-
2
-
-
0001233812
-
Improved algorithms for economic lot size problems
-
Aggarwal A., and Park J.K. Improved algorithms for economic lot size problems. Oper. Res. 41 (1993) 549-571
-
(1993)
Oper. Res.
, vol.41
, pp. 549-571
-
-
Aggarwal, A.1
Park, J.K.2
-
3
-
-
27644520542
-
Flow shop scheduling problem with limited machine availability: a heuristic approach
-
Aggoune R., and Portmann M.-C. Flow shop scheduling problem with limited machine availability: a heuristic approach. Int. J. Prod. Econ. 99 1-2 (2006) 4-15
-
(2006)
Int. J. Prod. Econ.
, vol.99
, Issue.1-2
, pp. 4-15
-
-
Aggoune, R.1
Portmann, M.-C.2
-
4
-
-
45849109057
-
-
E.H. Aghezzaf, A. Jamali, D. Ait-Kadi, A production and maintenance planning model for production systems subject to preventive maintenance with minimal repair at failure, in: Proceedings of the Fifth International Industrial Engineering Conference, Québec, Canada, 2003.
-
E.H. Aghezzaf, A. Jamali, D. Ait-Kadi, A production and maintenance planning model for production systems subject to preventive maintenance with minimal repair at failure, in: Proceedings of the Fifth International Industrial Engineering Conference, Québec, Canada, 2003.
-
-
-
-
5
-
-
0033700686
-
BC-PROD: a specialized branch-and-cut system for lot-sizing problems
-
Belvaux G., and Wolsey L.A. BC-PROD: a specialized branch-and-cut system for lot-sizing problems. Manage. Sci. 46 (2000) 724-738
-
(2000)
Manage. Sci.
, vol.46
, pp. 724-738
-
-
Belvaux, G.1
Wolsey, L.A.2
-
7
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran G.R., and Yanasse H.H. Computational complexity of the capacitated lot size problem. Manage. Sci. 28 (1982) 1174-1186
-
(1982)
Manage. Sci.
, vol.28
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
8
-
-
0000693192
-
Heuristic algorithms for the two-machine flowshop problem with limited machine availability
-
Blazewicz J., Breit J., Formanowicz P., Kubiak W., and Schmidt G. Heuristic algorithms for the two-machine flowshop problem with limited machine availability. Omega J. 29 (2001) 599-608
-
(2001)
Omega J.
, vol.29
, pp. 599-608
-
-
Blazewicz, J.1
Breit, J.2
Formanowicz, P.3
Kubiak, W.4
Schmidt, G.5
-
9
-
-
0023456043
-
Solving multi-item lot-sizing problems using variable redefinition
-
Eppen G.D., and Martin R.K. Solving multi-item lot-sizing problems using variable redefinition. Oper. Res. 35 (1987) 832-848
-
(1987)
Oper. Res.
, vol.35
, pp. 832-848
-
-
Eppen, G.D.1
Martin, R.K.2
-
10
-
-
0019032810
-
Deterministic production planning with concave costs and capacity constraints
-
Florian M., and Klein M. Deterministic production planning with concave costs and capacity constraints. Manage. Sci. 26 (1971) 669-679
-
(1971)
Manage. Sci.
, vol.26
, pp. 669-679
-
-
Florian, M.1
Klein, M.2
-
11
-
-
0023367406
-
Evaluating the effects of machine breakdowns in stochastic scheduling problems
-
Glazebrook K.D. Evaluating the effects of machine breakdowns in stochastic scheduling problems. Naval Res. Logist. 34 (1987) 319-335
-
(1987)
Naval Res. Logist.
, vol.34
, pp. 319-335
-
-
Glazebrook, K.D.1
-
12
-
-
0032671338
-
Scheduling maintenance and semiresumable jobs on single machine
-
Graves G.H., and Lee C.Y. Scheduling maintenance and semiresumable jobs on single machine. Naval Res. Logist. 46 (1999) 845-862
-
(1999)
Naval Res. Logist.
, vol.46
, pp. 845-862
-
-
Graves, G.H.1
Lee, C.Y.2
-
13
-
-
0036466573
-
Two-machine flow shops with limited machine availability
-
Kubiak W., Blazewicz J., Formanowicz P., Breit J., and Schmidt G. Two-machine flow shops with limited machine availability. Eur. J. Oper. Res. 136 (2002) 528-540
-
(2002)
Eur. J. Oper. Res.
, vol.136
, pp. 528-540
-
-
Kubiak, W.1
Blazewicz, J.2
Formanowicz, P.3
Breit, J.4
Schmidt, G.5
-
14
-
-
0020100527
-
Production planning with time-dependent capacity bounds
-
Lambert A., and Luss H. Production planning with time-dependent capacity bounds. Eur. J. Oper. Res. 9 (1982) 275-280
-
(1982)
Eur. J. Oper. Res.
, vol.9
, pp. 275-280
-
-
Lambert, A.1
Luss, H.2
-
15
-
-
0000541519
-
Machine scheduling with an availability constraint
-
Lee C.Y. Machine scheduling with an availability constraint. J. Global Opt. 9 (1996) 395-416
-
(1996)
J. Global Opt.
, vol.9
, pp. 395-416
-
-
Lee, C.Y.1
-
16
-
-
0000049036
-
Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint
-
Lee C.Y. Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint. Oper. Res. Lett. 20 (1997) 129-139
-
(1997)
Oper. Res. Lett.
, vol.20
, pp. 129-139
-
-
Lee, C.Y.1
-
17
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
Lee C.Y., and Chen Z.L. Scheduling jobs and maintenance activities on parallel machines. Naval Res. Logist. 47 (2000) 145-165
-
(2000)
Naval Res. Logist.
, vol.47
, pp. 145-165
-
-
Lee, C.Y.1
Chen, Z.L.2
-
18
-
-
0008819041
-
Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities
-
Li W., and Cao J. Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities. Oper. Res. Lett. 18 (1995) 81-91
-
(1995)
Oper. Res. Lett.
, vol.18
, pp. 81-91
-
-
Li, W.1
Cao, J.2
-
19
-
-
0033446820
-
Scheduling the maintenance on single machine
-
Qi X., Chen T., and Tu F. Scheduling the maintenance on single machine. J. Oper. Res. Soc. 50 10 (1999) 1071-1078
-
(1999)
J. Oper. Res. Soc.
, vol.50
, Issue.10
, pp. 1071-1078
-
-
Qi, X.1
Chen, T.2
Tu, F.3
-
20
-
-
0343963100
-
Scheduling with limited machine availability
-
Schmidt G. Scheduling with limited machine availability. Eur. J. Oper. Res. 121 (2000) 1-15
-
(2000)
Eur. J. Oper. Res.
, vol.121
, pp. 1-15
-
-
Schmidt, G.1
-
22
-
-
0001491020
-
An O(T3) algorithm for the economic lot-sizing problem with constant capacities
-
Van Hoesel C.P.M., and Wagelmans A.P.M. An O(T3) algorithm for the economic lot-sizing problem with constant capacities. Manage. Sci. 42 (1996) 142-150
-
(1996)
Manage. Sci.
, vol.42
, pp. 142-150
-
-
Van Hoesel, C.P.M.1
Wagelmans, A.P.M.2
-
23
-
-
0033198250
-
Integrated maintenance and production decisions in a hierarchical production planning environment
-
Wienstein L., and Chung C.H. Integrated maintenance and production decisions in a hierarchical production planning environment. Comput. Oper. Res. 26 (1999) 1059-1074
-
(1999)
Comput. Oper. Res.
, vol.26
, pp. 1059-1074
-
-
Wienstein, L.1
Chung, C.H.2
-
24
-
-
0036968625
-
Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
-
Wolsey L.A. Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation. Manage. Sci. 48 (2002) 1587-1602
-
(2002)
Manage. Sci.
, vol.48
, pp. 1587-1602
-
-
Wolsey, L.A.1
|