Volumn 25, Issue 5, 2007, Pages 465-474

Contractor pre-qualification model: State-of-the-art

Author keywords

Analytical hierarchy process; Contractor pre qualification; Genetic algorithms; Neural network

Indexed keywords

ANALYTIC HIERARCHY PROCESS; CONSTRUCTION INDUSTRY; GENETIC ALGORITHMS; NEURAL NETWORKS;

EID: 34248333828     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2006.11.011     Document Type: Article
Times cited : (114)

References (53)
  • 1
    • 0042951149 scopus 로고
    • Decision models for analysis and evaluation of construction contractors
    • Russell J.S. Decision models for analysis and evaluation of construction contractors. J Construct Manage Econom 10 (1992) 185-202
    • (1992) J Construct Manage Econom , vol.10 , pp. 185-202
    • Russell, J.S.1
  • 2
    • 84993053319 scopus 로고    scopus 로고
    • Addressing the contractor selection problem using an evidential reasoning approach
    • Sonmez M., Yang J.B., and Holt G.D. Addressing the contractor selection problem using an evidential reasoning approach. Eng Construct Architect Manage 8 3 (2001) 198-210
    • (2001) Eng Construct Architect Manage , vol.8 , Issue.3 , pp. 198-210
    • Sonmez, M.1    Yang, J.B.2    Holt, G.D.3
  • 3
    • 84993014082 scopus 로고    scopus 로고
    • Decision support system for contractor pre-qualification-artificial neural network model
    • Lam K.C., Ng S.T., Hu T., Skitmore R.M., and Cheung S.O. Decision support system for contractor pre-qualification-artificial neural network model. Eng Construct Architect Manage 7 3 (2000) 251-266
    • (2000) Eng Construct Architect Manage , vol.7 , Issue.3 , pp. 251-266
    • Lam, K.C.1    Ng, S.T.2    Hu, T.3    Skitmore, R.M.4    Cheung, S.O.5
  • 4
    • 84993077873 scopus 로고    scopus 로고
    • Decision-makers perceptions in the formulation of prequalification criteria
    • Ng S.T., Skitmore R.M., and Smith N.J. Decision-makers perceptions in the formulation of prequalification criteria. Eng Construct Architect Manage 6 2 (1999) 155-165
    • (1999) Eng Construct Architect Manage , vol.6 , Issue.2 , pp. 155-165
    • Ng, S.T.1    Skitmore, R.M.2    Smith, N.J.3
  • 5
    • 0030147931 scopus 로고    scopus 로고
    • Contractor evaluation and selection: a Hong Kong perspective
    • Kumaraswamy M.M. Contractor evaluation and selection: a Hong Kong perspective. Build Environ 31 3 (1996) 273-282
    • (1996) Build Environ , vol.31 , Issue.3 , pp. 273-282
    • Kumaraswamy, M.M.1
  • 6
    • 0030291578 scopus 로고    scopus 로고
    • Applying cluster analysis to construction contractor classification
    • Holt G.D. Applying cluster analysis to construction contractor classification. Build Environ 31 6 (1996) 557-568
    • (1996) Build Environ , vol.31 , Issue.6 , pp. 557-568
    • Holt, G.D.1
  • 7
    • 0032640145 scopus 로고    scopus 로고
    • Client and consultant perspectives of pre- qualification criteria
    • Ng S.T., and Skitmore R.M. Client and consultant perspectives of pre- qualification criteria. Build Environ 34 (1999) 607-621
    • (1999) Build Environ , vol.34 , pp. 607-621
    • Ng, S.T.1    Skitmore, R.M.2
  • 8
    • 0000771440 scopus 로고    scopus 로고
    • Assessment and evaluation of contractor data against client goals using PERT approach
    • Hatush Z., and Skitmore R.M. Assessment and evaluation of contractor data against client goals using PERT approach. Construct Manage Econom 15 (1997) 327-340
    • (1997) Construct Manage Econom , vol.15 , pp. 327-340
    • Hatush, Z.1    Skitmore, R.M.2
  • 9
    • 0035212291 scopus 로고    scopus 로고
    • Recent advances and proposed improvement in contractor pre-qualification methodologies
    • Palaneeswaran E., and Kumaraswamy M. Recent advances and proposed improvement in contractor pre-qualification methodologies. Build Environ 36 (2001) 73-87
    • (2001) Build Environ , vol.36 , pp. 73-87
    • Palaneeswaran, E.1    Kumaraswamy, M.2
  • 10
    • 34248364185 scopus 로고    scopus 로고
    • Taha M. Applying distributed artificial intelligence to the pre-qualification of construction contractors. Unpublished Ph.D. thesis, The University of Wisconsin-Madison, 1994.
  • 11
    • 0028516227 scopus 로고
    • Evaluating pre-qualification criteria in contractor selection
    • Holt G.D., Olomolaiye P.O., and Harris F.D. Evaluating pre-qualification criteria in contractor selection. Build Environ 29 4 (1994) 437-448
    • (1994) Build Environ , vol.29 , Issue.4 , pp. 437-448
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.D.3
  • 12
    • 34248374620 scopus 로고    scopus 로고
    • Munaif M. Multiple criteria decision making in contractor selection and evaluation of construction bid in the Saudi Arabia. Unpublished PhD thesis, University of Missouri-Rolla, 1995.
  • 13
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • Fong P.S., and Choi S.K.-Y. Final contractor selection using the analytical hierarchy process. Construct Manage Econom 18 (2000) 547-557
    • (2000) Construct Manage Econom , vol.18 , pp. 547-557
    • Fong, P.S.1    Choi, S.K.-Y.2
  • 14
    • 84993033383 scopus 로고    scopus 로고
    • Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences
    • Wong C.H., Holt G.D., and Harris P. Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Eng Construct Architect Manage 8 4 (2001) 257-271
    • (2001) Eng Construct Architect Manage , vol.8 , Issue.4 , pp. 257-271
    • Wong, C.H.1    Holt, G.D.2    Harris, P.3
  • 16
    • 34248367869 scopus 로고    scopus 로고
    • Mangitung DM, Emsley MW. Decision criteria for periodic pre-qualification in the UK construction industry. In: Proc of the RICS foundation and building research conference, 2002.
  • 17
    • 84992943400 scopus 로고    scopus 로고
    • Model for accessing building contractors' project performance
    • Tam C.M., and Harris F. Model for accessing building contractors' project performance. Eng Construct Architect Manage 3 (1996) 187-203
    • (1996) Eng Construct Architect Manage , vol.3 , pp. 187-203
    • Tam, C.M.1    Harris, F.2
  • 18
    • 0019552530 scopus 로고
    • Cost-plus contractor selection
    • Diekmann J.E. Cost-plus contractor selection. J Tech Council ASCE 107 (1981) 13-25
    • (1981) J Tech Council ASCE , vol.107 , pp. 13-25
    • Diekmann, J.E.1
  • 19
    • 0022128664 scopus 로고
    • Tender evaluation by fuzzy sets
    • Nguyen V.U. Tender evaluation by fuzzy sets. J Construct Eng Manag ASCE 111 (1985) 231-243
    • (1985) J Construct Eng Manag ASCE , vol.111 , pp. 231-243
    • Nguyen, V.U.1
  • 20
    • 0023416693 scopus 로고    scopus 로고
    • Juang C, Burati J, Kalidindi S. A fuzzy system for bid proposal evaluation using microcomputers. Civil Enginnering System, 1987.
  • 21
    • 0025398528 scopus 로고
    • Qualifier-2: Knowledge based system for contractor pre-qualification
    • Russell J.S., Skitbniewski M.J., and Cozier D.R. Qualifier-2: Knowledge based system for contractor pre-qualification. J Construct Eng Manage 116 1 (1990) 155-169
    • (1990) J Construct Eng Manage , vol.116 , Issue.1 , pp. 155-169
    • Russell, J.S.1    Skitbniewski, M.J.2    Cozier, D.R.3
  • 22
    • 0032186599 scopus 로고    scopus 로고
    • Verification and validation of case based prequalification system
    • Ng S.T., and Smith N.J. Verification and validation of case based prequalification system. J Comput Civil Eng 12 4 (1998) 215-226
    • (1998) J Comput Civil Eng , vol.12 , Issue.4 , pp. 215-226
    • Ng, S.T.1    Smith, N.J.2
  • 23
    • 0032023054 scopus 로고    scopus 로고
    • Contractor selection using multi-criteria utility theory: An Additive Model
    • Hatush Z., and Skitmore R.M. Contractor selection using multi-criteria utility theory: An Additive Model. Build Environ 33 2-3 (1998) 105-115
    • (1998) Build Environ , vol.33 , Issue.2-3 , pp. 105-115
    • Hatush, Z.1    Skitmore, R.M.2
  • 25
    • 0344121708 scopus 로고    scopus 로고
    • A multi-criteria model's survey: state of the art and some necessary capabilities of future models
    • Pongpeng J., and Liston J. A multi-criteria model's survey: state of the art and some necessary capabilities of future models. Construct Manage Econom 21 7 (2003) 665-670
    • (2003) Construct Manage Econom , vol.21 , Issue.7 , pp. 665-670
    • Pongpeng, J.1    Liston, J.2
  • 26
    • 3242732844 scopus 로고    scopus 로고
    • Using multivariate techniques for developing contractor classification models
    • Wong C.H., Nicholas J., and Holt G.D. Using multivariate techniques for developing contractor classification models. Eng Construct Architect Manage 10 2 (2003) 99-116
    • (2003) Eng Construct Architect Manage , vol.10 , Issue.2 , pp. 99-116
    • Wong, C.H.1    Nicholas, J.2    Holt, G.D.3
  • 27
    • 0942289097 scopus 로고    scopus 로고
    • A decision model proposal for construction contractor selection in Turkey
    • Topcu Y.I. A decision model proposal for construction contractor selection in Turkey. Build Environ 39 (2004) 469-481
    • (2004) Build Environ , vol.39 , pp. 469-481
    • Topcu, Y.I.1
  • 28
    • 0025220842 scopus 로고
    • Qualifier-1: Contractor pre-qualification model
    • Russell J.S., and Skitbniewski M.J. Qualifier-1: Contractor pre-qualification model. J Comput Civil Eng 4 1 (1990) 77-91
    • (1990) J Comput Civil Eng , vol.4 , Issue.1 , pp. 77-91
    • Russell, J.S.1    Skitbniewski, M.J.2
  • 29
    • 34248371422 scopus 로고    scopus 로고
    • Tran VHQ. Practical frontier in construction pre-qualification using data envelopment analysis. Master thesis, University of Toronto, 2002.
  • 31
    • 0035197791 scopus 로고    scopus 로고
    • Application of the AHP in project management
    • Al-Harbi K. Application of the AHP in project management. Int J Project Manage 19 (2001) 19-27
    • (2001) Int J Project Manage , vol.19 , pp. 19-27
    • Al-Harbi, K.1
  • 32
    • 34248398678 scopus 로고    scopus 로고
    • Hatush Z. Contractor selection using multicriteria utility theory. Unpublished PhD thesis. The University of Salford, UK, 1996.
  • 33
    • 0034817767 scopus 로고    scopus 로고
    • EQUAL: a case based contractor pre-qualifier
    • Ng S.T. EQUAL: a case based contractor pre-qualifier. Automat Construct 10 (2001) 443-457
    • (2001) Automat Construct , vol.10 , pp. 443-457
    • Ng, S.T.1
  • 34
    • 84993073505 scopus 로고    scopus 로고
    • Neural network model for contractors' pre-qualification for local authority projects
    • Khosrowshahi F. Neural network model for contractors' pre-qualification for local authority projects. Eng Construct Architect Manage 6 3 (1999) 315
    • (1999) Eng Construct Architect Manage , vol.6 , Issue.3 , pp. 315
    • Khosrowshahi, F.1
  • 36
    • 16244363585 scopus 로고
    • The legitimacy of rank reversal - a comment
    • Belton V., and Gear T. The legitimacy of rank reversal - a comment. Omega 13 3 (1985) 143-144
    • (1985) Omega , vol.13 , Issue.3 , pp. 143-144
    • Belton, V.1    Gear, T.2
  • 37
    • 34248379915 scopus 로고    scopus 로고
    • Dyer JS, Wendel RE. A critique of the analytical hierarchy process. Working paper 847, 85-4-24, Department of Management, The University of Texas at Austin, 1985.
  • 38
    • 0023451328 scopus 로고
    • The theory of ratio scale estimation: Saaty's analytic hierarchy process
    • Harker P.T., and Vargas L.G. The theory of ratio scale estimation: Saaty's analytic hierarchy process. Manage Sci 33 1 (1987) 1383-1403
    • (1987) Manage Sci , vol.33 , Issue.1 , pp. 1383-1403
    • Harker, P.T.1    Vargas, L.G.2
  • 39
    • 0000662921 scopus 로고
    • Some comments on Saaty's AHP
    • Perez J. Some comments on Saaty's AHP. Manage Sci 41 6 (1995) 1091-1095
    • (1995) Manage Sci , vol.41 , Issue.6 , pp. 1091-1095
    • Perez, J.1
  • 41
    • 34248391635 scopus 로고    scopus 로고
    • Koehn P. Combining genetic algorithms and neural networks: the encoding problem. MSc thesis, The University of Tennessee, Knoxville, 1994.
  • 42
    • 0033115883 scopus 로고    scopus 로고
    • Pattern recognition with neural networks combined by genetic algorithm
    • Cho S. Pattern recognition with neural networks combined by genetic algorithm. Fuzzy Sets Syst 103 (1999) 339-347
    • (1999) Fuzzy Sets Syst , vol.103 , pp. 339-347
    • Cho, S.1
  • 43
    • 0000836083 scopus 로고    scopus 로고
    • Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector
    • Bee-Hua C. Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector. Construct Manage Econom 18 (2000) 209-217
    • (2000) Construct Manage Econom , vol.18 , pp. 209-217
    • Bee-Hua, C.1
  • 44
    • 0037255164 scopus 로고    scopus 로고
    • Genetic algorithms and hybrid neural network modelling for aluminium stress-strain prediction
    • Yang Y., Linkens D., and Mahfouf M. Genetic algorithms and hybrid neural network modelling for aluminium stress-strain prediction. Process Inst Mech Eng 217 1 (2002)
    • (2002) Process Inst Mech Eng , vol.217 , Issue.1
    • Yang, Y.1    Linkens, D.2    Mahfouf, M.3
  • 45
  • 46
    • 0000924513 scopus 로고
    • A critical survey on the status of multiple decision making theory and practice
    • Stewart T. A critical survey on the status of multiple decision making theory and practice. OMEGA-Int J Manage Sci 20 (1992) 569-586
    • (1992) OMEGA-Int J Manage Sci , vol.20 , pp. 569-586
    • Stewart, T.1
  • 47
    • 0001886332 scopus 로고
    • Using the analytic hierarchy process to structure the supplier selection procedure
    • Nydick R.L., and Hill R.P. Using the analytic hierarchy process to structure the supplier selection procedure. Int J Purchasing Mater Manage, Spring (1992) 31-36
    • (1992) Int J Purchasing Mater Manage, Spring , pp. 31-36
    • Nydick, R.L.1    Hill, R.P.2
  • 48
    • 34248360587 scopus 로고    scopus 로고
    • Mascoll SG. Organizational structural and contracts for construction projects and their selection. Ph.D. thesis. University of Leeds Department of Civil Engineering, 1984.
  • 49
    • 0348039960 scopus 로고    scopus 로고
    • Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey
    • Kahramana C., Cebecia U., and Ruanb D. Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey. Int J Prod Econom 87 (2004) 171-184
    • (2004) Int J Prod Econom , vol.87 , pp. 171-184
    • Kahramana, C.1    Cebecia, U.2    Ruanb, D.3
  • 53
    • 0022328021 scopus 로고
    • A comparison of the analytic hierarchy process and a simple multi-attribute value function
    • Belton V. A comparison of the analytic hierarchy process and a simple multi-attribute value function. Eur J Oper Res 26 (1986) 7-21
    • (1986) Eur J Oper Res , vol.26 , pp. 7-21
    • Belton, V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.