Integrating analytical hierarchy process to genetic algorithm for re-entrant flow shop scheduling problem

Author keywords

analytical hierarchy process; flow shop; genetic algorithm; multiple objectives; re entrant

Indexed keywords

ANALYTICAL HIERARCHY PROCESS; COMPREHENSIVE STUDIES; CONVERGENCE SPEED; FLOW SHOP SCHEDULING PROBLEM; FLOW-SHOPS; HYBRID FLOW SHOP SCHEDULING; MULTIPLE CRITERIA; MULTIPLE OBJECTIVES; OPERATIONAL SCENARIO; PROCESSING LINES; RE-ENTRANT; REAL LIFE DATA; SCHEDULING PROBLEM; SELECTION PROCESS; SOLUTION ALGORITHMS;

EID: 84861398606     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.561884     Document Type: Article
Times cited : (26)

References (39)
  • 1
    • 54049088269 scopus 로고    scopus 로고
    • An ahp-based decision-making tool for the solution of multiproduct batch plant design problem under imprecise demand
    • Aguilar-Lasserre, A., et al., 2009. An AHP-based decision-making tool for the solution of multiproduct batch plant design problem under imprecise demand. Computers & Operations Research, 36 (3), 711-736.
    • (2009) Computers & Operations Research , vol.36 , Issue.3 , pp. 711-736
    • Aguilar-Lasserre, A.1
  • 2
    • 70449686075 scopus 로고    scopus 로고
    • Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: A case study
    • Alfieri, A., 2009. Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study. International Journal of Production Research, 47 (18), 5129-5145.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 5129-5145
    • Alfieri, A.1
  • 3
    • 1542685255 scopus 로고    scopus 로고
    • Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
    • Balasubramanian, H., et al., 2004. Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness. International Journal of Production Research, 42 (8), 1621-1638.
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1621-1638
    • Balasubramanian, H.1
  • 4
    • 33646223540 scopus 로고    scopus 로고
    • Multi-criteria genetic optimization for distribution network problems
    • (Copyright 2004, IEE
    • Chan, F.T.S. and Chung, S.H., 2004a. Multi-criteria genetic optimization for distribution network problems. International Journal of Advanced Manufacturing Technology, 24 (Copyright 2004, IEE), 517-532.
    • (2004) International Journal of Advanced Manufacturing Technology , vol.24 , pp. 517-532
    • Chan, F.T.S.1    Chung, S.H.2
  • 5
    • 2542486712 scopus 로고    scopus 로고
    • A multi-criterion genetic algorithm for order distribution in a demand driven supply chain
    • Chan, F.T.S. and Chung, S.H., 2004b. A multi-criterion genetic algorithm for order distribution in a demand driven supply chain. International Journal of Computer Integrated Manufacturing, 17 (4), 339-351.
    • (2004) International Journal of Computer Integrated Manufacturing , vol.17 , Issue.4 , pp. 339-351
    • Chan, F.T.S.1    Chung, S.H.2
  • 6
    • 11244309098 scopus 로고    scopus 로고
    • Multicriterion genetic optimization for due date assigned distribution network problems
    • (Copyright 2005, IEE
    • Chan, F.T.S. and Chung, S.H., 2005. Multicriterion genetic optimization for due date assigned distribution network problems. Decision Support Systems, 39 (Copyright 2005, IEE), 661-675.
    • (2005) Decision Support Systems , vol.39 , pp. 661-675
    • Chan, F.T.S.1    Chung, S.H.2
  • 7
    • 33646426393 scopus 로고    scopus 로고
    • Optimization of order fulfillment in distribution network problems
    • Chan, F.T.S., Chung, S.H., and Choy, K.L., 2006. Optimization of order fulfillment in distribution network problems. Journal of Intelligent Manufacturing, 17 (3), 307-319.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.3 , pp. 307-319
    • Chan, F.T.S.1    Chung, S.H.2    Choy, K.L.3
  • 8
    • 1142280344 scopus 로고    scopus 로고
    • A heuristic methodology for order distribution in a demand driven collaborative supply chain
    • (Copyright 2004, IEE
    • Chan, F.T.S., Chung, S.H., and Wadhwa, S., 2004. A heuristic methodology for order distribution in a demand driven collaborative supply chain. International Journal of Production Research, 42 (Copyright 2004, IEE), 1-19.
    • (2004) International Journal of Production Research , vol.42 , pp. 1-19
    • Chan, F.T.S.1    Chung, S.H.2    Wadhwa, S.3
  • 9
    • 12344311099 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for production and distribution
    • Chan, F.T.S., Chung, S.H., and Wadhwa, S., 2005. A hybrid genetic algorithm for production and distribution. Omega, 33 (4), 345-355.
    • (2005) Omega , vol.33 , Issue.4 , pp. 345-355
    • Chan, F.T.S.1    Chung, S.H.2    Wadhwa, S.3
  • 10
    • 37349113923 scopus 로고    scopus 로고
    • Hybrid tabu search for re-entrant permutation flow-shop scheduling problem
    • Chen, J.-S., Pan, J.C.-H., and Wu, C.-K., 2008a. Hybrid tabu search for re-entrant permutation flow-shop scheduling problem. Expert Systems with Applications, 34 (3), 1924-1930.
    • (2008) Expert Systems with Applications , vol.34 , Issue.3 , pp. 1924-1930
    • Chen, J.-S.1    Pan, J.C.-H.2    Wu, C.-K.3
  • 11
    • 34248573437 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
    • Chen, J.S., Pan, J.C.H., and Lin, C.M., 2008b. A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem. Expert Systems with Applications, 34 (1), 570-577.
    • (2008) Expert Systems with Applications , vol.34 , Issue.1 , pp. 570-577
    • Chen, J.S.1    Pan, J.C.H.2    Lin, C.M.3
  • 12
    • 67349128578 scopus 로고    scopus 로고
    • Minimizing total tardiness on a two-machine re-entrant flowshop
    • Choi, S.-W. and Kim, Y.-D., 2009. Minimizing total tardiness on a two-machine re-entrant flowshop. European Journal of Operational Research, 199 (2), 375-384.
    • (2009) European Journal of Operational Research , vol.199 , Issue.2 , pp. 375-384
    • Choi, S.-W.1    Kim, Y.-D.2
  • 13
    • 79551635874 scopus 로고    scopus 로고
    • A review of the research methodology for the re-entrant scheduling problem
    • Danping, L. and Lee, C., 2011. A review of the research methodology for the re-entrant scheduling problem. International Journal of Production Research, 49 (8), 2221-2242.
    • (2011) International Journal of Production Research , vol.49 , Issue.8 , pp. 2221-2242
    • Danping, L.1    Lee, C.2
  • 14
    • 67650751037 scopus 로고    scopus 로고
    • Designing sustainable recovery network of end-of-life products using genetic algorithm
    • Dehghanian, F. and Mansour, S., 2009. Designing sustainable recovery network of end-of-life products using genetic algorithm. Resources, Conservation and Recycling, 53 (10), 559-570.
    • (2009) Resources, Conservation and Recycling , vol.53 , Issue.10 , pp. 559-570
    • Dehghanian, F.1    Mansour, S.2
  • 15
    • 27844446991 scopus 로고    scopus 로고
    • Global optimization of a feature-based process sequence using ga and ann techniques
    • Ding, L., et al., 2005. Global optimization of a feature-based process sequence using GA and ANN techniques. International Journal of Production Research, 43 (15), 3247-3272.
    • (2005) International Journal of Production Research , vol.43 , Issue.15 , pp. 3247-3272
    • Ding, L.1
  • 17
    • 35148881767 scopus 로고    scopus 로고
    • Integrated approach to part scheduling and inspection policies for a job shop manufacturing system
    • Galante, G. and Passannanti, G., 2007. Integrated approach to part scheduling and inspection policies for a job shop manufacturing system. International Journal of Advanced Manufacturing Technology, 45 (22), 5177-5198.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.45 , Issue.22 , pp. 5177-5198
    • Galante, G.1    Passannanti, G.2
  • 18
    • 0000410538 scopus 로고
    • Scheduling of re-entrant flow shops
    • Graves, S., et al., 1983. Scheduling of re-entrant flow shops. Journal of Operations Management, 3 (4), 197-207.
    • (1983) Journal of Operations Management , vol.3 , Issue.4 , pp. 197-207
    • Graves, S.1
  • 19
    • 70450286451 scopus 로고    scopus 로고
    • Machining scheme selection of digital manufacturing based on genetic algorithm and ahp
    • Guan, X., Wang, Y., and Tao, L., 2009. Machining scheme selection of digital manufacturing based on genetic algorithm and AHP. Journal of Intelligent Manufacturing, 20 (6), 661-669.
    • (2009) Journal of Intelligent Manufacturing , vol.20 , Issue.6 , pp. 661-669
    • Guan, X.1    Wang, Y.2    Tao, L.3
  • 20
  • 21
    • 0032163475 scopus 로고    scopus 로고
    • Production sequencing problem with re-entrant work flows and sequence dependent setup times
    • Hwang, H. and Sun, J.U., 1998. Production sequencing problem with re-entrant work flows and sequence dependent setup times. International Journal of Production Research, 36 (9), 2435-2450.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2435-2450
    • Hwang, H.1    Sun, J.U.2
  • 22
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • Johnson, S., 1954. Optimal two-and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1 (1), 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.1
  • 23
    • 0030232128 scopus 로고    scopus 로고
    • Mean flow time minimization in reentrant job shops with a hub
    • Kubiak, W., Lou, S., and Wang, Y., 1996. Mean flow time minimization in reentrant job shops with a hub. Operations Research, 44 (5), 764-776.
    • (1996) Operations Research , vol.44 , Issue.5 , pp. 764-776
    • Kubiak, W.1    Lou, S.2    Wang, Y.3
  • 24
    • 34548853136 scopus 로고    scopus 로고
    • Improving ahp for construction with an adaptive ahp approach (a3)
    • Lin, C., Wang, W., and Yu, W., 2008. Improving AHP for construction with an adaptive AHP approach (A3). Automation in Construction, 17 (2), 180-187.
    • (2008) Automation in Construction , vol.17 , Issue.2 , pp. 180-187
    • Lin, C.1    Wang, W.2    Yu, W.3
  • 25
    • 77953636273 scopus 로고    scopus 로고
    • A genetic algorithm based approach for scheduling of jobs containing multiple orders in a three-machine flowshop
    • Liu, C.-H., 2010. A genetic algorithm based approach for scheduling of jobs containing multiple orders in a three-machine flowshop. International Journal of Production Research, 48 (15), 4379-4396.
    • (2010) International Journal of Production Research , vol.48 , Issue.15 , pp. 4379-4396
    • Liu, C.-H.1
  • 26
    • 1842843004 scopus 로고    scopus 로고
    • Genetic algorithm using sequence rule chain for multi-objective optimization in re-entrant microelectronic production line
    • Liu, M. and Wu, C., 2004. Genetic algorithm using sequence rule chain for multi-objective optimization in re-entrant microelectronic production line. Robotics and computer integrated manufacturing, 20 (3), 225-236.
    • (2004) Robotics and computer integrated manufacturing , vol.20 , Issue.3 , pp. 225-236
    • Liu, M.1    Wu, C.2
  • 28
    • 0037290393 scopus 로고    scopus 로고
    • Characterization of aggregate fuzzy membership functions using saaty's eigenvalue approach
    • Pendharkar, P., 2003. Characterization of aggregate fuzzy membership functions using Saaty's eigenvalue approach. Computers and Operations Research, 30 (2), 199-212.
    • (2003) Computers and Operations Research , vol.30 , Issue.2 , pp. 199-212
    • Pendharkar, P.1
  • 31
    • 0033079535 scopus 로고    scopus 로고
    • A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop
    • Pinedo, M. and Singer, M., 1999. A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. Naval Research Logistics, 46 (1), 1-17.
    • (1999) Naval Research Logistics , vol.46 , Issue.1 , pp. 1-17
    • Pinedo, M.1    Singer, M.2
  • 32
    • 67349192556 scopus 로고    scopus 로고
    • Genetic algorithm modeling for the inspection allocation in reentrant production systems
    • (Compendex
    • Rau, H. and Cho, K.-H., 2009. Genetic algorithm modeling for the inspection allocation in reentrant production systems. Expert Systems with Applications, 36 (Compendex), 11287-11295.
    • (2009) Expert Systems with Applications , vol.36 , pp. 11287-11295
    • Rau, H.1    Cho, K.-H.2
  • 33
    • 0024769054 scopus 로고
    • Scheduling algorithms for flexible flowshops: Worst and average case performance
    • Sriskandarajah, S., 1989. Scheduling algorithms for flexible flowshops: worst and average case performance. European Journal of Operational Research, 43 (2), 143-160.
    • (1989) European Journal of Operational Research , vol.43 , Issue.2 , pp. 143-160
    • Sriskandarajah, S.1
  • 35
    • 0030401208 scopus 로고    scopus 로고
    • Knowledge acquisition from questionnaire data using simulated breeding and inductive learning methods
    • Terano, T. and Ishino, Y., 1996. Knowledge acquisition from questionnaire data using simulated breeding and inductive learning methods. Expert Systems with Applications, 11 (4), 507-518.
    • (1996) Expert Systems with Applications , vol.11 , Issue.4 , pp. 507-518
    • Terano, T.1    Ishino, Y.2
  • 36
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.Y., and Martin-Vega, L.A., 1992. A review of production planning and scheduling models in the semiconductor industry. I: System characteristics, performance evaluation and production planning. IIE Transactions, 24 (4), 47-60.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 37
    • 36849069984 scopus 로고    scopus 로고
    • Multi-family scheduling in a two-machine reentrant flow shop with setups
    • Yang, D., Kuo, W., and Chern, M., 2008. Multi-family scheduling in a two-machine reentrant flow shop with setups. European Journal of Operational Research, 187 (3), 1160-1170.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1160-1170
    • Yang, D.1    Kuo, W.2    Chern, M.3
  • 38
    • 0035525778 scopus 로고    scopus 로고
    • A consensus approach for synthesizing the elements of comparison matrix in the analytic hierarchy process
    • Yeh, J., Kreng, B., and Lin, C., 2001. A consensus approach for synthesizing the elements of comparison matrix in the Analytic Hierarchy Process. International Journal of Systems Science, 32 (11), 1353-1363.
    • (2001) International Journal of Systems Science , vol.32 , Issue.11 , pp. 1353-1363
    • Yeh, J.1    Kreng, B.2    Lin, C.3
  • 39
    • 55149114608 scopus 로고    scopus 로고
    • Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm
    • Zhou, H., Cheung, W., and Leung, L., 2009. Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm. European Journal of Operational Research, 194 (3), 637-649.
    • (2009) European Journal of Operational Research , vol.194 , Issue.3 , pp. 637-649
    • Zhou, H.1    Cheung, W.2    Leung, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.