메뉴 건너뛰기




Volumn 178, Issue 17, 2008, Pages 3382-3392

Integrated production planning and preventive maintenance in deteriorating production systems

Author keywords

Failure prone manufacturing systems; Preventive maintenance; Production planning

Indexed keywords

COMPUTER NETWORKS; HEURISTIC METHODS; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MAINTENANCE; NONLINEAR PROGRAMMING; PLANNING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; PROJECT MANAGEMENT; PUBLIC POLICY;

EID: 45849131693     PISSN: 00200255     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ins.2008.05.007     Document Type: Article
Times cited : (119)

References (24)
  • 1
    • 0024944070 scopus 로고
    • Single machine flow-time scheduling with a single breakdown
    • Adiri I., Bruno J., Frostig E., and Rinnooy Kan A.H.G. Single machine flow-time scheduling with a single breakdown. Acta Inform. 26 (1989) 679-696
    • (1989) Acta Inform. , vol.26 , pp. 679-696
    • Adiri, I.1    Bruno, J.2    Frostig, E.3    Rinnooy Kan, A.H.G.4
  • 2
    • 0001233812 scopus 로고
    • Improved algorithms for economic lot size problems
    • Aggarwal A., and Park J.K. Improved algorithms for economic lot size problems. Oper. Res. 41 (1993) 549-571
    • (1993) Oper. Res. , vol.41 , pp. 549-571
    • Aggarwal, A.1    Park, J.K.2
  • 3
    • 27644520542 scopus 로고    scopus 로고
    • Flow shop scheduling problem with limited machine availability: a heuristic approach
    • Aggoune R., and Portmann M.-C. Flow shop scheduling problem with limited machine availability: a heuristic approach. Int. J. Prod. Econ. 99 1-2 (2006) 4-15
    • (2006) Int. J. Prod. Econ. , vol.99 , Issue.1-2 , pp. 4-15
    • Aggoune, R.1    Portmann, M.-C.2
  • 4
    • 45849109057 scopus 로고    scopus 로고
    • E.H. Aghezzaf, A. Jamali, D. Ait-Kadi, A production and maintenance planning model for production systems subject to preventive maintenance with minimal repair at failure, in: Proceedings of the Fifth International Industrial Engineering Conference, Québec, Canada, 2003.
    • E.H. Aghezzaf, A. Jamali, D. Ait-Kadi, A production and maintenance planning model for production systems subject to preventive maintenance with minimal repair at failure, in: Proceedings of the Fifth International Industrial Engineering Conference, Québec, Canada, 2003.
  • 5
    • 0033700686 scopus 로고    scopus 로고
    • BC-PROD: a specialized branch-and-cut system for lot-sizing problems
    • Belvaux G., and Wolsey L.A. BC-PROD: a specialized branch-and-cut system for lot-sizing problems. Manage. Sci. 46 (2000) 724-738
    • (2000) Manage. Sci. , vol.46 , pp. 724-738
    • Belvaux, G.1    Wolsey, L.A.2
  • 7
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran G.R., and Yanasse H.H. Computational complexity of the capacitated lot size problem. Manage. Sci. 28 (1982) 1174-1186
    • (1982) Manage. Sci. , vol.28 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 8
    • 0000693192 scopus 로고    scopus 로고
    • Heuristic algorithms for the two-machine flowshop problem with limited machine availability
    • Blazewicz J., Breit J., Formanowicz P., Kubiak W., and Schmidt G. Heuristic algorithms for the two-machine flowshop problem with limited machine availability. Omega J. 29 (2001) 599-608
    • (2001) Omega J. , vol.29 , pp. 599-608
    • Blazewicz, J.1    Breit, J.2    Formanowicz, P.3    Kubiak, W.4    Schmidt, G.5
  • 9
    • 0023456043 scopus 로고
    • Solving multi-item lot-sizing problems using variable redefinition
    • Eppen G.D., and Martin R.K. Solving multi-item lot-sizing problems using variable redefinition. Oper. Res. 35 (1987) 832-848
    • (1987) Oper. Res. , vol.35 , pp. 832-848
    • Eppen, G.D.1    Martin, R.K.2
  • 10
    • 0019032810 scopus 로고
    • Deterministic production planning with concave costs and capacity constraints
    • Florian M., and Klein M. Deterministic production planning with concave costs and capacity constraints. Manage. Sci. 26 (1971) 669-679
    • (1971) Manage. Sci. , vol.26 , pp. 669-679
    • Florian, M.1    Klein, M.2
  • 11
    • 0023367406 scopus 로고
    • Evaluating the effects of machine breakdowns in stochastic scheduling problems
    • Glazebrook K.D. Evaluating the effects of machine breakdowns in stochastic scheduling problems. Naval Res. Logist. 34 (1987) 319-335
    • (1987) Naval Res. Logist. , vol.34 , pp. 319-335
    • Glazebrook, K.D.1
  • 12
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semiresumable jobs on single machine
    • Graves G.H., and Lee C.Y. Scheduling maintenance and semiresumable jobs on single machine. Naval Res. Logist. 46 (1999) 845-862
    • (1999) Naval Res. Logist. , vol.46 , pp. 845-862
    • Graves, G.H.1    Lee, C.Y.2
  • 14
    • 0020100527 scopus 로고
    • Production planning with time-dependent capacity bounds
    • Lambert A., and Luss H. Production planning with time-dependent capacity bounds. Eur. J. Oper. Res. 9 (1982) 275-280
    • (1982) Eur. J. Oper. Res. , vol.9 , pp. 275-280
    • Lambert, A.1    Luss, H.2
  • 15
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • Lee C.Y. Machine scheduling with an availability constraint. J. Global Opt. 9 (1996) 395-416
    • (1996) J. Global Opt. , vol.9 , pp. 395-416
    • Lee, C.Y.1
  • 16
    • 0000049036 scopus 로고    scopus 로고
    • Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint
    • Lee C.Y. Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint. Oper. Res. Lett. 20 (1997) 129-139
    • (1997) Oper. Res. Lett. , vol.20 , pp. 129-139
    • Lee, C.Y.1
  • 17
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • Lee C.Y., and Chen Z.L. Scheduling jobs and maintenance activities on parallel machines. Naval Res. Logist. 47 (2000) 145-165
    • (2000) Naval Res. Logist. , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 18
    • 0008819041 scopus 로고
    • Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities
    • Li W., and Cao J. Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities. Oper. Res. Lett. 18 (1995) 81-91
    • (1995) Oper. Res. Lett. , vol.18 , pp. 81-91
    • Li, W.1    Cao, J.2
  • 19
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on single machine
    • Qi X., Chen T., and Tu F. Scheduling the maintenance on single machine. J. Oper. Res. Soc. 50 10 (1999) 1071-1078
    • (1999) J. Oper. Res. Soc. , vol.50 , Issue.10 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 20
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt G. Scheduling with limited machine availability. Eur. J. Oper. Res. 121 (2000) 1-15
    • (2000) Eur. J. Oper. Res. , vol.121 , pp. 1-15
    • Schmidt, G.1
  • 22
    • 0001491020 scopus 로고    scopus 로고
    • An O(T3) algorithm for the economic lot-sizing problem with constant capacities
    • Van Hoesel C.P.M., and Wagelmans A.P.M. An O(T3) algorithm for the economic lot-sizing problem with constant capacities. Manage. Sci. 42 (1996) 142-150
    • (1996) Manage. Sci. , vol.42 , pp. 142-150
    • Van Hoesel, C.P.M.1    Wagelmans, A.P.M.2
  • 23
    • 0033198250 scopus 로고    scopus 로고
    • Integrated maintenance and production decisions in a hierarchical production planning environment
    • Wienstein L., and Chung C.H. Integrated maintenance and production decisions in a hierarchical production planning environment. Comput. Oper. Res. 26 (1999) 1059-1074
    • (1999) Comput. Oper. Res. , vol.26 , pp. 1059-1074
    • Wienstein, L.1    Chung, C.H.2
  • 24
    • 0036968625 scopus 로고    scopus 로고
    • Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
    • Wolsey L.A. Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation. Manage. Sci. 48 (2002) 1587-1602
    • (2002) Manage. Sci. , vol.48 , pp. 1587-1602
    • Wolsey, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.