메뉴 건너뛰기




Volumn 21, Issue 5, 2012, Pages 923-938

An evaluation of the NERJIT priority rule in a kanban-controlled flowshop

Author keywords

flowshops; Just In Time; priority rule; simulation

Indexed keywords


EID: 84866394348     PISSN: 10591478     EISSN: 19375956     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2012.01323.x     Document Type: Article
Times cited : (9)

References (55)
  • 1
    • 0032306745 scopus 로고    scopus 로고
    • Adaptation of JIT phylosophy and kanban technique to a small-sized manufacturing firm; a project management approach
    • PII S0360835298001235
    • Abdul-Nour, G., S. Lambert, J. Drolet,. 1998. Adaptation of JIT philosophy and kanban technique to a small-sized manufacturing firm: A project management approach. Comput. Ind. Eng. 35 (3-4): 419-422. (Pubitemid 128674743)
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.3-4 , pp. 419-422
    • Abdul-Nour, G.1    Lambert, S.2    Drolet, J.3
  • 2
    • 33947159533 scopus 로고    scopus 로고
    • An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain
    • DOI 10.1016/j.ejor.2006.06.037, PII S037722170600498X
    • Aigbedo, H., 2007. An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain. Eur. J. Oper. Res. 181 (2): 704-715. (Pubitemid 46413588)
    • (2007) European Journal of Operational Research , vol.181 , Issue.2 , pp. 704-715
    • Aigbedo, H.1
  • 4
    • 0031529082 scopus 로고    scopus 로고
    • Analysis of local decision rules in a dual-kanban flow shop
    • Ardalan, A., 1997. Analysis of local decision rules in a dual-kanban flow shop. Decis. Sci. 28 (1): 195-211. (Pubitemid 127341481)
    • (1997) Decision Sciences , vol.28 , Issue.1 , pp. 195-211
    • Ardalan, A.1
  • 5
    • 84860862424 scopus 로고    scopus 로고
    • NERJIT: Using net requirement data in kanban-controlled jumbled-flow shops
    • Forthcoming.
    • Ardalan, A., R. Diaz,. 2012. NERJIT: Using net requirement data in kanban-controlled jumbled-flow shops. Prod. Oper. Manag., Forthcoming.
    • (2012) Prod. Oper. Manag.
    • Ardalan, A.1    Diaz, R.2
  • 6
    • 28044435648 scopus 로고    scopus 로고
    • Design of practical optimum JIT systems by integration of computer simulation and analysis of variance
    • DOI 10.1016/j.cie.2005.03.005, PII S0360835205001087
    • Azadeh, A., B. Bidokhti, S. M. R. Sakkaki,. 2005. Design of practical optimum JIT systems by integration of computer simulation and analysis of variance. Comput. Ind. Eng. 49 (4): 504-519. (Pubitemid 41689976)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.4 , pp. 504-519
    • Azadeh, A.1    Bidokhti, B.2    Sakkaki, S.M.R.3
  • 7
    • 33645050778 scopus 로고
    • Information technologies and business value: An analytic and empirical investigation
    • Barua, A., C. H. Kriebel, T. Mukhopadhyay,. 1995. Information technologies and business value: An analytic and empirical investigation. Inf. Syst. Res. 6 (1): 3-23.
    • (1995) Inf. Syst. Res. , vol.6 , Issue.1 , pp. 3-23
    • Barua, A.1    Kriebel, C.H.2    Mukhopadhyay, T.3
  • 8
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban-controlled flow shop
    • Berkley, B. J., A. S. Kiran,. 1991. A simulation study of sequencing rules in a kanban-controlled flow shop. Decis. Sci. 22 (3): 559-582.
    • (1991) Decis. Sci. , vol.22 , Issue.3 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 9
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., D. T. Phillips, G. L. Hogg,. 1982. A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20 (1): 27-45.
    • (1982) Int. J. Prod. Res. , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 10
    • 0034249441 scopus 로고    scopus 로고
    • Supply chain inventory management and the value of shared information
    • Cachon, G. P., M. Fisher,. 2000. Supply chain inventory management and the value of shared information. Manage. Sci. 46 (8): 1032-1048.
    • (2000) Manage. Sci. , vol.46 , Issue.8 , pp. 1032-1048
    • Cachon, G.P.1    Fisher, M.2
  • 11
    • 19944408941 scopus 로고    scopus 로고
    • Build-to-order and just-in-time as predictors of applied supply chain knowledge and market performance
    • DOI 10.1016/j.jom.2004.10.007, PII S0272696304001202, The Build to Order Chain (BOSC) A Competitive Strategy for the 21st Century
    • Christensen, W. J., R. Germain, L. Birou,. 2005. Build-to-order and just-in-time as predictors of applied supply chain knowledge and market performance. J. Oper. Manag. 23 (5): 470-481. (Pubitemid 40752693)
    • (2005) Journal of Operations Management , vol.23 , Issue.5 , pp. 470-481
    • Christensen, W.J.1    Germain, R.2    Birou, L.3
  • 12
    • 1642436941 scopus 로고    scopus 로고
    • From supply chain to demand chain: The role of lead time reduction in improving demand chain performance
    • de Treville, S., R. D. Shapiro, A. Hameri,. 2004. From supply chain to demand chain: The role of lead time reduction in improving demand chain performance. J. Oper. Manag. 21 (6): 613-627.
    • (2004) J. Oper. Manag. , vol.21 , Issue.6 , pp. 613-627
    • De Treville, S.1    Shapiro, R.D.2    Hameri, A.3
  • 13
    • 77950939808 scopus 로고    scopus 로고
    • An analysis of dual-kanban just-in-time systems in a non-repetitive environment
    • Diaz, R., A. Ardalan,. 2010. An analysis of dual-kanban just-in-time systems in a non-repetitive environment. Prod. Oper. Manag. 19 (2): 233-245.
    • (2010) Prod. Oper. Manag. , vol.19 , Issue.2 , pp. 233-245
    • Diaz, R.1    Ardalan, A.2
  • 14
    • 0001275618 scopus 로고    scopus 로고
    • What is the right supply chain for your product?
    • Fisher, M. L., 1997. What is the right supply chain for your product? Harv. Bus. Rev. 75 (2): 105-116.
    • (1997) Harv. Bus. Rev. , vol.75 , Issue.2 , pp. 105-116
    • Fisher, M.L.1
  • 15
    • 0000913203 scopus 로고    scopus 로고
    • Reducing the cost of demand uncertainty through accurate response to early sales
    • Fisher, M., A. Raman,. 1996. Reducing the cost of demand uncertainty through accurate response to early sales. Oper. Res. 44 (1): 87-99. (Pubitemid 126669439)
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 87-99
    • Fisher, M.1    Raman, A.2
  • 16
    • 0000972929 scopus 로고    scopus 로고
    • Rocket science retailing is almost here-are you ready?
    • Fisher, M. L., A. Raman, A. S. McClelland,. 2000. Rocket science retailing is almost here-are you ready? Harv. Bus. Rev. 78 (4): 115-124.
    • (2000) Harv. Bus. Rev. , vol.78 , Issue.4 , pp. 115-124
    • Fisher, M.L.1    Raman, A.2    McClelland, A.S.3
  • 17
    • 0037804616 scopus 로고    scopus 로고
    • An examination of the relationships between JIT and financial performance
    • Fullerton, R. R., C. S. McWatters, C. Fawson,. 2003. An examination of the relationships between JIT and financial performance. J. Oper. Manag. 21 (4): 383-404.
    • (2003) J. Oper. Manag. , vol.21 , Issue.4 , pp. 383-404
    • Fullerton, R.R.1    McWatters, C.S.2    Fawson, C.3
  • 18
    • 0032665038 scopus 로고    scopus 로고
    • Value of information in capacitated supply chains
    • Gavirneni, S., R. Kapuscinski, S. Tayur,. 1999. Value of information in capacitated supply chains. Manage. Sci. 45 (1): 16-24.
    • (1999) Manage. Sci. , vol.45 , Issue.1 , pp. 16-24
    • Gavirneni, S.1    Kapuscinski, R.2    Tayur, S.3
  • 19
    • 0035400582 scopus 로고    scopus 로고
    • The mediating role of operations knowledge in the relationship of context with performance
    • DOI 10.1016/S0272-6963(00)00067-X, PII S027269630000067X
    • Germain, R., C. Dröge, W. Christensen,. 2001. The mediating role of operations knowledge in the relationship of context with performance. J. Oper. Manag. 19 (4): 453-469. (Pubitemid 32451632)
    • (2001) Journal of Operations Management , vol.19 , Issue.4 , pp. 453-469
    • Germain, R.1    Droge, C.2    Christensen, W.3
  • 20
    • 67651227010 scopus 로고    scopus 로고
    • The pull evolution: From kanban to customized token-based systems
    • Gonzalez-R, P. L., J. M. Framinan,. 2009. The pull evolution: From kanban to customized token-based systems. Prod. Plann. Control. 20 (3): 276-287.
    • (2009) Prod. Plann. Control , vol.20 , Issue.3 , pp. 276-287
    • Gonzalez-R, P.L.1    Framinan, J.M.2
  • 21
  • 22
    • 0000465736 scopus 로고    scopus 로고
    • On the value of information in dynamic production/inventory problems under forecast evolution
    • Gullu, R,. 1996. On the value of information in dynamic production/inventory problems under forecast evolution. Nav. Res. Log. 43 (2): 289-303. (Pubitemid 126558375)
    • (1996) Naval Research Logistics , vol.43 , Issue.2 , pp. 289-303
    • Gullu, R.1
  • 23
    • 19844377525 scopus 로고    scopus 로고
    • Build-to-order supply chain management: A literature review and framework for development
    • DOI 10.1016/j.jom.2004.10.005, PII S0272696304001184, The Build to Order Chain (BOSC) A Competitive Strategy for the 21st Century
    • Gunasekaran, A., E. W. T. Ngai,. 2005. Build-to-order supply chain management: A literature review and framework for development. J. Oper. Manag. 23 (5): 423-451. (Pubitemid 40761046)
    • (2005) Journal of Operations Management , vol.23 , Issue.5 , pp. 423-451
    • Gunasekaran, A.1    Ngai, E.W.T.2
  • 24
    • 74549148065 scopus 로고    scopus 로고
    • Flexible kanbans to enhance volume flexibility in a JIT environment: A simulation based comparison via ANNs
    • Guneri, A. F., A. Kuzu, A. Taskin Gumus,. 2009. Flexible kanbans to enhance volume flexibility in a JIT environment: A simulation based comparison via ANNs. Int. J. Prod. Res. 47 (9): 6807-6819.
    • (2009) Int. J. Prod. Res. , vol.47 , Issue.9 , pp. 6807-6819
    • Guneri, A.F.1    Kuzu, A.2    Taskin Gumus, A.3
  • 25
    • 0031103287 scopus 로고    scopus 로고
    • An algorithm to dynamically adjust the number of Kanbans in stochastic processing times and variable demand environment
    • Gupta, S. M., Y. A. Y. Al-Turki,. 1997. An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment. Prod. Plan. Control 8 (2): 133-141. (Pubitemid 127652359)
    • (1997) Production Planning and Control , vol.8 , Issue.2 , pp. 133-141
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 26
    • 0004102424 scopus 로고
    • Dow-Jones Irwin, Homewood, IL.
    • Hall, R,. 1983. Zero Inventories. Dow-Jones Irwin, Homewood, IL.
    • (1983) Zero Inventories
    • Hall, R.1
  • 28
    • 84990602497 scopus 로고    scopus 로고
    • Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment
    • Handfield, R,. 2003. Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment. Decis. Sci. 24 (3): 581-602.
    • (2003) Decis. Sci. , vol.24 , Issue.3 , pp. 581-602
    • Handfield, R.1
  • 29
    • 0000376862 scopus 로고
    • Customer-order information, leadtimes, and inventories
    • Hariharan, R., P. Zipkin,. 1995. Customer-order information, leadtimes, and inventories. Manage. Sci. 41 (10): 1599-1607.
    • (1995) Manage. Sci. , vol.41 , Issue.10 , pp. 1599-1607
    • Hariharan, R.1    Zipkin, P.2
  • 30
    • 0036830707 scopus 로고    scopus 로고
    • From supply to demand chain management: Efficiency and customer satisfaction
    • DOI 10.1016/S0272-6963(02)00038-4, PII S0272696302000384
    • Heikkilä, J,. 2002. From supply to demand chain management: Efficiency and customer satisfaction. J. Oper. Manag. 20 (6): 747-767. (Pubitemid 35019110)
    • (2002) Journal of Operations Management , vol.20 , Issue.6 , pp. 747-767
    • Heikkila, J.1
  • 31
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system
    • Huang, P. Y., L. P Rees, B. W. Taylor,. 1983. A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system. Decis. Sci. 14 (3): 326-344.
    • (1983) Decis. Sci. , vol.14 , Issue.3 , pp. 326-344
    • Huang, P.Y.1    Rees L, P.2    Taylor, B.W.3
  • 33
    • 33947719650 scopus 로고    scopus 로고
    • Simulation of automated guided vehicle (AGV) systems based on just-in-time (JIT) philosophy in a job-shop environment
    • DOI 10.1016/j.simpat.2006.11.002, PII S1569190X06000852
    • Kesen, S. E., O. F. Baykoc,. 2007. Simulation of automated guided vehicle (AGV) systems based on just-in-time philosophy in a job-shop environment. Sim. Model. Pract. Theory 15 (3): 272-284. (Pubitemid 46507419)
    • (2007) Simulation Modelling Practice and Theory , vol.15 , Issue.3 , pp. 272-284
    • Kesen, S.E.1    Baykoc, O.F.2
  • 34
    • 0022062163 scopus 로고
    • Just-in-time manufacturing system: A periodic pull system
    • Kim, T,. 1985. Just-in-time manufacturing system: A periodic pull system. Int. J. Prod. Res. 23 (3): 553-562. (Pubitemid 15541570)
    • (1985) International Journal of Production Research , vol.23 , Issue.3 , pp. 553-562
    • Kim Tae-Moon1
  • 35
    • 84952179325 scopus 로고
    • Design and analysis of pull system: A method of multistage production control
    • Kimura, O., H. Terada,. 1981. Design and analysis of pull system: A method of multistage production control. Int. J. Prod. Res. 19 (3): 241-253.
    • (1981) Int. J. Prod. Res. , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 36
    • 19644379724 scopus 로고    scopus 로고
    • Re-examining the performance of MRP and kanban material control strategies for multi-product flexible manufacturing systems
    • Krishnamurthy, A., R. Suri, M. Vernon,. 2004. Re-examining the performance of MRP and kanban material control strategies for multi-product flexible manufacturing systems. Int. J. Flex. Manuf. Syst. 16 (2): 123-150.
    • (2004) Int. J. Flex. Manuf. Syst. , vol.16 , Issue.2 , pp. 123-150
    • Krishnamurthy, A.1    Suri, R.2    Vernon, M.3
  • 37
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The bullwhip effect
    • Lee, H. L., V. Padmanabhan, S. Whang,. 1997. Information distortion in a supply chain: The bullwhip effect. Manage. Sci. 43 (4): 546-558. (Pubitemid 127569855)
    • (1997) Management Science , vol.43 , Issue.4 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 38
    • 0033686633 scopus 로고    scopus 로고
    • The value of information sharing in a two-level supply chain
    • Lee, H. L., K. C. So, C. S. Tang,. 2000. The value of information sharing in a two-level supply chain. Manage. Sci. 46 (5): 626-643.
    • (2000) Manage. Sci. , vol.46 , Issue.5 , pp. 626-643
    • Lee, H.L.1    So, K.C.2    Tang, C.S.3
  • 39
    • 0023437204 scopus 로고
    • Parametric appraisal of the JIT system
    • Lee, L. C., 1987. Parametric appraisal of the JIT system. Int. J. Prod. Res. 25 (10): 1415-1429.
    • (1987) Int. J. Prod. Res. , vol.25 , Issue.10 , pp. 1415-1429
    • Lee, L.C.1
  • 40
    • 0001997129 scopus 로고
    • JIT and the effects of varying process and set-up times
    • Lee, L. C., K. H. W. Seah,. 1988. JIT and the effects of varying process and set-up times. Int. J. Oper. Prod. Manag. 8 (1): 19-35.
    • (1988) Int. J. Oper. Prod. Manag. , vol.8 , Issue.1 , pp. 19-35
    • Lee, L.C.1    Seah, K.H.W.2
  • 41
    • 13544275547 scopus 로고    scopus 로고
    • A Multi-Objective Genetic Algorithm for mixed-model sequencing on JIT assembly lines
    • DOI 10.1016/j.ejor.2004.07.016, PII S0377221704004734, Multicriteria Scheduling
    • Mansouri, S. A., 2005. A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. Eur. J. Oper. Res. 167 (3): 696-716. (Pubitemid 40220086)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 696-716
    • Mansouri, S.A.1
  • 42
    • 0032683598 scopus 로고    scopus 로고
    • Total cycle time compression and the agile supply chain
    • Mason-Jones, R., D. R. Towill,. 1999. Total cycle time compression and the agile supply chain. Int. J. Prod. Econ. 62 (1-2): 61-73.
    • (1999) Int. J. Prod. Econ. , vol.62 , Issue.12 , pp. 61-73
    • Mason-Jones, R.1    Towill, D.R.2
  • 43
    • 0011725678 scopus 로고
    • The optimal operation planning of kanban to minimize the total operation cost
    • Miyazaki, S., H. Ohta, N. Nishiyama,. 1988. The optimal operation planning of kanban to minimize the total operation cost. Int. J. Prod. Res. 26 (10): 1605-1611.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.10 , pp. 1605-1611
    • Miyazaki, S.1    Ohta, H.2    Nishiyama, N.3
  • 45
    • 0002662032 scopus 로고    scopus 로고
    • The resurgence of growth in the late 1990s: Is information technology the story?
    • Oliner, S. D., D. E. Sichel,. 2000. The resurgence of growth in the late 1990s: Is information technology the story? J. Econ. Perspect. 14 (4): 3-22.
    • (2000) J. Econ. Perspect. , vol.14 , Issue.4 , pp. 3-22
    • Oliner, S.D.1    Sichel, D.E.2
  • 46
    • 0032638476 scopus 로고    scopus 로고
    • Quick response supply chain alliances in the Australian textiles, clothing, and footwear industry
    • Perry, M., A. S. Sohal, P. Rumpf,. 1999. Quick response supply chain alliances in the Australian textiles, clothing, and footwear industry. Int. J. Prod. Econ. 62 (1-2): 119-132.
    • (1999) Int. J. Prod. Econ. , vol.62 , Issue.12 , pp. 119-132
    • Perry, M.1    Sohal, A.S.2    Rumpf, P.3
  • 47
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time
    • Rees, L. P., P. R. Philipoon, W. B. Taylor, P. Y. Huang,. 1987. Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of lead-time. IIE Trans. 19 (2): 199-207.
    • (1987) IIE Trans. , vol.19 , Issue.2 , pp. 199-207
    • Rees, L.P.1    Philipoon, P.R.2    Taylor, W.B.3    Huang, P.Y.4
  • 48
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarkar, B. R., J. A. Fitzsimmons,. 1989. The performance of push and pull systems: A simulation and comparative study. Int. J. Prod. Res. 27 (10): 1715-1731.
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.10 , pp. 1715-1731
    • Sarkar, B.R.1    Fitzsimmons, J.A.2
  • 50
    • 0031122185 scopus 로고    scopus 로고
    • Information Technology for Automated Manufacturing Enterprises: Recent Developments and Current Research Issues
    • Shaw, M. J., A. Seidmann, A. B. Whinston,. 1997. Information technology for automated manufacturing enterprises: Recent developments and current research issues. Int. J. Flex. Manuf. Syst. 9 (2): 115-120. (Pubitemid 127506975)
    • (1997) International Journal of Flexible Manufacturing Systems , vol.9 , Issue.2 , pp. 115-120
    • Shaw, M.J.1    Seidmann, A.2    Whinston, A.B.3
  • 52
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M. L., M. A. Zazanis,. 1992. Push and pull production systems: Issues and comparisons. Oper. Res. 40 (3): 521-532.
    • (1992) Oper. Res. , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 53
    • 0032655401 scopus 로고    scopus 로고
    • Reacting JIT ordering systems to unstable changes in demand
    • Takahashi, K., N. Nakamura,. 1999. Reacting JIT ordering systems to unstable changes in demand. Int. J. Prod. Res. 37 (10): 2293-2313.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.10 , pp. 2293-2313
    • Takahashi, K.1    Nakamura, N.2
  • 54
    • 0344084242 scopus 로고    scopus 로고
    • The effects of an integrative supply chain strategy on customer service and financial performance: An analysis of direct versus indirect relationships
    • Vickery, S. K., J. Jayaram, C. Droge, R. Calantone,. 2003. The effects of an integrative supply chain strategy on customer service and financial performance: An analysis of direct versus indirect relationships. J. Oper. Manag. 21 (5): 523-539.
    • (2003) J. Oper. Manag. , vol.21 , Issue.5 , pp. 523-539
    • Vickery, S.K.1    Jayaram, J.2    Droge, C.3    Calantone, R.4
  • 55
    • 33745839897 scopus 로고    scopus 로고
    • A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems
    • DOI 10.1016/j.ijpe.2006.01.006, PII S0925527306001058
    • Yavuz, M., S. Tufekci,. 2006. A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems. Int. J. Prod. Econ. 103 (2): 841-862. (Pubitemid 44038511)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 841-862
    • Yavuz, M.1    Tufekci, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.