메뉴 건너뛰기




Volumn 19, Issue 2, 2010, Pages 233-245

An analysis of dual-kanban just-in-time systems in a non-repetitive environment

Author keywords

Just in time; Non repetitive production; Scheduling; Shop floor control; Simulation

Indexed keywords


EID: 77950939808     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2009.01075.x     Document Type: Article
Times cited : (12)

References (26)
  • 1
    • 0032306745 scopus 로고    scopus 로고
    • Adaptation of JIT phylosophy and kanban technique to a small-sized manufacturing firm; a project management approach
    • Abdul-Nour, G., S. Lambert, J. Drolet. 1998. Adaptation of JIT philosophy and Kanban technique to a small-sized manufacturing firm; A project management approach. Comput. Ind. Eng. 35(3-4): 419-422. (Pubitemid 128674743)
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.3-4 , pp. 419-422
    • Abdul-Nour, G.1    Lambert, S.2    Drolet, J.3
  • 2
    • 33947159533 scopus 로고    scopus 로고
    • An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain
    • Aigbedo, H. 2007. An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain. Eur. J. Oper. Res. 181(2): 704-715. (Pubitemid 46413588)
    • (2007) European Journal of Operational Research , vol.181 , Issue.2 , pp. 704-715
    • Aigbedo, H.1
  • 3
    • 0031529082 scopus 로고    scopus 로고
    • Analysis of local decision rules in a dual-kanban flow shop
    • Ardalan, A. 1997. Analysis of local decision rules in a dual-kanban flow shop. Dec. Sci. 28(1): 195-211. (Pubitemid 127341481)
    • (1997) Decision Sciences , vol.28 , Issue.1 , pp. 195-211
    • Ardalan, A.1
  • 4
    • 28044435648 scopus 로고    scopus 로고
    • Design of practical optimum JIT systems by integration of computer simulation and analysis of variance
    • Azadeh, A., B. Bidokhti, S. M. R. Sakkaki. 2005. Design of practical optimum JIT systems by integration of computer simulation and analysis of variance. Comp. Ind. Eng. 49(4): 504-519. (Pubitemid 41689976)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.4 , pp. 504-519
    • Azadeh, A.1    Bidokhti, B.2    Sakkaki, S.M.R.3
  • 5
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban-controlled flow shop
    • Berkley, B. J., A. S. Kiran. 1991. A simulation study of sequencing rules in a kanban-controlled flow shop. Dec. Sci. 22(3): 559-582.
    • (1991) Dec. Sci. , vol.22 , Issue.3 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 6
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., D. T. Phillips, G. L. Hogg. 1982. A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res. 20(1): 27-45.
    • (1982) Int. J. Prod. Res. , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 7
    • 19944408941 scopus 로고    scopus 로고
    • Build-to-order and just-in-time as predictors of applied supply chain knowledge and market performance
    • Christensen, W. J., R. Germain, L. Birou. 2005. Build-to-order and just-in-time as predictors of applied supply chain knowledge and market performance. J. Oper. Manag. 23(5): 470-481.
    • (2005) J. Oper. Manag. , vol.23 , Issue.5 , pp. 470-481
    • Christensen, W.J.1    Germain, R.2    Birou, L.3
  • 8
    • 0010889791 scopus 로고
    • Power function charts for specifying numbers of observations in analysis of variance of fixed effects
    • Feldt, L. S., M. W. Mahmoud. 1958. Power function charts for specifying numbers of observations in analysis of variance of fixed effects. Ann. Math. Stat. 29(3): 871-877.
    • (1958) Ann. Math. Stat. , vol.29 , Issue.3 , pp. 871-877
    • Feldt, L.S.1    Mahmoud, M.W.2
  • 9
    • 0004102424 scopus 로고
    • Dow-Jones Irwin, Homewood, IL
    • Hall, R. 1983. Zero Inventories. Dow-Jones Irwin, Homewood, IL.
    • (1983) Zero Inventories
    • Hall, R.1
  • 11
    • 84990602497 scopus 로고    scopus 로고
    • Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment
    • Handfield, R. 2003. Distinguishing features of just-in-time systems in the make-to-order/assemble-to-order environment. Dec. Sci. 24(3): 581-602.
    • (2003) Dec. Sci. , vol.24 , Issue.3 , pp. 581-602
    • Handfield, R.1
  • 12
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system
    • Huang, P. Y., L. P. Rees, B. W. Taylor. 1983. A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system. Dec. Sci. 14: 326-344.
    • (1983) Dec. Sci. , vol.14 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 13
    • 0003548401 scopus 로고
    • Push, pull and hybrid control systems
    • Graduate School of Business Administration, University of Rochester
    • Karmarkar, U. S. 1986. Push, pull and hybrid control systems. Working paper series no. QM8614, Graduate School of Business Administration, University of Rochester.
    • (1986) Working Paper Series No. QM8614
    • Karmarkar, U.S.1
  • 14
    • 33947719650 scopus 로고    scopus 로고
    • Simulation of automated guided vehicle (AGV) systems based on just-in-time philosophy in a job-shop environment
    • Kesen, S. E., O. F. Baykoc. 2007. Simulation of automated guided vehicle (AGV) systems based on just-in-time philosophy in a job-shop environment. Sim. Model. Pract. Theory 15(3): 272-284.
    • (2007) Sim. Model. Pract. Theory , vol.15 , Issue.3 , pp. 272-284
    • Kesen, S.E.1    Baykoc, O.F.2
  • 15
    • 0022062163 scopus 로고
    • Just-in-time manufacturing system: A periodic pull system
    • Kim, T. 1985. Just-in-time manufacturing system: A periodic pull system. Int. J. Prod. Res. 23(3): 553-562.
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.3 , pp. 553-562
    • Kim, T.1
  • 16
    • 84952179325 scopus 로고
    • Design and analysis of pull system: A method of multistage production control
    • Kimura, O., H. Terada. 1981. Design and analysis of pull system: A method of multistage production control. Int. J. Prod. Res. 19(3): 241-253.
    • (1981) Int. J. Prod. Res. , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 17
    • 0023437204 scopus 로고
    • Parametric appraisal of the JIT system
    • Lee, L. C. 1987. Parametric appraisal of the JIT system. Int. J. Prod. Res. 25(10): 1415-1429.
    • (1987) Int. J. Prod. Res. , vol.25 , Issue.10 , pp. 1415-1429
    • Lee, L.C.1
  • 18
    • 0001997129 scopus 로고
    • JIT and the effects of varying process and set-up times
    • Lee, L. C., K. H. W. Seah. 1988. JIT and the effects of varying process and set-up times. Int. J. Oper. Prod. Manag. 8(1): 19-35.
    • (1988) Int. J. Oper. Prod. Manag. , vol.8 , Issue.1 , pp. 19-35
    • Lee, L.C.1    Seah, K.H.W.2
  • 19
    • 13544275547 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for mixedmodel sequencing on JIT assembly lines
    • Mansouri, S. A. 2005. A multi-objective genetic algorithm for mixedmodel sequencing on JIT assembly lines. Eur. J. Oper. Res. 167(3): 696-716.
    • (2005) Eur. J. Oper. Res. , vol.167 , Issue.3 , pp. 696-716
    • Mansouri, S.A.1
  • 20
    • 0011725678 scopus 로고
    • The optimal operation planning of kanban to minimize the total operation cost
    • Miyazaki, S., H. Ohta, N. Nishiyama. 1988. The optimal operation planning of kanban to minimize the total operation cost. Int. J. Prod. Res. 26(10): 1605-1611.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.10 , pp. 1605-1611
    • Miyazaki, S.1    Ohta, H.2    Nishiyama, N.3
  • 22
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarkar, B. R., J. A. Fitzsimmons. 1989. The performance of push and pull systems: A simulation and comparative study. Int. J. Prod. Res. 27(10): 1715-1731.
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.10 , pp. 1715-1731
    • Sarkar, B.R.1    Fitzsimmons, J.A.2
  • 25
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M. L., M. A. Zazanis. 1992. Push and pull production systems: Issues and comparisons. Oper. Res. 40(3): 521-532.
    • (1992) Oper. Res. , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 26
    • 33745839897 scopus 로고    scopus 로고
    • A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems
    • Yavuz, M., S. Tufekci. 2006. A bounded dynamic programming solution to the batching problem in mixed-model justin-time manufacturing systems. Int. J. Prod. Econ. 103(2): 841-862. (Pubitemid 44038511)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 841-862
    • Yavuz, M.1    Tufekci, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.