메뉴 건너뛰기




Volumn 135, Issue 7, 2009, Pages 668-674

Nondominated archiving multicolony ant algorithm in time - Cost trade-off optimization

Author keywords

Construction management; Decision making; Optimization

Indexed keywords

ANT ALGORITHMS; COMBINATORIAL OPTIMIZATION PROBLEMS; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; INNOVATIVE SOLUTIONS; MULTI-OBJECTIVE OPTIMIZATION PROBLEM; NONDOMINATED SOLUTIONS; PARETO FRONT; QUANTITATIVE METHOD; TIME COST; TIME-COST OPTIMIZATION; TIME-COST TRADE-OFF ANALYSIS; TRADE-OFF PROBLEM; WEIGHTED METHOD;

EID: 67650091786     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:7(668)     Document Type: Article
Times cited : (82)

References (19)
  • 1
    • 4444304684 scopus 로고    scopus 로고
    • Cooperative ant colonies for optimizing resource allocation in transportation
    • ", E. J. W. Boers, eds., LNCS, Vol., Springer, Berlin.
    • Doerner, K., Hartl, R. F., and Reimann, M. (2001). " Cooperative ant colonies for optimizing resource allocation in transportation.." Applications of Evolutionary Computing: Proc., EvoWorkshops 2001, E. J. W. Boers, eds., LNCS, Vol. 2037, Springer, Berlin, 7079.
    • (2001) Applications of Evolutionary Computing: Proc., EvoWorkshops 2001 , vol.2037 , pp. 7079
    • Doerner, K.1    Hartl, R.F.2    Reimann, M.3
  • 2
    • 67650013018 scopus 로고    scopus 로고
    • Competent for problem solving: The case of full truckload transportation
    • ".
    • Doerner, K., Hartl, R. F., and Reimann, M. (2003). " Competent for problem solving: The case of full truckload transportation.." Cent. Eur. J. Oper. Res., 11 (2), 115141.
    • (2003) Cent. Eur. J. Oper. Res. , vol.11 , Issue.2 , pp. 115141
    • Doerner, K.1    Hartl, R.F.2    Reimann, M.3
  • 3
    • 0003401932 scopus 로고
    • Ph.D. thesis, Dipartimento di Elettronica, Politecnico di Milano, Italy (in Italian).
    • Dorigo, M. (1992). " Optimization, learning and natural algorithms.." Ph.D. thesis, Dipartimento di Elettronica, Politecnico di Milano, Italy (in Italian).
    • (1992) Optimization, learning and natural algorithms
    • Dorigo, M.1
  • 5
    • 15944361924 scopus 로고    scopus 로고
    • Time-cost-quality trade-off analysis for highway construction
    • El-Rayes, K., and Kandil, A. (2005). " Time-cost-quality trade-off analysis for highway construction.." J. Constr. Eng. Manage., 131 (4), 477486.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 477486
    • El-Rayes, K.1    Kandil, A.2
  • 6
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • ", (),. 10.1061/(ASCE)0887-3801(1997)11:3(184)
    • Feng, C. W., Liu, L., and Burns, S. A. (1997). " Using genetic algorithms to solve construction time-cost trade-off problems.." J. Comput. Civ. Eng., 11 (3), 184189. 10.1061/(ASCE)0887-3801(1997)11:3(184)
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184189
    • Feng, C.W.1    Liu, L.2    Burns, S.A.3
  • 7
    • 0001834106 scopus 로고    scopus 로고
    • MACS-VRPT: A multiple ant colony system for vehicle routing problems with time windows
    • ", D. Corne, M. Dorigo, and F. Glover, eds., McGraw-Hill, New York.
    • Gambardella, L. M., Taillard, E. D., and Agazzi, G. (1999). " MACS-VRPT: A multiple ant colony system for vehicle routing problems with time windows.." New ideas in optimization, D. Corne, M. Dorigo, and, F. Glover, eds., McGraw-Hill, New York, 6376.
    • (1999) New ideas in optimization , pp. 6376
    • Gambardella, L.M.1    Taillard, E.D.2    Agazzi, G.3
  • 8
    • 0037121184 scopus 로고    scopus 로고
    • Scheduling continuous casting of aluminum using a multiple objective optimization metaheuristic
    • ", (),. 10.1016/S0377-2217(01)00329-0
    • Gravel, M., Price, W. L., and Gagne, C. (2002). " Scheduling continuous casting of aluminum using a multiple objective optimization metaheuristic.." Eur. J. Oper. Res., 143 (1), 218229. 10.1016/S0377- 2217(01)00329-0
    • (2002) Eur. J. Oper. Res. , vol.143 , Issue.1 , pp. 218229
    • Gravel, M.1    Price, W.L.2    Gagne, C.3
  • 9
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999). " Optimization of construction time-cost trade-off analysis using genetic algorithms.." Can. J. Civ. Eng., 26 (6), 685697.
    • (1999) Can. J. Civ. Eng. , vol.26 , Issue.6 , pp. 685697
    • Hegazy, T.1
  • 11
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H., and Love, P. (1997). " Using improved genetic algorithms to facilitate time-cost optimization.." J. Constr. Eng. Manage., 123 (3), 233237.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 233237
    • Li, H.1    Love, P.2
  • 12
    • 67650061957 scopus 로고    scopus 로고
    • On the design of ACO for the biobjective quadratic assignment problem
    • ", M. Dorigo, eds., LNCS, Vol., Springer, Berlin, Germany.
    • Lopez, M., Paquete, L., and Stutzle, T. (2004). " On the design of ACO for the biobjective quadratic assignment problem.." ANTS 2004, M. Dorigo, eds., LNCS, Vol. 3172, Springer, Berlin, Germany, 214225.
    • (2004) ANTS 2004 , vol.3172 , pp. 214225
    • Lopez, M.1    Paquete, L.2    Stutzle, T.3
  • 13
    • 12344311786 scopus 로고    scopus 로고
    • A conceptual case-based decision module for mitigating construction delays
    • ".
    • Ng, S. T., Deng, M. Z. M., Skitmore, R. M., and Lam, K. C. (2000). " A conceptual case-based decision module for mitigating construction delays.." Int. J. Constr. Inf. Technol., 8 (2), 120.
    • (2000) Int. J. Constr. Inf. Technol. , vol.8 , Issue.2 , pp. 120
    • Ng, S.T.1    Deng, M.Z.M.2    Skitmore, R.M.3    Lam, K.C.4
  • 14
    • 13944256583 scopus 로고    scopus 로고
    • Incorporating practicability into genetic algorithm-based time-cost optimization
    • Que, B. C. (2002). " Incorporating practicability into genetic algorithm-based time-cost optimization.." J. Constr. Eng. Manage., 128 (2), 139143.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 139143
    • Que, B.C.1
  • 15
    • 0037120688 scopus 로고    scopus 로고
    • An ant colony optimization algorithm to solve a two-machine bicriteria flowshop scheduling problem
    • ", (),. 10.1016/S0377-2217(02)00265-5
    • TKindt, V., Monmarche, N., Tercinet, F., and Laugt, D. (2002). " An ant colony optimization algorithm to solve a two-machine bicriteria flowshop scheduling problem.." Eur. J. Oper. Res., 142 (2), 250257. 10.1016/S0377-2217(02)00265-5
    • (2002) Eur. J. Oper. Res. , vol.142 , Issue.2 , pp. 250257
    • Tkindt, V.1    Monmarche, N.2    Tercinet, F.3    Laugt, D.4
  • 16
    • 43549086668 scopus 로고    scopus 로고
    • Construction time-cost trade-off analysis using ant colony optimization algorithm
    • ICMSE.
    • Ya-ping, K., and Ying, X. (2006). " Construction time-cost trade-off analysis using ant colony optimization algorithm.." Int. Conf. on Management Science and Engineering, ICMSE, 20392044.
    • (2006) Int. Conf. on Management Science and Engineering , pp. 20392044
    • Ya-Ping, K.1    Ying, X.2
  • 17
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L. A. (1965). " Fuzzy sets.." Inf. Control., 8 (3), 338353.
    • (1965) Inf. Control. , vol.8 , Issue.3 , pp. 338353
    • Zadeh, L.A.1
  • 18
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective timecost optimization
    • ".
    • Zheng, D. X. M., Ng, T. S. T., and Kumaraswamy, M. M. (2005). " Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective timecost optimization.." J. Constr. Eng. Manage., 131 (1), 8191.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 8191
    • Zheng, D.X.M.1    Ng, T.S.T.2    Kumaraswamy, M.M.3
  • 19
    • 70449566935 scopus 로고    scopus 로고
    • Multiobjective optimization of network systems by using ANT algorithms
    • Zio, E., and Zille, V. (2006). " Multiobjective optimization of network systems by using ANT algorithms.." Qual. Technol. Quant. Manage., 4 (2), 211224.
    • (2006) Qual. Technol. Quant. Manage. , vol.4 , Issue.2 , pp. 211224
    • Zio, E.1    Zille, V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.