메뉴 건너뛰기




Volumn 44, Issue 12, 2012, Pages 1083-1099

Real-time decision support for assembly and test operations in semiconductor manufacturing

Author keywords

machine setup; optimization; Real time control; semiconductor assembly and test

Indexed keywords

DECISION SUPPORTS; DUE DATES; HIGH-QUALITY SOLUTIONS; MACHINE SETUP; MIXED-INTEGER PROGRAMMING; OPTIMIZATION MODELS; REAL TIME; SEMICONDUCTOR ASSEMBLY; SEMICONDUCTOR MANUFACTURERS; SEMICONDUCTOR MANUFACTURING; TEST OPERATIONS; WORK-IN-PROCESS;

EID: 84866618759     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/0740817X.2012.663519     Document Type: Article
Times cited : (3)

References (17)
  • 1
    • 33645679210 scopus 로고    scopus 로고
    • A branch & price algorithm for parallel machine scheduling with time windows and job priorities
    • Bard, J.F. and Rojanasoonthon, S. (2006) A branch & price algorithm for parallel machine scheduling with time windows and job priorities. Naval Research Logistics, 53(1), 24-44.
    • (2006) Naval Research Logistics , vol.53 , Issue.1 , pp. 24-44
    • Bard, J.F.1    Rojanasoonthon, S.2
  • 2
    • 46149088515 scopus 로고    scopus 로고
    • Adaptive scheduling and tool flow control in flexible job shops
    • Chen, J. and Chen, F.F. (2008) Adaptive scheduling and tool flow control in flexible job shops. International Journal of Production Research, 46(15), 4035-4059.
    • (2008) International Journal of Production Research , vol.46 , Issue.15 , pp. 4035-4059
    • Chen, J.1    Chen, F.F.2
  • 3
    • 70449642707 scopus 로고    scopus 로고
    • Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes
    • Chung, S.H., Tai, Y.T. and Pearn,W.L. (2009) Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes. International Journal of ProductionResearch, 47(18), 5109-5128.
    • (2009) International Journal of ProductionResearch , vol.47 , Issue.18 , pp. 5109-5128
    • Chung, S.H.1    Tai, Y.T.2    Pearn, W.L.3
  • 6
    • 0026367689 scopus 로고
    • A GRASP for a difficult single machine scheduling problem
    • Feo, T.A., Venkatraman, K. and Bard, J.F. (1991) A GRASP for a difficult single machine scheduling problem. Computers & Operations Research, 18(8), 635-643.
    • (1991) Computers & Operations Research , vol.18 , Issue.8 , pp. 635-643
    • Feo, T.A.1    Venkatraman, K.2    Bard, J.F.3
  • 7
    • 34848842797 scopus 로고    scopus 로고
    • In-house development of scheduling decision support systems: Case study for scheduling semiconductor device test operations
    • DOI 10.1080/00207540600818351, PII 770289102
    • Freed, T., Doerr, K.H. and Chang, T. (2006) In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations. International Journal of Production Research, 45(21), 5075-5093. (Pubitemid 47507499)
    • (2007) International Journal of Production Research , vol.45 , Issue.21 , pp. 5075-5093
    • Freed, T.1    Doerr, K.H.2    Chang, T.3
  • 9
    • 70449587606 scopus 로고    scopus 로고
    • Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines
    • Jia, J. and Mason, S.J. (2009) Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. International Journal of Production Research, 47(10), 2565-2585.
    • (2009) International Journal of Production Research , vol.47 , Issue.10 , pp. 2565-2585
    • Jia, J.1    Mason, S.J.2
  • 10
    • 74549135706 scopus 로고    scopus 로고
    • An adaptive scheduling algorithm for a parallel machine problem with rework processes
    • Kang, Y.H. and Shin, H.J. (2010) An adaptive scheduling algorithm for a parallel machine problem with rework processes. International Journal of Production Research, 48(1), 95-115.
    • (2010) International Journal of Production Research , vol.48 , Issue.1 , pp. 95-115
    • Kang, Y.H.1    Shin, H.J.2
  • 12
    • 78650633737 scopus 로고    scopus 로고
    • Rule-based forecasting and production control systems design utilizing a feedback control structure
    • Liu, H., Zabinsky, Z.B. and Kohn, W. (2011) Rule-based forecasting and production control systems design utilizing a feedback control structure. IIE Transactions on Operations Engineering & Analysis, 43(2), 143-152.
    • (2011) IIE Transactions on Operations Engineering & Analysis , vol.43 , Issue.2 , pp. 143-152
    • Liu, H.1    Zabinsky, Z.B.2    Kohn, W.3
  • 13
    • 41449109607 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with setup times and ready times
    • DOI 10.1016/j.cie.2007.08.011, PII S036083520700229X
    • Pfund, M.,Fowler, J.W.,Gadkari,A. and Chen,Y. (2008) Scheduling jobs on parallel machines with setup times and ready times. Computers & Industrial Engineering, 54(4), 764-782. (Pubitemid 351458378)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 764-782
    • Pfund, M.1    Fowler, J.W.2    Gadkari, A.3    Chen, Y.4
  • 14
    • 67649794649 scopus 로고    scopus 로고
    • Capacitated lot-sizing and scheduling with parallel machines, back-orders and setup carry-over
    • Quadt, D. and Kuhn, H. (2009) Capacitated lot-sizing and scheduling with parallel machines, back-orders and setup carry-over. Naval Research Logistics, 56(4), 366-384.
    • (2009) Naval Research Logistics , vol.56 , Issue.4 , pp. 366-384
    • Quadt, D.1    Kuhn, H.2
  • 15
    • 35348867629 scopus 로고    scopus 로고
    • Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization
    • DOI 10.1109/TASE.2007.906341
    • Song, Y., Zhang, M.T., Yi, J., Zhang, L. and Zheng, L. (2007) Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization, IEEE Transactions on Automation Science and Engineering, 4(4), 569-578. (Pubitemid 47573851)
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.4 , pp. 569-578
    • Song, Y.1    Zhang, M.T.2    Yi, J.3    Zhang, L.4    Zheng, L.5
  • 16
    • 35348924466 scopus 로고    scopus 로고
    • Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing
    • DOI 10.1109/TASE.2007.905977
    • Zhang, M.T., Niu, S., Deng, S., Zhang, Z., Li, Q. and Zheng, L. (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing, IEEE Transactions on Automation Science and Engineering, 4(4), 543-552. (Pubitemid 47573849)
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.4 , pp. 543-552
    • Zhang, M.T.1    Niu, S.2    Deng, S.3    Zhang, Z.4    Li, Q.5    Zheng, L.6
  • 17
    • 21444433839 scopus 로고    scopus 로고
    • Comparative approaches to equipment scheduling in high volume factories
    • DOI 10.1016/j.cor.2004.07.003, PII S0305054804001595
    • Zhang, X. and Bard, J.F. (2006) Comparative approaches to equipment scheduling in high volume factories. Computers & Operations Research, 33(1), 132-157. (Pubitemid 40915204)
    • (2006) Computers and Operations Research , vol.33 , Issue.1 , pp. 132-157
    • Zhang, X.1    Bard, J.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.