메뉴 건너뛰기




Volumn 8, Issue 2, 1997, Pages 142-151

Hybrid push/pull production control strategy simulation and its applications

Author keywords

Inventory control; Manufacturing processes; Production control; Simulation; Software development

Indexed keywords

ASSEMBLY; COMPUTER AIDED MANUFACTURING; COMPUTER SIMULATION; COMPUTER SOFTWARE; INVENTORY CONTROL; MARKOV PROCESSES; MATHEMATICAL MODELS; OPTIMIZATION; SOFTWARE ENGINEERING; STRATEGIC PLANNING;

EID: 0031103223     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372897235406     Document Type: Article
Times cited : (28)

References (11)
  • 3
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull strategies for a parallel multistage system: Part 1
    • HODGSON, T. J., and WANG, D., 1991a, Optimal hybrid push/pull strategies for a parallel multistage system: Part 1, International Journal of Production Research, 29, 1279 -1287.
    • (1991) International Journal of Production Research , vol.29
    • Hodgson, T.J.1    Wang, D.2
  • 4
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull strategies for a parallel multistage system: Part 2
    • HODGSON, T. J., and WANG, D., 1991b, Optimal hybrid push/pull strategies for a parallel multistage system: Part 2, International Journal of Production Research, 29, 1453 -1460.
    • (1991) International Journal of Production Research , vol.29
    • Hodgson, T.J.1    Wang, D.2
  • 5
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multistage production control
    • KIMURA, O., and TERADA, H., 1981, Design and analysis of pull system, a method of multistage production control, International Journal of Production Research, 19, 241 -253.
    • (1981) International Journal of Production Research , vol.19
    • Kimura, O.1    Terada, H.2
  • 9
    • 0017557653 scopus 로고
    • Toyota production system and Kanban system materialization of just-in-time and respect-for-human system
    • SUGIMORI, Y., KUSUNOKI, K., CHO, F., and UCHIKAWA, S., 1977, Toyota production system and Kanban system materialization of just-in-time and respect-for-human system, International Journal of Production Research, 15, 553 -564.
    • (1977) International Journal of Production Research , vol.15
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 10
    • 0012331409 scopus 로고
    • Production management: Beyond the dichotomy between ‘push’ and ‘pull’
    • VILLA, A., and WATANABE, T., 1993, Production management: beyond the dichotomy between ‘push’ and ‘pull’ Computer Integrated Manufacturing Systems, 6, 53 -63.
    • (1993) Computer Integrated Manufacturing Systems , vol.6
    • Villa, A.1    Watanabe, T.2
  • 11
    • 0026942067 scopus 로고
    • Computation reduction for large scale Markov process to analyze multistage production systems
    • WANG, D., and HODGSON, T. J., 1992, Computation reduction for large scale Markov process to analyze multistage production systems, International Journal of Production Research, 30, 2411 -2420.
    • (1992) International Journal of Production Research , vol.30
    • Wang, D.1    Hodgson, T.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.