-
1
-
-
33645679210
-
A branch & price algorithm for parallel machine scheduling with time windows and job priorities
-
Bard, J.F. and Rojanasoonthon, S. (2006) A branch & price algorithm for parallel machine scheduling with time windows and job priorities. Naval Research Logistics, 53(1), 24-44.
-
(2006)
Naval Research Logistics
, vol.53
, Issue.1
, pp. 24-44
-
-
Bard, J.F.1
Rojanasoonthon, S.2
-
2
-
-
46149088515
-
Adaptive scheduling and tool flow control in flexible job shops
-
Chen, J. and Chen, F.F. (2008) Adaptive scheduling and tool flow control in flexible job shops. International Journal of Production Research, 46(15), 4035-4059.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.15
, pp. 4035-4059
-
-
Chen, J.1
Chen, F.F.2
-
3
-
-
70449642707
-
Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes
-
Chung, S.H., Tai, Y.T. and Pearn,W.L. (2009) Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes. International Journal of ProductionResearch, 47(18), 5109-5128.
-
(2009)
International Journal of ProductionResearch
, vol.47
, Issue.18
, pp. 5109-5128
-
-
Chung, S.H.1
Tai, Y.T.2
Pearn, W.L.3
-
4
-
-
77951983322
-
Scheduling backend operations in semiconductor manufacturing
-
Deng, Y., Bard, J.F., Chacon, R. and Stuber, J. (2010) Scheduling backend operations in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 23(2), 210-220.
-
(2010)
IEEE Transactions on Semiconductor Manufacturing
, vol.23
, Issue.2
, pp. 210-220
-
-
Deng, Y.1
Bard, J.F.2
Chacon, R.3
Stuber, J.4
-
6
-
-
0026367689
-
A GRASP for a difficult single machine scheduling problem
-
Feo, T.A., Venkatraman, K. and Bard, J.F. (1991) A GRASP for a difficult single machine scheduling problem. Computers & Operations Research, 18(8), 635-643.
-
(1991)
Computers & Operations Research
, vol.18
, Issue.8
, pp. 635-643
-
-
Feo, T.A.1
Venkatraman, K.2
Bard, J.F.3
-
7
-
-
34848842797
-
In-house development of scheduling decision support systems: Case study for scheduling semiconductor device test operations
-
DOI 10.1080/00207540600818351, PII 770289102
-
Freed, T., Doerr, K.H. and Chang, T. (2006) In-house development of scheduling decision support systems: case study for scheduling semiconductor device test operations. International Journal of Production Research, 45(21), 5075-5093. (Pubitemid 47507499)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.21
, pp. 5075-5093
-
-
Freed, T.1
Doerr, K.H.2
Chang, T.3
-
9
-
-
70449587606
-
Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines
-
Jia, J. and Mason, S.J. (2009) Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines. International Journal of Production Research, 47(10), 2565-2585.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.10
, pp. 2565-2585
-
-
Jia, J.1
Mason, S.J.2
-
10
-
-
74549135706
-
An adaptive scheduling algorithm for a parallel machine problem with rework processes
-
Kang, Y.H. and Shin, H.J. (2010) An adaptive scheduling algorithm for a parallel machine problem with rework processes. International Journal of Production Research, 48(1), 95-115.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.1
, pp. 95-115
-
-
Kang, Y.H.1
Shin, H.J.2
-
11
-
-
0033350351
-
Lot-to-order matching for a semiconductor assembly and test facility
-
DOI 10.1023/A:1007635927265
-
Knutson, K., Kempf, K., Fowler, J.W. and Carlyle, M. (1999) Lot-toorder matching for a semiconductor assembly and test facility. IIE Transactions on Scheduling & Logistics, 31(11), 1103-1111. (Pubitemid 30523919)
-
(1999)
IIE Transactions (Institute of Industrial Engineers)
, vol.31
, Issue.11
, pp. 1103-1111
-
-
Knutson, K.1
Kempf, K.2
Fowler, J.3
Carlyle, M.4
-
12
-
-
78650633737
-
Rule-based forecasting and production control systems design utilizing a feedback control structure
-
Liu, H., Zabinsky, Z.B. and Kohn, W. (2011) Rule-based forecasting and production control systems design utilizing a feedback control structure. IIE Transactions on Operations Engineering & Analysis, 43(2), 143-152.
-
(2011)
IIE Transactions on Operations Engineering & Analysis
, vol.43
, Issue.2
, pp. 143-152
-
-
Liu, H.1
Zabinsky, Z.B.2
Kohn, W.3
-
13
-
-
41449109607
-
Scheduling jobs on parallel machines with setup times and ready times
-
DOI 10.1016/j.cie.2007.08.011, PII S036083520700229X
-
Pfund, M.,Fowler, J.W.,Gadkari,A. and Chen,Y. (2008) Scheduling jobs on parallel machines with setup times and ready times. Computers & Industrial Engineering, 54(4), 764-782. (Pubitemid 351458378)
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.4
, pp. 764-782
-
-
Pfund, M.1
Fowler, J.W.2
Gadkari, A.3
Chen, Y.4
-
14
-
-
67649794649
-
Capacitated lot-sizing and scheduling with parallel machines, back-orders and setup carry-over
-
Quadt, D. and Kuhn, H. (2009) Capacitated lot-sizing and scheduling with parallel machines, back-orders and setup carry-over. Naval Research Logistics, 56(4), 366-384.
-
(2009)
Naval Research Logistics
, vol.56
, Issue.4
, pp. 366-384
-
-
Quadt, D.1
Kuhn, H.2
-
15
-
-
35348867629
-
Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization
-
DOI 10.1109/TASE.2007.906341
-
Song, Y., Zhang, M.T., Yi, J., Zhang, L. and Zheng, L. (2007) Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization, IEEE Transactions on Automation Science and Engineering, 4(4), 569-578. (Pubitemid 47573851)
-
(2007)
IEEE Transactions on Automation Science and Engineering
, vol.4
, Issue.4
, pp. 569-578
-
-
Song, Y.1
Zhang, M.T.2
Yi, J.3
Zhang, L.4
Zheng, L.5
-
16
-
-
35348924466
-
Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing
-
DOI 10.1109/TASE.2007.905977
-
Zhang, M.T., Niu, S., Deng, S., Zhang, Z., Li, Q. and Zheng, L. (2007) Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing, IEEE Transactions on Automation Science and Engineering, 4(4), 543-552. (Pubitemid 47573849)
-
(2007)
IEEE Transactions on Automation Science and Engineering
, vol.4
, Issue.4
, pp. 543-552
-
-
Zhang, M.T.1
Niu, S.2
Deng, S.3
Zhang, Z.4
Li, Q.5
Zheng, L.6
-
17
-
-
21444433839
-
Comparative approaches to equipment scheduling in high volume factories
-
DOI 10.1016/j.cor.2004.07.003, PII S0305054804001595
-
Zhang, X. and Bard, J.F. (2006) Comparative approaches to equipment scheduling in high volume factories. Computers & Operations Research, 33(1), 132-157. (Pubitemid 40915204)
-
(2006)
Computers and Operations Research
, vol.33
, Issue.1
, pp. 132-157
-
-
Zhang, X.1
Bard, J.F.2
|