메뉴 건너뛰기




Volumn 5, Issue 4, 2009, Pages 867-880

A replenishment policy with defective products, backlog and delay of payments

Author keywords

Backlogging; Defective items; Inventory; Permissible delay of payments; Shortages

Indexed keywords


EID: 70350504288     PISSN: 15475816     EISSN: 1553166X     Source Type: Journal    
DOI: 10.3934/jimo.2009.5.867     Document Type: Article
Times cited : (8)

References (22)
  • 1
    • 0037431954 scopus 로고    scopus 로고
    • A joint approach for setting unit price and the length of credit period for a seller when end demand is price sensitive
    • P. L. Abad and C. K. Jaggi, A joint approach for setting unit price and the length of credit period for a seller when end demand is price sensitive, International Journal of Production Economics, 83 (2003), 115-122.
    • (2003) International Journal of Production Economics , vol.83 , pp. 115-122
    • Abad, P.L.1    Jaggi, C.K.2
  • 2
    • 21844488130 scopus 로고
    • Ordering policies of deteriorating items under permissible delay in payments
    • S. P. Aggarwal and C. K. Jaggi, Ordering policies of deteriorating items under permissible delay in payments, Journal of the Operational Research Society, 46 (1995), 658-662.
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 658-662
    • Aggarwal, S.P.1    Jaggi, C.K.2
  • 3
    • 29344473050 scopus 로고    scopus 로고
    • On optimal payment time for a retailer under permitted delay of payment by the wholesaler
    • K. J. Chung and Y. F. Huang, On optimal payment time for a retailer under permitted delay of payment by the wholesaler, Quality & Quantity, 40 (2006), 59-77.
    • (2006) Quality & Quantity , vol.40 , pp. 59-77
    • Chung, K.J.1    Huang, Y.F.2
  • 4
    • 58249144645 scopus 로고    scopus 로고
    • An ordering policy with allowable shortage and permissible delay in payments
    • K. J. Chung and C. K. Huang, An ordering policy with allowable shortage and permissible delay in payments, Applied Mathematical Modelling, 33 (2009), 2518-2525.
    • (2009) Applied Mathematical Modelling , vol.33 , pp. 2518-2525
    • Chung, K.J.1    Huang, C.K.2
  • 5
    • 0022045262 scopus 로고
    • Economic order quantity under conditions of permissble delay in payments
    • S. K. Goyal, Economic order quantity under conditions of permissble delay in payments, Journal of the Operational Research Society, 36 (1985), 335-338.
    • (1985) Journal of the Operational Research Society , vol.36 , pp. 335-338
    • Goyal, S.K.1
  • 6
    • 0036568439 scopus 로고    scopus 로고
    • Note on: Economic production quantity model for items with imperfect quality-a practical approach
    • S. K. Goyal and L. E. Cárdenas-Barrón, Note on: Economic production quantity model for items with imperfect quality-a practical approach, International Journal of Production Economics, 77 (2002), 85-87.
    • (2002) International Journal of Production Economics , vol.77 , pp. 85-87
    • Goyal, S.K.1    Cárdenas-Barrón, L.E.2
  • 7
    • 33748316562 scopus 로고    scopus 로고
    • Coordination a two-level supply chain with delay in payments and profit sharing
    • M. Y. Jaber and I. H. Osman, Coordination a two-level supply chain with delay in payments and profit sharing, Computers & Industrial Engineering, 50 (2006), 385-400.
    • (2006) Computers & Industrial Engineering , vol.50 , pp. 385-400
    • Jaber, M.Y.1    Osman, I.H.2
  • 8
    • 0031200313 scopus 로고    scopus 로고
    • An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
    • A. M. M. Jamal, B. R. Sarker and S. Wang, An ordering policy for deteriorating items with allowable shortage and permissible delay in payment, Journal of the Operational Research Society, 48 (1997), 826-833.
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 826-833
    • Jamal, A.M.M.1    Sarker, B.R.2    Wang, S.3
  • 9
    • 0012709501 scopus 로고    scopus 로고
    • Optimal payment time for a retailer under permitted delay of payment by the wholesaler
    • A. M. M. Jamal, B. R. Sarker and S. Wang, Optimal payment time for a retailer under permitted delay of payment by the wholesaler, International Journal of Production Economics, 66 (2000), 59-66.
    • (2000) International Journal of Production Economics , vol.66 , pp. 59-66
    • Jamal, A.M.M.1    Sarker, B.R.2    Wang, S.3
  • 10
  • 11
    • 39649124927 scopus 로고    scopus 로고
    • Economic order quantity for items with imperfect quality: Revisited
    • B. Maddah and M. Y. Jaber, Economic order quantity for items with imperfect quality: Revisited, International Journal of Production Economics, 112 (2008), 808-815.
    • (2008) International Journal of Production Economics , vol.112 , pp. 808-815
    • Maddah, B.1    Jaber, M.Y.2
  • 16
    • 33744997856 scopus 로고    scopus 로고
    • Optimal payment time for a retailer under permitted delay of payment by the wholesaler
    • X. Song and X. Cai, Optimal payment time for a retailer under permitted delay of payment by the wholesaler, International Journal of Production Economics, 103 (2006), 246-251.
    • (2006) International Journal of Production Economics , vol.103 , pp. 246-251
    • Song, X.1    Cai, X.2
  • 17
    • 0036682157 scopus 로고    scopus 로고
    • On the economic order quantity under conditions of permissible delay in payments
    • J. T. Teng, On the economic order quantity under conditions of permissible delay in payments, Journal of the Operational Research Society, 53 (2002), 915-918.
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 915-918
    • Teng, J.T.1
  • 18
    • 33748163005 scopus 로고    scopus 로고
    • Optimal inventory model for items with imperfect quality and shortage backordering
    • H. M. Wee, J. Yu and M. C. Chen, Optimal inventory model for items with imperfect quality and shortage backordering, The International Journal of Management Science, 35 (2007), 7-11.
    • (2007) The International Journal of Management Science , vol.35 , pp. 7-11
    • Wee, H.M.1    Yu, J.2    Chen, M.C.3
  • 22
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in an EOQ model with random yield, IIE Transactions, 22 (1990), 41-47.
    • (1990) IIE Transactions , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.