메뉴 건너뛰기




Volumn 219, Issue , 2013, Pages 181-196

The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine

Author keywords

Distributed system; Genetic algorithm; Heterogeneous multi factory; Lower bound; Mixed integer linear programming; Production network scheduling

Indexed keywords

DISTRIBUTED SYSTEMS; HETEROGENEOUS MULTI-FACTORY; LOWER BOUNDS; MIXED INTEGER LINEAR PROGRAMMING; PRODUCTION NETWORK;

EID: 84867582302     PISSN: 00200255     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ins.2012.07.020     Document Type: Article
Times cited : (82)

References (37)
  • 1
    • 79957588033 scopus 로고    scopus 로고
    • Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation
    • S. Balin Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation Information Sciences 181 17 2011 3551 3569
    • (2011) Information Sciences , vol.181 , Issue.17 , pp. 3551-3569
    • Balin, S.1
  • 3
    • 0002326640 scopus 로고
    • ADDYMS: Architecture for distributed dynamic manufacturing scheduling
    • A. Famili, D.S. Nau, S.H. Kim, AAAI Press Menlo Park
    • J. Butler, and H. Ohtsubo ADDYMS: architecture for distributed dynamic manufacturing scheduling A. Famili, D.S. Nau, S.H. Kim, Artificial Intelligence Applications in Manufacturing 1992 AAAI Press Menlo Park 199 214
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 199-214
    • Butler, J.1    Ohtsubo, H.2
  • 4
    • 22144475484 scopus 로고    scopus 로고
    • An adaptive genetic algorithm with dominated genes for distributed scheduling problems
    • DOI 10.1016/j.eswa.2005.04.009, PII S095741740500062X
    • F.T.S. Chan, S.H. Chung, and P.L.Y. Chan An adaptive genetic algorithm with dominated genes for distributed scheduling problems Expert Systems with Applications 29 2 2005 364 371 (Pubitemid 40970644)
    • (2005) Expert Systems with Applications , vol.29 , Issue.2 , pp. 364-371
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3
  • 5
    • 30844449000 scopus 로고    scopus 로고
    • Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems
    • DOI 10.1080/00207540500319229, PII L6712640084829
    • F.T.S. Chan, S.H. Chung, and P.L.Y. Chan Application of genetic algorithms with dominated genes in a distributed scheduling problem in flexible manufacturing International Journal of Production Research 44 3 2006 523 543 (Pubitemid 43102625)
    • (2006) International Journal of Production Research , vol.44 , Issue.3 , pp. 523-543
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3
  • 6
    • 3242675861 scopus 로고    scopus 로고
    • Comparison of TFT-LCD and CRT on visual recognition and subjective preference
    • M.T. Chen, and C.C. Lin Comparison of TFT-LCD and CRT on visual recognition and subjective preference International Journal of Industrial Ergonomics 34 2004 167 174
    • (2004) International Journal of Industrial Ergonomics , vol.34 , pp. 167-174
    • Chen, M.T.1    Lin, C.C.2
  • 7
    • 70149098664 scopus 로고    scopus 로고
    • A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling
    • S.H. Chung, F.T.S. Chan, and H.K. Chan A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling Engineering Applications of Artificial Intelligence 22 2009 1005 1014
    • (2009) Engineering Applications of Artificial Intelligence , vol.22 , pp. 1005-1014
    • Chung, S.H.1    Chan, F.T.S.2    Chan, H.K.3
  • 8
    • 69249206751 scopus 로고    scopus 로고
    • An improved genetic algorithm for the distributed and flexible job-shop scheduling problem
    • L. De Giovanni, and F. Pezzella An improved genetic algorithm for the distributed and flexible job-shop scheduling problem European Journal of Operational Research 200 2010 395 408
    • (2010) European Journal of Operational Research , vol.200 , pp. 395-408
    • De Giovanni, L.1    Pezzella, F.2
  • 9
    • 0032156495 scopus 로고    scopus 로고
    • Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness
    • M.M. Dessouky Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness Computers & Industrial Engineering 34 1998 793 806
    • (1998) Computers & Industrial Engineering , vol.34 , pp. 793-806
    • Dessouky, M.M.1
  • 10
    • 79957526144 scopus 로고    scopus 로고
    • A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops
    • M. Fatih Tasgetiren, Q-K. Pan, P.N. Suganthan, and A. H-L. Chen A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops Information Sciences 181 16 2011 3459 3475
    • (2011) Information Sciences , vol.181 , Issue.16 , pp. 3459-3475
    • Fatih Tasgetiren, M.1    Pan, Q.-K.2    Suganthan, P.N.3    Chen, A.H.-L.4
  • 11
    • 77549084648 scopus 로고    scopus 로고
    • Advanced nonparametric tests for multiple comparisons in the design of experiments in computational intelligence and data mining: Experimental analysis of power
    • S. García, A. Fernández, J. Luengo, and F. Herrera Advanced nonparametric tests for multiple comparisons in the design of experiments in computational intelligence and data mining: experimental analysis of power Information Sciences 180 10 2010 2044 2064
    • (2010) Information Sciences , vol.180 , Issue.10 , pp. 2044-2064
    • García, S.1    Fernández, A.2    Luengo, J.3    Herrera, F.4
  • 13
    • 84870053496 scopus 로고    scopus 로고
    • The effect of load on agent-based algorithms for distributed task allocation
    • doi:10.1016/j.ins.2011.06.011 (in press)
    • H. Goldingay, J. van Mourik, The effect of load on agent-based algorithms for distributed task allocation, Information Sciences (in press). http://dx.doi.org/10.1016/j.ins.2011.06.011.
    • Information Sciences
    • Goldingay, H.1    Van Mourik, J.2
  • 15
    • 79960557648 scopus 로고    scopus 로고
    • Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
    • C-J. Hsu, T.C.E. Cheng, and D-L. Yang Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time Information Sciences 181 20 2011 4799 4803
    • (2011) Information Sciences , vol.181 , Issue.20 , pp. 4799-4803
    • Hsu, C.-J.1    Cheng, T.C.E.2    Yang, D.-L.3
  • 16
    • 0036507916 scopus 로고    scopus 로고
    • Web-based multi-functional scheduling system for a distributed manufacturing environment
    • DOI 10.1177/1063293X02010001054
    • H.Z. Jia, J.Y.H. Fuh, A.Y.C. Nee, and Y.F. Zhang Web-based multi-functional scheduling system for a distributed manufacturing environment Concurrent Engineering - Research and Applications 10 1 2002 27 39 (Pubitemid 34699860)
    • (2002) Concurrent Engineering Research and Applications , vol.10 , Issue.1 , pp. 27-39
    • Jia, H.Z.1    Fuh, J.Y.H.2    Nee, A.Y.C.3    Zhang, Y.F.4
  • 18
    • 34548270446 scopus 로고    scopus 로고
    • Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems
    • DOI 10.1016/j.cie.2007.06.024, PII S0360835207001155, Selected Papers from The 27th. International Conference on Computers and Industrial Engineering - Part 2
    • H.Z. Jia, J.Y.H. Fuh, A.Y.C. Nee, and Y.F. Zhang Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems Computers & Industrial Engineering 53 2 2007 313 320 (Pubitemid 47332909)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.2 , pp. 313-320
    • Jia, H.Z.1    Fuh, J.Y.H.2    Nee, A.Y.C.3    Zhang, Y.F.4
  • 19
    • 0035868393 scopus 로고    scopus 로고
    • Job scheduling in heterogeneous distributed systems
    • DOI 10.1016/S0164-1212(00)00098-4
    • H.D. Karatza Job scheduling in heterogeneous distributed systems The Journal of Systems and Software 56 2001 203 212 (Pubitemid 32263529)
    • (2001) Journal of Systems and Software , vol.56 , Issue.3 , pp. 203-212
    • Karatza, H.D.1
  • 20
    • 79955759613 scopus 로고    scopus 로고
    • Minimum perimeter coverage of query regions in a heterogeneous wireless sensor network
    • A.M. Khedr, and W. Osamy Minimum perimeter coverage of query regions in a heterogeneous wireless sensor network Information Sciences 181 15 2011 3130 3142
    • (2011) Information Sciences , vol.181 , Issue.15 , pp. 3130-3142
    • Khedr, A.M.1    Osamy, W.2
  • 21
    • 84863989974 scopus 로고    scopus 로고
    • Multi-level hierarchic genetic-based scheduling of independent jobs in dynamic heterogeneous grid environment
    • doi:10.1016/j.ins.2012.05.016 (in press)
    • J. Kołlodziej, S. Ullah Khan, Multi-level hierarchic genetic-based scheduling of independent jobs in dynamic heterogeneous grid environment, Information Sciences (in press). http://dx.doi.org/10.1016/j.ins.2012.05.016.
    • Information Sciences
    • J. Kołlodziej1
  • 22
    • 0142186077 scopus 로고    scopus 로고
    • Multi-site aggregate production planning with multiple objectives: A goal programming approach
    • S.C.H. Leung, Y. Wu, and K.K. Lai Multi-site aggregate production planning with multiple objectives: a goal programming approach Production Planning and Control 14 5 2003 425 436
    • (2003) Production Planning and Control , vol.14 , Issue.5 , pp. 425-436
    • Leung, S.C.H.1    Wu, Y.2    Lai, K.K.3
  • 23
    • 70350752447 scopus 로고    scopus 로고
    • The distributed permutation flowshop scheduling problem
    • B. Naderi, and R. Ruiz The distributed permutation flowshop scheduling problem Computers & Operations Research 37 2010 754 768
    • (2010) Computers & Operations Research , vol.37 , pp. 754-768
    • Naderi, B.1    Ruiz, R.2
  • 25
    • 33751402603 scopus 로고    scopus 로고
    • Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs
    • DOI 10.1016/j.ejor.2006.03.028, PII S0377221706002153
    • A.J. Ruiz-Torres, F.J. Lopez, and J.C. Ho Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs European Journal of Operational Research 179 2007 302 315 (Pubitemid 44821624)
    • (2007) European Journal of Operational Research , vol.179 , Issue.2 , pp. 302-315
    • Ruiz-Torres, A.J.1    Lopez, F.J.2    Ho, J.C.3
  • 26
    • 4744372709 scopus 로고    scopus 로고
    • A Lagrangian-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
    • M. Sambasivan, and S. Yahya A Lagrangian-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers Computers & Operations Research 32 2005 537 555
    • (2005) Computers & Operations Research , vol.32 , pp. 537-555
    • Sambasivan, M.1    Yahya, S.2
  • 27
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • DOI 10.1109/5254.988492
    • W. Shen Distributed manufacturing scheduling using intelligent agents IEEE Intelligent Systems 17 1 2002 88 94 (Pubitemid 34265876)
    • (2002) IEEE Intelligent Systems and Their Applications , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1
  • 32
    • 78449269535 scopus 로고    scopus 로고
    • A heuristic-based hybrid genetic-variable neighborhood search algorithm for task scheduling in heterogeneous multiprocessor system
    • Y. Wen, H. Xu, and J. Yang A heuristic-based hybrid genetic-variable neighborhood search algorithm for task scheduling in heterogeneous multiprocessor system Information Sciences 181 2011 567 581
    • (2011) Information Sciences , vol.181 , pp. 567-581
    • Wen, Y.1    Xu, H.2    Yang, J.3
  • 33
    • 84962992113 scopus 로고
    • Marginal analysis, multi-plant firms, and business practice: An example
    • F.M. Westfield Marginal analysis, multi-plant firms, and business practice: an example The Quarterly Journal of Economics 69 2 1955 253 268
    • (1955) The Quarterly Journal of Economics , vol.69 , Issue.2 , pp. 253-268
    • Westfield, F.M.1
  • 35
    • 71949130263 scopus 로고    scopus 로고
    • A hybrid genetic algorithm with the Baldwin effect
    • Q. Yuan, F. Qian, and W. Du A hybrid genetic algorithm with the Baldwin effect Information Sciences 180 5 2010 640 652
    • (2010) Information Sciences , vol.180 , Issue.5 , pp. 640-652
    • Yuan, Q.1    Qian, F.2    Du, W.3
  • 36
    • 79955479757 scopus 로고    scopus 로고
    • Learning latent variable models from distributed and abstracted data
    • X. Zhang, W.K. Cheung, and C.H. Li Learning latent variable models from distributed and abstracted data Information Sciences 181 14 2011 2964 2988
    • (2011) Information Sciences , vol.181 , Issue.14 , pp. 2964-2988
    • Zhang, X.1    Cheung, W.K.2    Li, C.H.3
  • 37
    • 84855443042 scopus 로고    scopus 로고
    • Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithm
    • R. Zhang, and C. Wu Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithm Information Sciences 188 2012 236 252
    • (2012) Information Sciences , vol.188 , pp. 236-252
    • Zhang, R.1    Wu, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.