-
1
-
-
84986146497
-
The role of human error in construction defects
-
Atkinson, A. R., 1999. ‘The role of human error in construction defects’. Structural Survey, 17 (4):231–236.
-
(1999)
Structural Survey
, vol.17
, Issue.4
, pp. 231-236
-
-
Atkinson, A.R.1
-
2
-
-
0026837054
-
Causes of quality deviation in design and construction
-
Burati, J. L., Farrington, J. J., and Ledbetter, W. B., 1992. ‘Causes of quality deviation in design and construction’. Journal of Construction Engineering and Management, 118 (1):34–49.
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
3
-
-
0038003524
-
A systematic view of organizational change and TQM
-
Cao, G., Clarke, S., and Lehaney, L., 2000. ‘A systematic view of organizational change and TQM’. The TQM magazine, 12 (3):186–193.
-
(2000)
The TQM magazine
, vol.12
, Issue.3
, pp. 186-193
-
-
Cao, G.1
Clarke, S.2
Lehaney, L.3
-
4
-
-
0004715737
-
-
Austin, TX: Construction Industry Institute, University of Texas
-
CII. 1994. Project Change Management, Special Publication, vol 43–1 Austin, TX:Construction Industry Institute, University of Texas.
-
(1994)
Project Change Management
-
-
-
5
-
-
0004603683
-
A quantitative study of post contract award design changes in construction
-
Cox, I. D., Morris, J. P., Rogerson, J. H., and Jared, G. E., 1999. ‘A quantitative study of post contract award design changes in construction’. Construction Management and Economics, 17 (4):427–439.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.4
, pp. 427-439
-
-
Cox, I.D.1
Morris, J.P.2
Rogerson, J.H.3
Jared, G.E.4
-
6
-
-
0003732501
-
-
London: Department of the Environment, Transport and Regions
-
Egan, J., 1998. Rethinking Construction London:Department of the Environment, Transport and Regions.
-
(1998)
Rethinking Construction
-
-
Egan, J.1
-
7
-
-
85024228128
-
The development of a change management dependency framework
-
Toronto, Canada: May 2004
-
Fleming, A., Sexton, M., Sun, M., Senaratne, S., and Aouad, G., 2004. “ ‘The development of a change management dependency framework’ ”. In Proceedings of the CIB world congress Toronto, Canada May 2004
-
(2004)
Proceedings of the CIB world congress
-
-
Fleming, A.1
Sexton, M.2
Sun, M.3
Senaratne, S.4
Aouad, G.5
-
8
-
-
0035399179
-
Project change management system
-
Ibbs, C. W., Wong, C. K., and Kwak, Y. H., 2001. ‘Project change management system’. Journal of Management Engineering, 17 (3):159–165.
-
(2001)
Journal of Management Engineering
, vol.17
, Issue.3
, pp. 159-165
-
-
Ibbs, C.W.1
Wong, C.K.2
Kwak, Y.H.3
-
9
-
-
4143067931
-
Illustrative benchmarking rework and rework costs in Swedish construction industry
-
Josephson, P., Larsson, B., and Li, H., 2002. ‘Illustrative benchmarking rework and rework costs in Swedish construction industry’. Journal of Management in Engineering, 18 (2):76–83.
-
(2002)
Journal of Management in Engineering
, vol.18
, Issue.2
, pp. 76-83
-
-
Josephson, P.1
Larsson, B.2
Li, H.3
-
10
-
-
84993077343
-
Rethinking construction: The generic design and construction process protocol
-
Kagioglou, M., Cooper, R., Aouad, G., and Sexton, M., 2000. ‘Rethinking construction:the generic design and construction process protocol’. Engineering, Construction and Architectural Management, 7 (2):141–153.
-
(2000)
Engineering, Construction and Architectural Management
, vol.7
, Issue.2
, pp. 141-153
-
-
Kagioglou, M.1
Cooper, R.2
Aouad, G.3
Sexton, M.4
-
12
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
Love, P. E.D., and Li, H., 2000. ‘Quantifying the causes and costs of rework in construction’. Construction Management and Economics, 18 (4):479–490.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
13
-
-
0035400029
-
Productivity oriented analysis of design revisions
-
Manavazhi, M. R., and Zhang, X., 2001. ‘Productivity oriented analysis of design revisions’. Construction Management and Economics, 19 (4):379–391.
-
(2001)
Construction Management and Economics
, vol.19
, Issue.4
, pp. 379-391
-
-
Manavazhi, M.R.1
Zhang, X.2
-
14
-
-
84885715321
-
A systematic approach to modelling change processes in construction projects
-
Motawa, I. A., Anumba, C. J., and El-Hamalawi, A., 2005. ‘A systematic approach to modelling change processes in construction projects’. Australian Journal of Construction Economics and Building, 5 (1):23–31.
-
(2005)
Australian Journal of Construction Economics and Building
, vol.5
, Issue.1
, pp. 23-31
-
-
Motawa, I.A.1
Anumba, C.J.2
El-Hamalawi, A.3
-
15
-
-
33746375011
-
A fuzzy system for evaluating the risk of change in construction projects
-
Motawa, I. A., Anumba, C. J., and El-Hamalawi, A., 2006. A fuzzy system for evaluating the risk of change in construction projects. Advances in Engineering Software, 37 (9):583–591.
-
(2006)
Advances in Engineering Software
, vol.37
, Issue.9
, pp. 583-591
-
-
Motawa, I.A.1
Anumba, C.J.2
El-Hamalawi, A.3
-
16
-
-
2042443603
-
The propagation of rework benchmark metrics for construction
-
Smith, J., Love, P. E.D., and Li, H., 1999. ‘The propagation of rework benchmark metrics for construction’. International Journal of Quality & Reliability Management, 16 (7):63–65.
-
(1999)
International Journal of Quality & Reliability Management
, vol.16
, Issue.7
, pp. 63-65
-
-
Smith, J.1
Love, P.E.D.2
Li, H.3
-
17
-
-
2142718584
-
Modelling the dynamics of design error induced rework in construction: Comment
-
Tombesi, P., 2000. ‘Modelling the dynamics of design error induced rework in construction:comment’. Construction Management and Economics, 18 (7):727–732.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.7
, pp. 727-732
-
-
Tombesi, P.1
-
18
-
-
0032002562
-
Change management—a key integrative function of PM in transition economies
-
Voropajev, V., 1998. ‘Change management—a key integrative function of PM in transition economies’. International Journal of Project Management, 16 (1):15–19.
-
(1998)
International Journal of Project Management
, vol.16
, Issue.1
, pp. 15-19
-
-
Voropajev, V.1
-
19
-
-
85024142406
-
Supporting construction processes using workflow technologies
-
Yeoh, M., Chung, P. W.H., Anumba, C. J., El-Hamalawi, A., and Motawa, I. A., 2003. “ ‘Supporting construction processes using workflow technologies’ ”. In Proceedings of the 2nd International Conference on Innovation in Architecture, Engineering and Construction, Loughborough University, UK, June 2003.
-
(2003)
Proceedings of the 2nd International Conference on Innovation in Architecture, Engineering and Construction, Loughborough University, UK, June 2003.
-
-
Yeoh, M.1
Chung, P.W.H.2
Anumba, C.J.3
El-Hamalawi, A.4
Motawa, I.A.5
|