-
1
-
-
0022667867
-
Optimal control of production rate in a failure prone manufacturing system
-
Akella, R. and Kumar, P.R., Optimal control of production rate in a failure prone manufacturing system. IEEE Trans. Automat. Contr., 1986, AC-31, 116-126.
-
(1986)
IEEE Trans. Automat. Contr
, vol.AC-31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
2
-
-
0028374441
-
Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-type systems
-
Bai, S.X. and Gershwin, S.B., Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems. Int. J. Prod. Res., 1994, 32, 365-385.
-
(1994)
Int. J. Prod. Res
, vol.32
, pp. 365-385
-
-
Bai, S.X.1
Gershwin, S.B.2
-
4
-
-
0034633396
-
Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy
-
Bonvik, A.M., Dallery, Y. and Gershwin, S.B., Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy. Int. J. Prod. Res., 2000, 38, 2845-2869.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 2845-2869
-
-
Bonvik, A.M.1
Dallery, Y.2
Gershwin, S.B.3
-
5
-
-
0003681233
-
-
Unpublished PhD thesis, Massachusetts Institute of Technology Dept. of Electrical Engineering and Computer Science
-
Burman, M.H., New results in flow line analysis. Unpublished PhD thesis, Massachusetts Institute of Technology Dept. of Electrical Engineering and Computer Science, 1995.
-
(1995)
New results in flow line analysis
-
-
Burman, M.H.1
-
6
-
-
36249008015
-
-
University of Michigan, Department of Electrical Engineering and Computer Science, Ann Arbor, Michigan, No. CGR-99-05
-
Chiang, S.Y., Kuo, C.T. and Meerkov, S.M., c-Bottlenecks in Serial Production Lines: Identification and application, 1999 (University of Michigan, Department of Electrical Engineering and Computer Science, Ann Arbor, Michigan). No. CGR-99-05.
-
(1999)
c-Bottlenecks in Serial Production Lines: Identification and application
-
-
Chiang, S.Y.1
Kuo, C.T.2
Meerkov, S.M.3
-
7
-
-
0024732503
-
Approximate analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R. and Xie, X.L., Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Trans. Automat. Contr., 1989, 34, 943-953.
-
(1989)
IEEE Trans. Automat. Contr
, vol.34
, pp. 943-953
-
-
Dallery, Y.1
David, R.2
Xie, X.L.3
-
8
-
-
0033097497
-
An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
-
Dallery, Y. and Le Bihan, H., An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. Int. J. Prod. Res., 1999, 37, 1093-1117.
-
(1999)
Int. J. Prod. Res
, vol.37
, pp. 1093-1117
-
-
Dallery, Y.1
Le Bihan, H.2
-
9
-
-
0018054934
-
Analytic methods for calculating performance measures of production lines with buffer storages
-
Gershwin, S.B. and Schick, I.C., Analytic methods for calculating performance measures of production lines with buffer storages. Proc IEEE Conf Decis Control Incl Symp Adapt Processes 17th, Jan 10-12 1979, 1979, 618-624.
-
(1979)
Proc IEEE Conf Decis Control Incl Symp Adapt Processes 17th, Jan 10-12 1979
, pp. 618-624
-
-
Gershwin, S.B.1
Schick, I.C.2
-
10
-
-
0034418438
-
Efficient algorithms for buffer space allocation
-
19-22 May
-
Gershwin, S.B. and Schor, I.E., Efficient algorithms for buffer space allocation, Annals of Operations Research, Performance Evaluation and Optimization of Production Lines. International Workshop, 19-22 May 1997, 2000, 93, pp. 117-144.
-
(1997)
Annals of Operations Research, Performance Evaluation and Optimization of Production Lines. International Workshop
, vol.2000
, Issue.93
, pp. 117-144
-
-
Gershwin, S.B.1
Schor, I.E.2
-
11
-
-
0041417619
-
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
-
Gharbi, A. and Kenne, J.P., Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems. IIE Trans., 2003, 35, 941-952.
-
(2003)
IIE Trans
, vol.35
, pp. 941-952
-
-
Gharbi, A.1
Kenne, J.P.2
-
12
-
-
0030684287
-
Production rate control and corrective maintenance planning problem of a failure prone manufacturing system
-
Paper presented at the, Albuquerque
-
Kenné, J.P. and Boukas, E.K., Production rate control and corrective maintenance planning problem of a failure prone manufacturing system. Paper presented at the ACC conference, Albuquerque, 1997.
-
(1997)
ACC conference
-
-
Kenné, J.P.1
Boukas, E.K.2
-
13
-
-
0033079907
-
Experimental design in production and maintenance control problem of a single machine, single product manufacturing system
-
Kenne, J.P. and Gharbi, A., Experimental design in production and maintenance control problem of a single machine, single product manufacturing system. Int. J. Prod. Res., 1999, 37, 621-637.
-
(1999)
Int. J. Prod. Res
, vol.37
, pp. 621-637
-
-
Kenne, J.P.1
Gharbi, A.2
-
14
-
-
0037449249
-
Short-term robustness of production management systems: A case study
-
Kleijnen, J.P.C. and Gaury, E., Short-term robustness of production management systems: A case study. Eur. J. Oper. Res., 2003, 148(2), 452-465.
-
(2003)
Eur. J. Oper. Res
, vol.148
, Issue.2
, pp. 452-465
-
-
Kleijnen, J.P.C.1
Gaury, E.2
-
16
-
-
0028392099
-
Optimal feedback production planning in a stochastic two-machine flowshop
-
Lou, S., Sethi, S.P. and Zhang, Q., Optimal feedback production planning in a stochastic two-machine flowshop. Eur. J. Oper. Res., 1994, 73, 331-345.
-
(1994)
Eur. J. Oper. Res
, vol.73
, pp. 331-345
-
-
Lou, S.1
Sethi, S.P.2
Zhang, Q.3
-
18
-
-
0029378614
-
Optimal feedback production planning in a stochastic N-machine flowshop
-
Presman, E., Sethi, S. and Zhang, Q., Optimal feedback production planning in a stochastic N-machine flowshop. Automatica, 1995, 31, 1325-1325.
-
(1995)
Automatica
, vol.31
, pp. 1325-1325
-
-
Presman, E.1
Sethi, S.2
Zhang, Q.3
-
19
-
-
0003850656
-
-
2nd ed, J. Wiley & Sons Systems Publishing: New York, NY, West Lafayette, Ind
-
Pritsker, A.A.B, and O'Reilly, J.J., Simulation with Visual SLAM and AweSim, 2nd ed., 1999 (J. Wiley & Sons Systems Publishing: New York, NY, West Lafayette, Ind.).
-
(1999)
Simulation with Visual SLAM and AweSim
-
-
Pritsker, A.A.B.1
O'Reilly, J.J.2
-
20
-
-
0742286690
-
Decomposition/aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines
-
Sadr, J. and Malhame, R.P., Decomposition/aggregation-based dynamic programming optimization of partially homogeneous unreliable transfer lines. IEEE Trans. Automat. Contr., 2004, 49, 68-81.
-
(2004)
IEEE Trans. Automat. Contr
, vol.49
, pp. 68-81
-
-
Sadr, J.1
Malhame, R.P.2
-
21
-
-
0003481540
-
-
Unpublished M.S. thesis, Massachusetts Institute of Technology Dept. of Electrical Engineering and Computer Science
-
Schor, J.E., Efficient algorithms for buffer allocation, Unpublished M.S. thesis, Massachusetts Institute of Technology Dept. of Electrical Engineering and Computer Science, 1995.
-
(1995)
Efficient algorithms for buffer allocation
-
-
Schor, J.E.1
|