-
1
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
CHENG, T. C. E., 1991, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transactions, 23, 23-28
-
(1991)
IIE Transactions
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
2
-
-
0017676069
-
An integrated inventory model for a single product system
-
GOYAL, S. K., 1977, An integrated inventory model for a single product system. Operations Research Quarterly, 28, 539-545.
-
(1977)
Operations Research Quarterly
, vol.28
, pp. 539-545
-
-
Goyal, S.K.1
-
3
-
-
0004102424
-
-
Homewood: Dow Jones-Irwin
-
HALL, R., 1983, Zero Inventories (Homewood: Dow Jones-Irwin).
-
(1983)
Zero Inventories
-
-
Hall, R.1
-
4
-
-
2142818460
-
Optical production cycle, procurement schedules, and joint investment in an imperfect production system
-
HONG, J. D., 1997, Optical production cycle, procurement schedules, and joint investment in an imperfect production system. European Journal of Operational Research, 100, 413-428.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 413-428
-
-
Hong, J.D.1
-
5
-
-
0029344857
-
Joint investment in quality improvement and set-up reduction
-
HONG, J. D., and HAYYA, J. C., 1995, Joint investment in quality improvement and set-up reduction. Computers Operations Research, 22, 567-574.
-
(1995)
Computers Operations Research
, vol.22
, pp. 567-574
-
-
Hong, J.D.1
Hayya, J.C.2
-
6
-
-
0027694412
-
Process quality improvement and set-up reduction in dynamic lot sizing
-
HONG, J. D., XU, S. H., and HAYYA, J. C., 1993, Process quality improvement and set-up reduction in dynamic lot sizing. International Journal of Production Research, 31, 2693-2708.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2693-2708
-
-
Hong, J.D.1
Xu, S.H.2
Hayya, J.C.3
-
7
-
-
0024069692
-
Justifying new technology acquisition through its impact on the cost of running an inventory policy
-
KELLER, G., and NOORI, H., 1988, Justifying new technology acquisition through its impact on the cost of running an inventory policy. IIE Transitions, 20, 284-291.
-
(1988)
IIE Transitions
, vol.20
, pp. 284-291
-
-
Keller, G.1
Noori, H.2
-
8
-
-
0028698197
-
Economic production lot size model with variable production rate and imperfect quality
-
KHOUJA, M., and MEHREZ, A., 1994, Economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society, 45, 1405-1417.
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 1405-1417
-
-
Khouja, M.1
Mehrez, A.2
-
9
-
-
0032761507
-
An optimal production run length in deteriorating production processes
-
KIM, C. H., and HONG, Y., 1999, An optimal production run length in deteriorating production processes. International Journal of Production Economics, 58, 183-189.
-
(1999)
International Journal of Production Economics
, vol.58
, pp. 183-189
-
-
Kim, C.H.1
Hong, Y.2
-
10
-
-
0032021393
-
Optimal lot sizing and inspection policy for EMQ model with imperfect inspections
-
MAKIS, V., 1998, Optimal lot sizing and inspection policy for EMQ model with imperfect inspections. Naval Research Logistics, 45, 165-186.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 165-186
-
-
Makis, V.1
-
11
-
-
0000341101
-
Defective units in a continuous review (s,Q) system
-
PAKNEJAD, M. J., NASRI, F., and AFFISCO, J. F., 1995. Defective units in a continuous review (s,Q) system. International Journal of Production Research, 33, 2767-2777.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2767-2777
-
-
Paknejad, M.J.1
Nasri, F.2
Affisco, J.F.3
-
12
-
-
0022613610
-
Optimal lot sizing, process quality improvement and set-up cost reduction
-
PORTEUS, E. L., 1986, Optimal lot sizing, process quality improvement and set-up cost reduction. Operations Research, 34, 137-144.
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
13
-
-
0022676316
-
Economic production cycle with imperfect production processes
-
ROSENBLATT, M. J., and LEE, H. L., 1986, Economic production cycle with imperfect production processes. IIE Transactions. 18, 48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
14
-
-
0031145351
-
Manufacturing set-up cost reduction under variable lead times and finite opportunities for investment
-
SARKER, B. R., and COATES, E. R., 1997, Manufacturing set-up cost reduction under variable lead times and finite opportunities for investment. International Journal of Production Economics. 49, 237-247.
-
(1997)
International Journal of Production Economics
, vol.49
, pp. 237-247
-
-
Sarker, B.R.1
Coates, E.R.2
|