메뉴 건너뛰기




Volumn 2, Issue 4, 2006, Pages 261-271

A change management toolkit for construction projects

Author keywords

Change effect; Change management; Change prediction; Project change causes; Workflow tool

Indexed keywords


EID: 85024189835     PISSN: 17452007     EISSN: 17527589     Source Type: Journal    
DOI: 10.1080/17452007.2006.9684621     Document Type: Article
Times cited : (47)

References (19)
  • 1
    • 84986146497 scopus 로고    scopus 로고
    • The role of human error in construction defects
    • Atkinson, A. R., 1999. ‘The role of human error in construction defects’. Structural Survey, 17 (4):231–236.
    • (1999) Structural Survey , vol.17 , Issue.4 , pp. 231-236
    • Atkinson, A.R.1
  • 3
    • 0038003524 scopus 로고    scopus 로고
    • A systematic view of organizational change and TQM
    • Cao, G., Clarke, S., and Lehaney, L., 2000. ‘A systematic view of organizational change and TQM’. The TQM magazine, 12 (3):186–193.
    • (2000) The TQM magazine , vol.12 , Issue.3 , pp. 186-193
    • Cao, G.1    Clarke, S.2    Lehaney, L.3
  • 4
    • 0004715737 scopus 로고
    • Austin, TX: Construction Industry Institute, University of Texas
    • CII. 1994. Project Change Management, Special Publication, vol 43–1 Austin, TX:Construction Industry Institute, University of Texas.
    • (1994) Project Change Management
  • 5
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • Cox, I. D., Morris, J. P., Rogerson, J. H., and Jared, G. E., 1999. ‘A quantitative study of post contract award design changes in construction’. Construction Management and Economics, 17 (4):427–439.
    • (1999) Construction Management and Economics , vol.17 , Issue.4 , pp. 427-439
    • Cox, I.D.1    Morris, J.P.2    Rogerson, J.H.3    Jared, G.E.4
  • 6
    • 0003732501 scopus 로고    scopus 로고
    • London: Department of the Environment, Transport and Regions
    • Egan, J., 1998. Rethinking Construction London:Department of the Environment, Transport and Regions.
    • (1998) Rethinking Construction
    • Egan, J.1
  • 9
    • 4143067931 scopus 로고    scopus 로고
    • Illustrative benchmarking rework and rework costs in Swedish construction industry
    • Josephson, P., Larsson, B., and Li, H., 2002. ‘Illustrative benchmarking rework and rework costs in Swedish construction industry’. Journal of Management in Engineering, 18 (2):76–83.
    • (2002) Journal of Management in Engineering , vol.18 , Issue.2 , pp. 76-83
    • Josephson, P.1    Larsson, B.2    Li, H.3
  • 12
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P. E.D., and Li, H., 2000. ‘Quantifying the causes and costs of rework in construction’. Construction Management and Economics, 18 (4):479–490.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 13
    • 0035400029 scopus 로고    scopus 로고
    • Productivity oriented analysis of design revisions
    • Manavazhi, M. R., and Zhang, X., 2001. ‘Productivity oriented analysis of design revisions’. Construction Management and Economics, 19 (4):379–391.
    • (2001) Construction Management and Economics , vol.19 , Issue.4 , pp. 379-391
    • Manavazhi, M.R.1    Zhang, X.2
  • 15
    • 33746375011 scopus 로고    scopus 로고
    • A fuzzy system for evaluating the risk of change in construction projects
    • Motawa, I. A., Anumba, C. J., and El-Hamalawi, A., 2006. A fuzzy system for evaluating the risk of change in construction projects. Advances in Engineering Software, 37 (9):583–591.
    • (2006) Advances in Engineering Software , vol.37 , Issue.9 , pp. 583-591
    • Motawa, I.A.1    Anumba, C.J.2    El-Hamalawi, A.3
  • 17
    • 2142718584 scopus 로고    scopus 로고
    • Modelling the dynamics of design error induced rework in construction: Comment
    • Tombesi, P., 2000. ‘Modelling the dynamics of design error induced rework in construction:comment’. Construction Management and Economics, 18 (7):727–732.
    • (2000) Construction Management and Economics , vol.18 , Issue.7 , pp. 727-732
    • Tombesi, P.1
  • 18
    • 0032002562 scopus 로고    scopus 로고
    • Change management—a key integrative function of PM in transition economies
    • Voropajev, V., 1998. ‘Change management—a key integrative function of PM in transition economies’. International Journal of Project Management, 16 (1):15–19.
    • (1998) International Journal of Project Management , vol.16 , Issue.1 , pp. 15-19
    • Voropajev, V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.