메뉴 건너뛰기




Volumn 22, Issue 7, 2009, Pages 1005-1014

A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling

Author keywords

Distributed scheduling; Genetic algorithms; Multi factory production; Perfect maintenance; Production scheduling

Indexed keywords

DISTRIBUTED SCHEDULING; MACHINE MAINTENANCE; MAKESPAN; MODIFIED GENETIC ALGORITHMS; MULTI-FACTORY PRODUCTION; OPTIMAL PLAN; PERFECT MAINTENANCE; PRODUCTION SCHEDULE; PRODUCTION SCHEDULING; SCHEDULING PROBLEM; SYSTEM EFFICIENCY;

EID: 70149098664     PISSN: 09521976     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.engappai.2008.11.004     Document Type: Article
Times cited : (97)

References (47)
  • 1
    • 84937741596 scopus 로고
    • Evaluation of repairable system reliability using the 'bad-as-old' concept
    • Ascher H. Evaluation of repairable system reliability using the 'bad-as-old' concept. IEEE Transaction on Reliability 17 (1968) 103-110
    • (1968) IEEE Transaction on Reliability , vol.17 , pp. 103-110
    • Ascher, H.1
  • 4
    • 0025481509 scopus 로고
    • Manufacturing flow control and preventive maintenance a stochastic control approach
    • Boukas E.K., and Haurie A. Manufacturing flow control and preventive maintenance a stochastic control approach. IEEE Transactions on Automatic Control 33 9 (1990) 1024-1031
    • (1990) IEEE Transactions on Automatic Control , vol.33 , Issue.9 , pp. 1024-1031
    • Boukas, E.K.1    Haurie, A.2
  • 8
    • 41249096630 scopus 로고    scopus 로고
    • A framework to practical predictive maintenance modeling for multi-state systems
    • Cher M.T., and Nagarajan R. A framework to practical predictive maintenance modeling for multi-state systems. Reliability Engineering and System Safety 93 8 (2008) 1138-1150
    • (2008) Reliability Engineering and System Safety , vol.93 , Issue.8 , pp. 1138-1150
    • Cher, M.T.1    Nagarajan, R.2
  • 11
    • 0033737583 scopus 로고    scopus 로고
    • Production and preventive maintenance rates control for a manufacturing system: an experimental design approach
    • Gharbi A., and Kenne J.P. Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. International Journal of Production Economics 65 (2000) 275-287
    • (2000) International Journal of Production Economics , vol.65 , pp. 275-287
    • Gharbi, A.1    Kenne, J.P.2
  • 12
    • 0026904594 scopus 로고
    • Routing flexibility and production scheduling in a flexible manufacturing environment
    • Ghosh S., and Gaimon C. Routing flexibility and production scheduling in a flexible manufacturing environment. European Journal of Operational Research 60 (1992) 344-364
    • (1992) European Journal of Operational Research , vol.60 , pp. 344-364
    • Ghosh, S.1    Gaimon, C.2
  • 13
  • 15
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • Ji M., He Y., and Cheng T.C.E. Single-machine scheduling with periodic maintenance to minimize makespan. Computers and Operations Research 34 (2007) 1764-1770
    • (2007) Computers and Operations Research , vol.34 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 20
    • 0015110597 scopus 로고
    • Optimal redundancy and availability allocation in multistage systems
    • Lamber B.K., Walvekar A.G., and Hirmas J.P. Optimal redundancy and availability allocation in multistage systems. IEEE Transaction on Reliability 20 3 (1971) 182-185
    • (1971) IEEE Transaction on Reliability , vol.20 , Issue.3 , pp. 182-185
    • Lamber, B.K.1    Walvekar, A.G.2    Hirmas, J.P.3
  • 22
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using Petri nets and heuristic search
    • Lee D.Y., and DiCesare F. Scheduling flexible manufacturing systems using Petri nets and heuristic search. IEEE Transactions on Robotics and Automation 10 2 (1994) 123-132
    • (1994) IEEE Transactions on Robotics and Automation , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 24
    • 0142186077 scopus 로고    scopus 로고
    • Multi-site aggregate production planning with multiple objectives: a goal programming approach
    • Leung S.C.H., Wu Y., and Lai K.K. Multi-site aggregate production planning with multiple objectives: a goal programming approach. Production Planning and Control 14 5 (2003) 425-436
    • (2003) Production Planning and Control , vol.14 , Issue.5 , pp. 425-436
    • Leung, S.C.H.1    Wu, Y.2    Lai, K.K.3
  • 25
    • 0034135276 scopus 로고    scopus 로고
    • Optimization of imperfect preventive maintenance for multi-state systems
    • Levitin G., and Lisnianski A. Optimization of imperfect preventive maintenance for multi-state systems. Reliability Engineering and System Safety 67 (2000) 193-203
    • (2000) Reliability Engineering and System Safety , vol.67 , pp. 193-203
    • Levitin, G.1    Lisnianski, A.2
  • 26
    • 0034197610 scopus 로고    scopus 로고
    • Analysis of system reliability with dependent repair modes
    • Lim T.J., and Lee C.H. Analysis of system reliability with dependent repair modes. IEEE Transactions on Reliability 49 2 (2000) 153-162
    • (2000) IEEE Transactions on Reliability , vol.49 , Issue.2 , pp. 153-162
    • Lim, T.J.1    Lee, C.H.2
  • 27
    • 0018530396 scopus 로고
    • Optimum policies when preventive maintenance is imperfect
    • Nakagawa T. Optimum policies when preventive maintenance is imperfect. IEEE Transaction on Reliability 28 (1979) 331-332
    • (1979) IEEE Transaction on Reliability , vol.28 , pp. 331-332
    • Nakagawa, T.1
  • 29
    • 0037359219 scopus 로고    scopus 로고
    • Evaluation of a maintenance strategy by the analysis of the rate of repair
    • Peres F., and Noyes D. Evaluation of a maintenance strategy by the analysis of the rate of repair. Quality and Reliability Engineering International 19 (2003) 129-148
    • (2003) Quality and Reliability Engineering International , vol.19 , pp. 129-148
    • Peres, F.1    Noyes, D.2
  • 31
    • 31744447388 scopus 로고    scopus 로고
    • A comparison of machine-learning algorithms for dynamics scheduling of flexible manufacturing systems
    • Priore P., Fuente D., Puente J., and Parreno J. A comparison of machine-learning algorithms for dynamics scheduling of flexible manufacturing systems. Engineering Application of Artificial Intelligence 19 (2006) 247-255
    • (2006) Engineering Application of Artificial Intelligence , vol.19 , pp. 247-255
    • Priore, P.1    Fuente, D.2    Puente, J.3    Parreno, J.4
  • 32
    • 85016307418 scopus 로고    scopus 로고
    • Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level
    • Rishel T.D., and Christy D.P. Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level. International Journal of Production Research 34 2 (1996) 421-446
    • (1996) International Journal of Production Research , vol.34 , Issue.2 , pp. 421-446
    • Rishel, T.D.1    Christy, D.P.2
  • 33
    • 0034204917 scopus 로고    scopus 로고
    • Automated contracting in distributed manufacturing among independent companies
    • Sandholm T.W. Automated contracting in distributed manufacturing among independent companies. Journal of Intelligent Manufacturing 11 (2000) 271-283
    • (2000) Journal of Intelligent Manufacturing , vol.11 , pp. 271-283
    • Sandholm, T.W.1
  • 34
    • 85133749042 scopus 로고    scopus 로고
    • Agent-based systems for intelligent manufacturing: a state-of-the-art survey
    • Shen W., and Norrie D.H. Agent-based systems for intelligent manufacturing: a state-of-the-art survey. International Journal Knowledge and Information Systems 1 2 (1999) 129-156
    • (1999) International Journal Knowledge and Information Systems , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 35
    • 4344584596 scopus 로고    scopus 로고
    • Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system
    • Shnits B., Rubinovitz J., and Sinerich D. Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system. International Journal of Production Research 42 17 (2004) 3457-3472
    • (2004) International Journal of Production Research , vol.42 , Issue.17 , pp. 3457-3472
    • Shnits, B.1    Rubinovitz, J.2    Sinerich, D.3
  • 36
    • 0024769054 scopus 로고
    • Scheduling algorithms for flexible flowshop: worst and average case performance
    • Shriskandarajah C., and Sethi S.P. Scheduling algorithms for flexible flowshop: worst and average case performance. European Journal of Operational Research 43 (1989) 143-160
    • (1989) European Journal of Operational Research , vol.43 , pp. 143-160
    • Shriskandarajah, C.1    Sethi, S.P.2
  • 38
    • 0043167242 scopus 로고    scopus 로고
    • A multicriteria decision support system for dynamic task allocation in a distributed production activity control structure
    • Trentesaux D., Dindeleux R., and Tahon C. A multicriteria decision support system for dynamic task allocation in a distributed production activity control structure. International Journal of Computer Integrated Manufacturing 11 1 (1998) 3-17
    • (1998) International Journal of Computer Integrated Manufacturing , vol.11 , Issue.1 , pp. 3-17
    • Trentesaux, D.1    Dindeleux, R.2    Tahon, C.3
  • 39
    • 0035479768 scopus 로고    scopus 로고
    • Optimizing preventive maintenance for mechanical components using genetic algorithms
    • Tsai Y.T., Wang K.S., and Teng H.Y. Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliability Engineering and System Safety 74 (2001) 89-97
    • (2001) Reliability Engineering and System Safety , vol.74 , pp. 89-97
    • Tsai, Y.T.1    Wang, K.S.2    Teng, H.Y.3
  • 41
    • 0032649736 scopus 로고    scopus 로고
    • Theory and methodology failure rate distributions for flexible manufacturing systems: an empirical study
    • Vineyard M., Amoako-Gyampah K., and Meredith J.R. Theory and methodology failure rate distributions for flexible manufacturing systems: an empirical study. European Journal of Operational Research 116 (1999) 139-155
    • (1999) European Journal of Operational Research , vol.116 , pp. 139-155
    • Vineyard, M.1    Amoako-Gyampah, K.2    Meredith, J.R.3
  • 42
  • 43
  • 44
    • 33947614658 scopus 로고    scopus 로고
    • Evolutionary neural network modeling for forecasting the field failure data of repairable systems
    • Yi-Hui L. Evolutionary neural network modeling for forecasting the field failure data of repairable systems. Expert Systems with Applications 33 4 (2007) 1090-1096
    • (2007) Expert Systems with Applications , vol.33 , Issue.4 , pp. 1090-1096
    • Yi-Hui, L.1
  • 45
    • 0032297930 scopus 로고    scopus 로고
    • Reliability of consecutive-k-out-of-n: G repairable system
    • Zhang Y.L., and Lam Y. Reliability of consecutive-k-out-of-n: G repairable system. International Journal of Systems Science 29 (1998) 1375-1379
    • (1998) International Journal of Systems Science , vol.29 , pp. 1375-1379
    • Zhang, Y.L.1    Lam, Y.2
  • 46
    • 0030144962 scopus 로고    scopus 로고
    • Repairable consecutive-2-out-of-n: F system
    • Zhang Y.L., and Wang T.P. Repairable consecutive-2-out-of-n: F system. Microelectronic Reliability 36 (1996) 605-608
    • (1996) Microelectronic Reliability , vol.36 , pp. 605-608
    • Zhang, Y.L.1    Wang, T.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.