S., and Tadikamalla, P., 2004. Operational design of a supply chain system using the Taguchi method, response surface methodology, simulation and optimization. International Journal of Production Research, 42 (18), 3823-3849.
    • (2004) International Journal of Production Research , vol.42 , Issue.18 , pp. 3823-3849
    • Shang, J.S.1    Li, S.2    Tadikamalla, P.3
  • 32
    • 75949127599 scopus 로고    scopus 로고
    • Risk assessment and management for supply chain networks: A case study
    • Tuncel, G. and Alpan, G., 2010. Risk assessment and management for supply chain networks: A case study. Computers in Industry, 61 (3), 250-259.
    • (2010) Computers in Industry , vol.61 , Issue.3 , pp. 250-259
    • Tuncel, G.1    Alpan, G.2
  • 34
    • 51749105609 scopus 로고    scopus 로고
    • A human task-oriented simulation study in autonomous production cells
    • Zhang, X., et al., 2008. A human task-oriented simulation study in autonomous production cells. International Journal of Production Research, 46 (18), 5013-5041.
    • (2008) International Journal of Production Research , vol.46 , Issue.18 , pp. 5013-5041
    • Zhang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.