메뉴 건너뛰기




Volumn , Issue , 2008, Pages 227-248

Manufacturing complexity analysis: A simulation-based methodology

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84861916561     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1007/978-0-387-47321-5_11     Document Type: Chapter
Times cited : (7)

References (34)
  • 1
    • 0030284772 scopus 로고    scopus 로고
    • A simulation analysis for two-level sequence scheduling for just-in-time (JIT) mixed-model assembly lines
    • Aigbedo, H., and Monden, Y. (1996). A simulation analysis for two-level sequence scheduling for just-in-time (JIT) mixed-model assembly lines. International Journal of Production Research, 34(11), 3107-3124.
    • (1996) International Journal of Production Research , vol.34 , Issue.11 , pp. 3107-3124
    • Aigbedo, H.1    Monden, Y.2
  • 2
    • 0033225131 scopus 로고    scopus 로고
    • An overview of design and operational issues of kanban systems
    • Akturk, M. S., and Erhun, F. (1999). An overview of design and operational issues of kanban systems International Journal of Production Research, 37(17), 3859-3881.
    • (1999) International Journal of Production Research , vol.37 , Issue.17 , pp. 3859-3881
    • Akturk, M.S.1    Erhun, F.2
  • 3
    • 0003596943 scopus 로고    scopus 로고
    • Agile product development for mass customization
    • Second Edition, Chicago, Irwin Professional
    • Anderson, D. M. (1997). Agile Product Development for Mass Customization. How to Develop and Deliver. Second Edition, Chicago, Irwin Professional.
    • (1997) How to Develop and Deliver
    • Anderson, D.M.1
  • 4
    • 0031147439 scopus 로고    scopus 로고
    • Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite setups
    • Anwar, F. M., and Nagi, R. (1997). Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite setups. International Journal of Production Research, 35(5), 1447-1470.
    • (1997) International Journal of Production Research , vol.35 , Issue.5 , pp. 1447-1470
    • Anwar, F.M.1    Nagi, R.2
  • 5
    • 0032114994 scopus 로고    scopus 로고
    • Simulation modeling and analysis of a JIT production system
    • Baykoc, O. F., and Erol, S. (1998). Simulation modeling and analysis of a JIT production system. International Journal of Production Economics, 55(7), 203-212.
    • (1998) International Journal of Production Economics , vol.55 , Issue.7 , pp. 203-212
    • Baykoc, O.F.1    Erol, S.2
  • 6
    • 4043065186 scopus 로고    scopus 로고
    • On the effect of product variety in production-inventory systems
    • Benjaafar, S., Kim, J. S., and Vishwanadham, N. (2004). On the effect of product variety in production-inventory systems Annals of Operations Research, 126(1-4), 71-101.
    • (2004) Annals of Operations Research , vol.126 , Issue.1-4 , pp. 71-101
    • Benjaafar, S.1    Kim, J.S.2    Vishwanadham, N.3
  • 7
    • 0032187351 scopus 로고    scopus 로고
    • A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
    • Bukchin, J. (1998). A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment. International Journal of Production Research, 36(10), 2669-2685.
    • (1998) International Journal of Production Research , vol.36 , Issue.10 , pp. 2669-2685
    • Bukchin, J.1
  • 13
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
    • Detty, R. B., and Yingling, J. C. (2000). Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study. International Journal of Production Research, 38(2), 429-445.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 14
    • 11244347681 scopus 로고    scopus 로고
    • Product offering, pricing, and make-to-stock/make-to-order decisions with shared capacity
    • Dobson, G., and Yano, C. A. (2002). Product offering, pricing, and make-to-stock/make-to-order decisions with shared capacity. Production and Operations Management, 11(3), 293-306.
    • (2002) Production and Operations Management , vol.11 , Issue.3 , pp. 293-306
    • Dobson, G.1    Yano, C.A.2
  • 15
    • 0035295083 scopus 로고    scopus 로고
    • Sequencing JIT mixed-model assembly lines under stationload and part-usage constraints
    • Drexl, A., and Kimms, A. (2001). Sequencing JIT mixed-model assembly lines under stationload and part-usage constraints Management Science, 47(3), 480-491.
    • (2001) Management Science , vol.47 , Issue.3 , pp. 480-491
    • Drexl, A.1    Kimms, A.2
  • 16
    • 11744354582 scopus 로고    scopus 로고
    • An entropic measurement of complexity in manufacturing operations
    • University of Cambridge, UK
    • Frizelle, G. (1996). An entropic measurement of complexity in manufacturing operations. Research Report, Department of Engineering, University of Cambridge, UK.
    • (1996) Research Report, Department of Engineering
    • Frizelle, G.1
  • 21
    • 0242269801 scopus 로고    scopus 로고
    • Simulation based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation
    • Li, J. W. (2003). Simulation based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation. International Journal of Production Research, 41(3), 427-447.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 427-447
    • Li, J.W.1
  • 22
    • 0001208675 scopus 로고    scopus 로고
    • Product variety and manufacturing performance: Evidence from the international automotive assembly plant study
    • MacDuffie, J. P., Sethuraman, K., and Fisher, M. L. (1996). Product variety and manufacturing performance: Evidence from the International Automotive Assembly Plant Study. Management Science, 42(3), 350-369.
    • (1996) Management Science , vol.42 , Issue.3 , pp. 350-369
    • Macduffie, J.P.1    Sethuraman, K.2    Fisher, M.L.3
  • 23
    • 0029306372 scopus 로고
    • Impact of ABC information on product mix and costing decisions
    • Malik, S. A., and Sullivan, W. G. (1995). Impact of ABC information on product mix and costing decisions. IEEE Transactions of Engineering Management, 42(2),171-176.
    • (1995) IEEE Transactions of Engineering Management , vol.42 , Issue.2 , pp. 171-176
    • Malik, S.A.1    Sullivan, W.G.2
  • 29
    • 0242578562 scopus 로고    scopus 로고
    • Activity based cost estimation in a push/ pull advanced manufacturing system
    • Ozbayrak, M., Akgun, M., and Turker, A. K. (2004). Activity based cost estimation in a push/ pull advanced manufacturing system. Internal Journal of Production Economics, 87, 49-65.
    • (2004) Internal Journal of Production Economics , vol.87 , pp. 49-65
    • Ozbayrak, M.1    Akgun, M.2    Turker, A.K.3
  • 30
    • 0031234628 scopus 로고    scopus 로고
    • Simulation analysis of a pull-push system for an electronic assembly line
    • Savsar, M. (1997). Simulation analysis of a pull-push system for an electronic assembly line International Journal of Production Economics, 51, 205-214.
    • (1997) International Journal of Production Economics , vol.51 , pp. 205-214
    • Savsar, M.1
  • 31
    • 0032737809 scopus 로고    scopus 로고
    • Application of discrete event simulation to the activity based costing of manufacturing systems
    • Spedding, T. A., and Sun, G. Q. (1999). Application of discrete event simulation to the activity based costing of manufacturing systems. International Journal of Production Economics, 58, 289-301.
    • (1999) International Journal of Production Economics , vol.58 , pp. 289-301
    • Spedding, T.A.1    Sun, G.Q.2
  • 32
    • 0026624344 scopus 로고
    • A comparative analysis of sequencing procedures for mixed-model assembly line in just-in-time production system
    • Sumischrast, R. T., Russell, A., and Taylor, B. W. (1992). A comparative analysis of sequencing procedures for mixed-model assembly line in just-in-time production system. International Journal of Production Research, 30(1), 199-214.
    • (1992) International Journal of Production Research , vol.30 , Issue.1 , pp. 199-214
    • Sumischrast, R.T.1    Russell, A.2    Taylor, B.W.3
  • 33
    • 1542606412 scopus 로고    scopus 로고
    • A simulation study of WIP inventory drive systems and their effect on financial measurements
    • Taylor, L. J., III (1999). A simulation study of WIP inventory drive systems and their effect on financial measurements. Integrated Manufacturing Systems, 10(5), 306-305.
    • (1999) Integrated Manufacturing Systems , vol.10 , Issue.5 , pp. 306-305
    • Taylor III, L.J.1
  • 34
    • 0031103223 scopus 로고    scopus 로고
    • Hybrid push/pull production control strategy simulation and its applications
    • Wang, D., and Xu, C. G. (1997). Hybrid push/pull production control strategy simulation and its applications. Production Planning &; Control, 8(2), 142-151.
    • (1997) Production Planning &; Control , vol.8 , Issue.2 , pp. 142-151
    • Wang, D.1    Xu, C.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.