메뉴 건너뛰기




Volumn 35, Issue 5, 1997, Pages 1447-1470

Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTER INTEGRATED MANUFACTURING; COST EFFECTIVENESS; HEURISTIC METHODS; INVENTORY CONTROL; ITERATIVE METHODS; JUST IN TIME PRODUCTION; NONLINEAR PROGRAMMING; SCHEDULING; STRATEGIC PLANNING;

EID: 0031147439     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497195416     Document Type: Article
Times cited : (43)

References (49)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E., and Zawak, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34 (4), 391 -401.
    • (1988) Management Science , vol.34 , Issue.4
    • Adams, J.1    Balas, E.2    Zawak, D.3
  • 2
    • 0021376670 scopus 로고
    • Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems
    • Afentakis, P., Gavish, B., and Karmarkar, U., 1984, Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems. Management Science, 30 (2), 222-239.
    • (1984) Management Science , vol.30 , Issue.2 , pp. 222-239
    • Afentakis, P.1    Gavish, B.2    Karmarkar, U.3
  • 4
    • 0040362442 scopus 로고
    • A decomposition approach for the machine scheduling problem
    • Ashour, S., 1967, A decomposition approach for the machine scheduling problem. InternationalJournal of Production Research, 6 (2), 109-122.
    • (1967) Internationaljournal of Production Research , vol.6 , Issue.2 , pp. 109-122
    • Ashour, S.1
  • 5
    • 0015570304 scopus 로고
    • A branch and bound approach to the job shop scheduling problem
    • Ashour, S., and Hiremath, S. R., 1973, A branch and bound approach to the job shop scheduling problem. International Journal of Production Research, 11 (1), 47-58.
    • (1973) International Journal of Production Research , vol.11 , Issue.1 , pp. 47-58
    • Ashour, S.1    Hiremath, S.R.2
  • 6
    • 3342875396 scopus 로고
    • Scheduling the general job shop
    • Baker, J. R., and McMohan, G. B., 1985, Scheduling the general job shop. Management Science, 35 (2), 164-176.
    • (1985) Management Science , vol.35 , Issue.2 , pp. 164-176
    • Baker, J.R.1    Mc Mohan, G.B.2
  • 7
    • 0018153235 scopus 로고
    • An algorithm for the dynamic lot size problem with time-varying production capacity constraint
    • Baker, K., Dixon, P., Magazine, M., and Silver, E., 1978, An algorithm for the dynamic lot size problem with time-varying production capacity constraint. Management Science, 24 (16), 1710-1720.
    • (1978) Management Science , vol.24 , Issue.16 , pp. 1710-1720
    • Baker, K.1    Dixon, P.2    Magazine, M.3    Silver, E.4
  • 8
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
    • Billington, P. J., McClain, J. O., and Thomas, L. J., 1983, Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Management Science, 29 (10), 1126-1137.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1137
    • Billington, P.J.1    Mc Clain, J.O.2    Thomas, L.J.3
  • 9
    • 0019913634 scopus 로고
    • Improved heuristic for multi-stage requirements planning systems
    • Blackburn, J. D., and Millen, R. A., 1982, Improved heuristic for multi-stage requirements planning systems. Management Science, 28 (1), 44-56.
    • (1982) Management Science , vol.28 , Issue.1 , pp. 44-56
    • Blackburn, J.D.1    Millen, R.A.2
  • 10
  • 11
    • 0000165767 scopus 로고
    • An algorithm for solving the job shop problem
    • Carlier, J., and Pinson, E., 1989, An algorithm for solving the job shop problem. Management Science, 35 (2), 164-176.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 12
    • 0028769360 scopus 로고
    • An effective algorithm for the capacitated single item lot size problem
    • Chung, C.-S., Flynn, J., and Lin, C.-H. M., 1994, An effective algorithm for the capacitated single item lot size problem. European Journal of Operational Research, 75(3), 427-440.
    • (1994) European Journal of Operational Research , vol.75 , Issue.3 , pp. 427-440
    • Chung, C.-S.1    Flynn, J.2    Lin, C.-H.M.3
  • 14
    • 84985807773 scopus 로고
    • An improved heuristic for multilevel lot sizing in material requirement planning
    • Coleman, B. J., and McKnew, M. A., 1991, An improved heuristic for multilevel lot sizing in material requirement planning. Decision Sciences, 22 (1), 116-156.
    • (1991) Decision Sciences , vol.22 , Issue.1 , pp. 116-156
    • Coleman, B.J.1    Mc Knew, M.A.2
  • 15
    • 0001887652 scopus 로고
    • Dynamic lot size models for multi-stage assembly systems
    • Crowston, W. B., and Wagner, M. H., 1973, Dynamic lot size models for multi-stage assembly systems. Management Science, 20 (1), 14-21.
    • (1973) Management Science , vol.20 , Issue.1 , pp. 14-21
    • Crowston, W.B.1    Wagner, M.H.2
  • 16
    • 0001887653 scopus 로고
    • Econometric lot size determination in multi-stage assembly systems
    • Crowston, W. B., Wagner, M. H., and William, J. F., 1973, Econometric lot size determination in multi-stage assembly systems. Management Science, 19 (5), 517-527.
    • (1973) Management Science , vol.19 , Issue.5 , pp. 517-527
    • Crowston, W.B.1    Wagner, M.H.2    William, J.F.3
  • 19
    • 0002063626 scopus 로고
    • An economic lot sizing technique: The part period algorithm
    • DeMatteis, J. J., 1968, An economic lot sizing technique: the part period algorithm. IBM Systems Journal, 7 (1), 30- 38.
    • (1968) IBM Systems Journal , vol.7 , Issue.1
    • Dematteis, J.J.1
  • 20
    • 33749286452 scopus 로고
    • A heuristic solution procedure for the multi-item singlelevel, limited-capacity, lot-sizing problem
    • Dixon, p., and Silver, E. A., 1981, A heuristic solution procedure for the multi-item singlelevel, limited-capacity, lot-sizing problem. Journal of Operations Management, 2 (1), 23-39.
    • (1981) Journal of Operations Management , vol.2 , Issue.1 , pp. 23-39
    • Dixon, P.1    Silver, E.A.2
  • 21
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extension
    • Elmaghraby, s., 1978, The economic lot scheduling problem (ELSP): review and extension. Management Science, 24 (6), 587-598.
    • (1978) Management Science , vol.24 , Issue.6 , pp. 587-598
    • Elmaghraby, S.1
  • 22
    • 3342887545 scopus 로고
    • The Interactive Shop Supervisor
    • November
    • Godin, V., and Jones, C., 1969, The Interactive Shop Supervisor. Industrial Engineering, November, 16-22.
    • (1969) Industrial Engineering , pp. 16-22
    • Godin, V.1    Jones, C.2
  • 24
    • 0000711418 scopus 로고
    • A branch and bound solution for general scheduling problem
    • Greenberg, H. H., 1968, A branch and bound solution for general scheduling problem. Operations Research, 16 (2), 353-361.
    • (1968) Operations Research , vol.16 , Issue.2 , pp. 353-361
    • Greenberg, H.H.1
  • 25
    • 0023310940 scopus 로고
    • Lot sizes, lead time and inprocess inventories
    • Karmarkar, U. S., 1987, Lot sizes, lead time and inprocess inventories. Management Science, 33 (3), 409-418.
    • (1987) Management Science , vol.33 , Issue.3 , pp. 409-418
    • Karmarkar, U.S.1
  • 26
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and lead time
    • Karmarkar, U. S., 1989, Capacity loading and release planning with work-in-progress (WIP) and lead time. Journal of Manufacturing and Operations Management, 2 (2), 105-123.
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , Issue.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 27
    • 0025701550 scopus 로고
    • An efficient algorithm for the capacitated single-item dynamic lot sizing problem
    • Kirca, O., 1990, An efficient algorithm for the capacitated single-item dynamic lot sizing problem. European Journal of Operational Research, 45 (1), 15-24.
    • (1990) European Journal of Operational Research , vol.45 , Issue.1 , pp. 15-24
    • Kirca, O.1
  • 28
    • 0028769365 scopus 로고
    • A new heuristic approach for the multi-item dynamic lot sizing problem
    • Kirca, O., and Kokten, M., 1994, A new heuristic approach for the multi-item dynamic lot sizing problem. European Journal of Operational Research, 75 (2), 332-341.
    • (1994) European Journal of Operational Research , vol.75 , Issue.2 , pp. 332-341
    • Kirca, O.1    Kokten, M.2
  • 30
    • 0018723096 scopus 로고
    • Heuristic procedures forthe single operation, multi-item loading problem
    • Lambrecht, M., VanderEecken, j., and Vanderveken, H., 1979, Heuristic procedures forthe single operation, multi-item loading problem. AIIE Transactions, 11, 319-326.
    • (1979) AIIE Transactions , vol.11 , pp. 319-326
    • Lambrecht, M.1    Vandereecken, J.2    Vanderveken, H.3
  • 31
    • 0000399511 scopus 로고
    • Computational complexity of discrete optimization problems
    • Lenstra, J. K., and Rinnooy, Kan A. H. D., 1979, Computational complexity of discrete optimization problems. Annals of Discrete Mathematics, 4, 121-140.
    • (1979) Annals of Discrete Mathematics , vol.4 , pp. 121-140
    • Lenstra, J.K.1    Rinnooy, K.A.H.D.2
  • 32
    • 30244563423 scopus 로고
    • Finite capacity scheduling and simulation systems. Report MTIAC TA-85-04
    • Chicago, Illinois
    • Levulis, R. J., 1985, Finite capacity scheduling and simulation systems. Report MTIAC TA-85-04, Manufacturing Technology Information Analysis Center, Chicago, Illinois.
    • (1985) Manufacturing Technology Information Analysis Center
    • Levulis, R.J.1
  • 34
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • McCarthy, B. L., and Liu, j., 1993, Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31 (1), 55-79.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 55-79
    • Mc Carthy, B.L.1    Liu, J.2
  • 35
    • 0024731470 scopus 로고
    • Scheduling mixed model, multi-level just-in-time production systems
    • Miltenburg, j., and Sinnamon, G., 1989, Scheduling mixed model, multi-level just-in-time production systems. International Journal of Production Research, 27 (9), 187-209.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 187-209
    • Miltenburg, J.1    Sinnamon, G.2
  • 36
    • 0000172494 scopus 로고
    • Algorithms for scheduling multi-level just-in-time production systems
    • Miltenburg, j., and Sinnamon, G., 1992, Algorithms for scheduling multi-level just-in-time production systems. IIE Transactions, 24 (2), 121 - 130.
    • (1992) IIE Transactions , vol.24 , Issue.2
    • Miltenburg, J.1    Sinnamon, G.2
  • 38
  • 39
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter, s., 1968, A system for managing job shop production. Journal of Business, 39 (3), 371- 393.
    • (1968) Journal of Business , vol.39 , Issue.3
    • Reiter, S.1
  • 40
    • 0024112269 scopus 로고
    • A recent survey of production scheduling
    • Rodammer, F. A., and White, K. P. Jr., 1988, A recent survey of production scheduling. AIIE Transactions, 18 (6), 841-851.
    • (1988) AIIE Transactions , vol.18 , Issue.6 , pp. 841-851
    • Rodammer, F.A.1    White, K.P.2
  • 42
    • 0002657699 scopus 로고
    • A heuristic for selecting lot-size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • Silver, E. A., and Meal, H. C., 1973, A heuristic for selecting lot-size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 14 (2), 64-77.
    • (1973) Production and Inventory Management , vol.14 , Issue.2 , pp. 64-77
    • Silver, E.A.1    Meal, H.C.2
  • 43
    • 0019247722 scopus 로고
    • Optimal multi-level lot sizing for requirements planning systems
    • Steinberg, E., and Napier, H. A., 1980, Optimal multi-level lot sizing for requirements planning systems. Management Science, 26 (12), 1258-1271.
    • (1980) Management Science , vol.26 , Issue.12 , pp. 1258-1271
    • Steinberg, E.1    Napier, H.A.2
  • 44
    • 0028769370 scopus 로고
    • A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structure
    • Tempelmeier, H., and Helber, s., 1994, A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structure. European Journal of Operational Research, 75 (2), 296-311.
    • (1994) European Journal of Operational Research , vol.75 , Issue.2 , pp. 296-311
    • Tempelmeier, H.1    Helber, S.2
  • 45
    • 0001962762 scopus 로고
    • Dynamic version of economic lot size model
    • Wagner, H. M., and Whitin, T. M., 1958, Dynamic version of economic lot size model. Management Science, 5 (1), 89-96.
    • (1958) Management Science , vol.5 , Issue.1 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 46
    • 0021393367 scopus 로고
    • Network programming models for production scheduling in multi-stage multi-item capacitated system
    • Zahorik, A., Thomas, L. J., and Trigeiro, W. W., 1984, Network programming models for production scheduling in multi-stage multi-item capacitated system. Management Science, 30 (3), 308-325.
    • (1984) Management Science , vol.30 , Issue.3 , pp. 308-325
    • Zahorik, A.1    Thomas, L.J.2    Trigeiro, W.W.3
  • 47
    • 0000295676 scopus 로고
    • Minimum concave cost flows in certain networks
    • Zangwill, W. I., 1968, Minimum concave cost flows in certain networks. Management Science, 14 (7), 429-450.
    • (1968) Management Science , vol.14 , Issue.7 , pp. 429-450
    • Zangwill, W.I.1
  • 48
    • 0000631024 scopus 로고
    • A backlogging model and a multi-echelon model of a dynamic lot size production system-a network approach
    • Zangwill, W. I., 1969, A backlogging model and a multi-echelon model of a dynamic lot size production system-a network approach. Management Science, 15 (9), 506-527.
    • (1969) Management Science , vol.15 , Issue.9 , pp. 506-527
    • Zangwill, W.I.1
  • 49
    • 0010895132 scopus 로고
    • A deterministic multiproduct, multifacility production and inventory model
    • Zangwill, W. I., 1977, A deterministic multiproduct, multifacility production and inventory model. Operations Research, 14 (3), 486-507.
    • (1977) Operations Research , vol.14 , Issue.3 , pp. 486-507
    • Zangwill, W.I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.