-
1
-
-
84937741596
-
Evaluation of repairable system reliability using the 'bad-as-old' concept
-
Ascher H. Evaluation of repairable system reliability using the 'bad-as-old' concept. IEEE Transaction on Reliability 17 (1968) 103-110
-
(1968)
IEEE Transaction on Reliability
, vol.17
, pp. 103-110
-
-
Ascher, H.1
-
4
-
-
0025481509
-
Manufacturing flow control and preventive maintenance a stochastic control approach
-
Boukas E.K., and Haurie A. Manufacturing flow control and preventive maintenance a stochastic control approach. IEEE Transactions on Automatic Control 33 9 (1990) 1024-1031
-
(1990)
IEEE Transactions on Automatic Control
, vol.33
, Issue.9
, pp. 1024-1031
-
-
Boukas, E.K.1
Haurie, A.2
-
7
-
-
33746855485
-
Solving distributed FMS scheduling problems subject to maintenance: genetic algorithm approach
-
Chan F.T.S., Chung S.H., Chan L.Y., Finke G., and Tiwari M.K. Solving distributed FMS scheduling problems subject to maintenance: genetic algorithm approach. Robotics and Computer-Integrated Manufacturing 22 (2006) 493-504
-
(2006)
Robotics and Computer-Integrated Manufacturing
, vol.22
, pp. 493-504
-
-
Chan, F.T.S.1
Chung, S.H.2
Chan, L.Y.3
Finke, G.4
Tiwari, M.K.5
-
8
-
-
41249096630
-
A framework to practical predictive maintenance modeling for multi-state systems
-
Cher M.T., and Nagarajan R. A framework to practical predictive maintenance modeling for multi-state systems. Reliability Engineering and System Safety 93 8 (2008) 1138-1150
-
(2008)
Reliability Engineering and System Safety
, vol.93
, Issue.8
, pp. 1138-1150
-
-
Cher, M.T.1
Nagarajan, R.2
-
11
-
-
0033737583
-
Production and preventive maintenance rates control for a manufacturing system: an experimental design approach
-
Gharbi A., and Kenne J.P. Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. International Journal of Production Economics 65 (2000) 275-287
-
(2000)
International Journal of Production Economics
, vol.65
, pp. 275-287
-
-
Gharbi, A.1
Kenne, J.P.2
-
12
-
-
0026904594
-
Routing flexibility and production scheduling in a flexible manufacturing environment
-
Ghosh S., and Gaimon C. Routing flexibility and production scheduling in a flexible manufacturing environment. European Journal of Operational Research 60 (1992) 344-364
-
(1992)
European Journal of Operational Research
, vol.60
, pp. 344-364
-
-
Ghosh, S.1
Gaimon, C.2
-
13
-
-
0038112232
-
Production planning of a multi-site manufacturing system by hybrid modelling: a case study from the automotive industry
-
Gnonia M.G., Iavagnilioa R., Mossaa G., Mummoloa G., and Di Leva A. Production planning of a multi-site manufacturing system by hybrid modelling: a case study from the automotive industry. International Journal of Production Economics 85 (2003) 251-262
-
(2003)
International Journal of Production Economics
, vol.85
, pp. 251-262
-
-
Gnonia, M.G.1
Iavagnilioa, R.2
Mossaa, G.3
Mummoloa, G.4
Di Leva, A.5
-
15
-
-
33749681702
-
Single-machine scheduling with periodic maintenance to minimize makespan
-
Ji M., He Y., and Cheng T.C.E. Single-machine scheduling with periodic maintenance to minimize makespan. Computers and Operations Research 34 (2007) 1764-1770
-
(2007)
Computers and Operations Research
, vol.34
, pp. 1764-1770
-
-
Ji, M.1
He, Y.2
Cheng, T.C.E.3
-
16
-
-
0036507916
-
Web-based multi-functional scheduling system for a distributed manufacturing environment
-
Jia H.Z., Fuh J.Y.H., Nee A.Y.C., and Zheng Y.F. Web-based multi-functional scheduling system for a distributed manufacturing environment. Concurrent Engineering: Research and Applications 10 1 (2002) 27-39
-
(2002)
Concurrent Engineering: Research and Applications
, vol.10
, Issue.1
, pp. 27-39
-
-
Jia, H.Z.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
Zheng, Y.F.4
-
18
-
-
0030397154
-
A distributed scheduling and shop floor control method
-
Kim K.H., Bae J.W., Song J.Y., and Lee H.Y. A distributed scheduling and shop floor control method. Computer Industrial Engineering 31 3/4 (1996) 583-586
-
(1996)
Computer Industrial Engineering
, vol.31
, Issue.3-4
, pp. 583-586
-
-
Kim, K.H.1
Bae, J.W.2
Song, J.Y.3
Lee, H.Y.4
-
20
-
-
0015110597
-
Optimal redundancy and availability allocation in multistage systems
-
Lamber B.K., Walvekar A.G., and Hirmas J.P. Optimal redundancy and availability allocation in multistage systems. IEEE Transaction on Reliability 20 3 (1971) 182-185
-
(1971)
IEEE Transaction on Reliability
, vol.20
, Issue.3
, pp. 182-185
-
-
Lamber, B.K.1
Walvekar, A.G.2
Hirmas, J.P.3
-
21
-
-
33646184522
-
A performance benchmarking system to support supplier selection
-
Lau H.C.W., Lee C.K.M., Ho G.T.S., Pun K.F., and Choy K.L. A performance benchmarking system to support supplier selection. International Journal of Business Performance Management 8 2/3 (2006) 132-151
-
(2006)
International Journal of Business Performance Management
, vol.8
, Issue.2-3
, pp. 132-151
-
-
Lau, H.C.W.1
Lee, C.K.M.2
Ho, G.T.S.3
Pun, K.F.4
Choy, K.L.5
-
22
-
-
0028413979
-
Scheduling flexible manufacturing systems using Petri nets and heuristic search
-
Lee D.Y., and DiCesare F. Scheduling flexible manufacturing systems using Petri nets and heuristic search. IEEE Transactions on Robotics and Automation 10 2 (1994) 123-132
-
(1994)
IEEE Transactions on Robotics and Automation
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
DiCesare, F.2
-
24
-
-
0142186077
-
Multi-site aggregate production planning with multiple objectives: a goal programming approach
-
Leung S.C.H., Wu Y., and Lai K.K. Multi-site aggregate production planning with multiple objectives: a goal programming approach. Production Planning and Control 14 5 (2003) 425-436
-
(2003)
Production Planning and Control
, vol.14
, Issue.5
, pp. 425-436
-
-
Leung, S.C.H.1
Wu, Y.2
Lai, K.K.3
-
25
-
-
0034135276
-
Optimization of imperfect preventive maintenance for multi-state systems
-
Levitin G., and Lisnianski A. Optimization of imperfect preventive maintenance for multi-state systems. Reliability Engineering and System Safety 67 (2000) 193-203
-
(2000)
Reliability Engineering and System Safety
, vol.67
, pp. 193-203
-
-
Levitin, G.1
Lisnianski, A.2
-
26
-
-
0034197610
-
Analysis of system reliability with dependent repair modes
-
Lim T.J., and Lee C.H. Analysis of system reliability with dependent repair modes. IEEE Transactions on Reliability 49 2 (2000) 153-162
-
(2000)
IEEE Transactions on Reliability
, vol.49
, Issue.2
, pp. 153-162
-
-
Lim, T.J.1
Lee, C.H.2
-
27
-
-
0018530396
-
Optimum policies when preventive maintenance is imperfect
-
Nakagawa T. Optimum policies when preventive maintenance is imperfect. IEEE Transaction on Reliability 28 (1979) 331-332
-
(1979)
IEEE Transaction on Reliability
, vol.28
, pp. 331-332
-
-
Nakagawa, T.1
-
28
-
-
0042363413
-
Integrating industrial maintenance strategy into ERP
-
Nikolopoulos K., Metaxiotis K., Lekatis N., and Assimakopoulos V. Integrating industrial maintenance strategy into ERP. Industrial Management & Data Systems 103 3 (2003) 184-191
-
(2003)
Industrial Management & Data Systems
, vol.103
, Issue.3
, pp. 184-191
-
-
Nikolopoulos, K.1
Metaxiotis, K.2
Lekatis, N.3
Assimakopoulos, V.4
-
29
-
-
0037359219
-
Evaluation of a maintenance strategy by the analysis of the rate of repair
-
Peres F., and Noyes D. Evaluation of a maintenance strategy by the analysis of the rate of repair. Quality and Reliability Engineering International 19 (2003) 129-148
-
(2003)
Quality and Reliability Engineering International
, vol.19
, pp. 129-148
-
-
Peres, F.1
Noyes, D.2
-
32
-
-
85016307418
-
Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level
-
Rishel T.D., and Christy D.P. Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level. International Journal of Production Research 34 2 (1996) 421-446
-
(1996)
International Journal of Production Research
, vol.34
, Issue.2
, pp. 421-446
-
-
Rishel, T.D.1
Christy, D.P.2
-
33
-
-
0034204917
-
Automated contracting in distributed manufacturing among independent companies
-
Sandholm T.W. Automated contracting in distributed manufacturing among independent companies. Journal of Intelligent Manufacturing 11 (2000) 271-283
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, pp. 271-283
-
-
Sandholm, T.W.1
-
34
-
-
85133749042
-
Agent-based systems for intelligent manufacturing: a state-of-the-art survey
-
Shen W., and Norrie D.H. Agent-based systems for intelligent manufacturing: a state-of-the-art survey. International Journal Knowledge and Information Systems 1 2 (1999) 129-156
-
(1999)
International Journal Knowledge and Information Systems
, vol.1
, Issue.2
, pp. 129-156
-
-
Shen, W.1
Norrie, D.H.2
-
35
-
-
4344584596
-
Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system
-
Shnits B., Rubinovitz J., and Sinerich D. Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system. International Journal of Production Research 42 17 (2004) 3457-3472
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3457-3472
-
-
Shnits, B.1
Rubinovitz, J.2
Sinerich, D.3
-
36
-
-
0024769054
-
Scheduling algorithms for flexible flowshop: worst and average case performance
-
Shriskandarajah C., and Sethi S.P. Scheduling algorithms for flexible flowshop: worst and average case performance. European Journal of Operational Research 43 (1989) 143-160
-
(1989)
European Journal of Operational Research
, vol.43
, pp. 143-160
-
-
Shriskandarajah, C.1
Sethi, S.P.2
-
38
-
-
0043167242
-
A multicriteria decision support system for dynamic task allocation in a distributed production activity control structure
-
Trentesaux D., Dindeleux R., and Tahon C. A multicriteria decision support system for dynamic task allocation in a distributed production activity control structure. International Journal of Computer Integrated Manufacturing 11 1 (1998) 3-17
-
(1998)
International Journal of Computer Integrated Manufacturing
, vol.11
, Issue.1
, pp. 3-17
-
-
Trentesaux, D.1
Dindeleux, R.2
Tahon, C.3
-
39
-
-
0035479768
-
Optimizing preventive maintenance for mechanical components using genetic algorithms
-
Tsai Y.T., Wang K.S., and Teng H.Y. Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliability Engineering and System Safety 74 (2001) 89-97
-
(2001)
Reliability Engineering and System Safety
, vol.74
, pp. 89-97
-
-
Tsai, Y.T.1
Wang, K.S.2
Teng, H.Y.3
-
41
-
-
0032649736
-
Theory and methodology failure rate distributions for flexible manufacturing systems: an empirical study
-
Vineyard M., Amoako-Gyampah K., and Meredith J.R. Theory and methodology failure rate distributions for flexible manufacturing systems: an empirical study. European Journal of Operational Research 116 (1999) 139-155
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 139-155
-
-
Vineyard, M.1
Amoako-Gyampah, K.2
Meredith, J.R.3
-
44
-
-
33947614658
-
Evolutionary neural network modeling for forecasting the field failure data of repairable systems
-
Yi-Hui L. Evolutionary neural network modeling for forecasting the field failure data of repairable systems. Expert Systems with Applications 33 4 (2007) 1090-1096
-
(2007)
Expert Systems with Applications
, vol.33
, Issue.4
, pp. 1090-1096
-
-
Yi-Hui, L.1
-
45
-
-
0032297930
-
Reliability of consecutive-k-out-of-n: G repairable system
-
Zhang Y.L., and Lam Y. Reliability of consecutive-k-out-of-n: G repairable system. International Journal of Systems Science 29 (1998) 1375-1379
-
(1998)
International Journal of Systems Science
, vol.29
, pp. 1375-1379
-
-
Zhang, Y.L.1
Lam, Y.2
-
46
-
-
0030144962
-
Repairable consecutive-2-out-of-n: F system
-
Zhang Y.L., and Wang T.P. Repairable consecutive-2-out-of-n: F system. Microelectronic Reliability 36 (1996) 605-608
-
(1996)
Microelectronic Reliability
, vol.36
, pp. 605-608
-
-
Zhang, Y.L.1
Wang, T.P.2
|