-
1
-
-
0037694027
-
A problem space algorithm for single machine weighted tardiness problems
-
Avic, S., Akturk, M.S., and Storer, R.H., 2003. A problem space algorithm for single machine weighted tardiness problems. HE Transactions, 35 (5), 479-186.
-
(2003)
HE Transactions
, vol.35
, Issue.5
, pp. 479-186
-
-
Avic, S.1
Akturk, M.S.2
Storer, R.H.3
-
2
-
-
0036275691
-
Planning and control of rework in the process industries: Review
-
Flapper, S.D.P., et al., 2002. Planning and control of rework in the process industries: review. Production Planning & Control, 13 (1), 26-34.
-
(2002)
Production Planning & Control
, vol.13
, Issue.1
, pp. 26-34
-
-
Flapper, S.D.P.1
-
3
-
-
0142216509
-
Scheduling jobs on parallel machines: A restricted tabu search approach
-
Kim, C.O. and Shin, H.J., 2003. Scheduling jobs on parallel machines: a restricted tabu search approach. International Journal of Advanced Manufacturing Technology, 22 (3-4), 278-287.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.22
, Issue.3-4
, pp. 278-287
-
-
Kim, C.O.1
Shin, H.J.2
-
4
-
-
4544279493
-
A simulation study of dispatching rules and rework strategies in semiconductor manufacturing
-
May, Boston, Massachusetts, USA
-
Kuhl, M.E. and Laubisch, G.R., 2004. A simulation study of dispatching rules and rework strategies in semiconductor manufacturing. In: IEEE/SEMI advanced semiconductor manufacturing conference 4-6 May 2004, Boston, Massachusetts, USA, 325-329.
-
(2004)
IEEE/SEMI advanced semiconductor manufacturing conference 4-6
, pp. 325-329
-
-
Kuhl, M.E.1
Laubisch, G.R.2
-
5
-
-
0035427202
-
An adaptable problem-space based search method for flexible flow line scheduling
-
Kurz, M.E. and Askin, R.G., 2001. An adaptable problem-space based search method for flexible flow line scheduling. IIE Transactions, 33 (8), 691-693.
-
(2001)
IIE Transactions
, vol.33
, Issue.8
, pp. 691-693
-
-
Kurz, M.E.1
Askin, R.G.2
-
6
-
-
0030735290
-
A heuristic to minimize the total weighted tardiness with sequence-dependent setups
-
Lee, Y.H., Bhaskran, K., and Pinedo, M., 1997. A heuristic to minimize the total weighted tardiness with sequence-dependent setups. IIE Transactions, 29 (1), 45-52.
-
(1997)
IIE Transactions
, vol.29
, Issue.1
, pp. 45-52
-
-
Lee, Y.H.1
Bhaskran, K.2
Pinedo, M.3
-
7
-
-
33845274958
-
Strength and adaptability of problem-space- based neighborhoods for resource-constrained scheduling
-
Leon, V.J. and Ramamoorthy, B., 1995. Strength and adaptability of problem-space- based neighborhoods for resource-constrained scheduling. OR Spektrum, 17 (2), 173-182.
-
(1995)
OR Spektrum
, vol.17
, Issue.2
, pp. 173-182
-
-
Leon, V.J.1
Ramamoorthy, B.2
-
8
-
-
0031073792
-
An adaptable problem-space based search method for flexible flow line scheduling
-
Leon, V.J. and Ramamoorthy, B., 1997. An adaptable problem-space based search method for flexible flow line scheduling. IIE Transactions, 29 (2), 115-125.
-
(1997)
IIE Transactions
, vol.29
, Issue.2
, pp. 115-125
-
-
Leon, V.J.1
Ramamoorthy, B.2
-
9
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
-
Ovacik, I.M. and Uzsoy, R., 1995. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. International Journal of Production Research, 33 (11), 3173-3192.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3173-3192
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
10
-
-
0033717569
-
Scheduling jobs on parallel machines applying neural network and heuristic rules
-
Park, Y.S., Kim, S.Y., and Lee, Y.H., 2000. Scheduling jobs on parallel machines applying neural network and heuristic rules. Computers & Industrial Engineering, 38 (1), 189-202.
-
(2000)
Computers & Industrial Engineering
, vol.38
, Issue.1
, pp. 189-202
-
-
Park, Y.S.1
Kim, S.Y.2
Lee, Y.H.3
-
11
-
-
12344285964
-
Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
-
Ruiz, R., Maroto, C., and Alcaraz, J., 2005. Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. European Journal of Operational Research, 165 (1), 34-54.
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.1
, pp. 34-54
-
-
Ruiz, R.1
Maroto, C.2
Alcaraz, J.3
-
12
-
-
33747781379
-
A dispatching rule for photolithography scheduling with an online rework strategy
-
Sha, D.Y., et al., 2006. A dispatching rule for photolithography scheduling with an online rework strategy. Computers & Industrial Engineering, 50 (3), 233-247.
-
(2006)
Computers & Industrial Engineering
, vol.50
, Issue.3
, pp. 233-247
-
-
Sha, D.Y.1
-
13
-
-
0036062266
-
A tabu search algorithm for single machine scheduling with release times, due dates, and sequence-dependent set-up times
-
Shin, H.J., Kim, C.O., and Kim, S.S., 2002. A tabu search algorithm for single machine scheduling with release times, due dates, and sequence-dependent set-up times. International Journal of Advanced Manufacturing Technology, 19 (11), 859-866.
-
(2002)
International Journal of Advanced Manufacturing Technology
, vol.19
, Issue.11
, pp. 859-866
-
-
Shin, H.J.1
Kim, C.O.2
Kim, S.S.3
-
14
-
-
0026930899
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer, R.H., Wu, S.D., and Vaccari, R., 1992. New search spaces for sequencing problems with application to job shop scheduling. Management Science, 38 (10), 1495-1509.
-
(1992)
Management Science
, vol.38
, Issue.10
, pp. 1495-1509
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
15
-
-
0043234602
-
A problem space algorithm in multi-objective optimization
-
Turkcan, A. and Akturk, M.S., 2003. A problem space algorithm in multi-objective optimization. Journal of Intelligent Manufacturing, 14 (3-4), 363-378.
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.3-4
, pp. 363-378
-
-
Turkcan, A.1
Akturk, M.S.2
|