-
1
-
-
0030835107
-
A closer look at the use of data envelopment analysis for technology selection
-
Baker, R.C. and Talluri, S. (1997) 'A closer look at the use of data envelopment analysis for technology selection', Computers and Industrial Engineering, Vol. 32, No. 1, pp.101-108. (Pubitemid 127422472)
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.1
, pp. 101-108
-
-
Baker, R.C.1
Talluri, S.2
-
2
-
-
64249170376
-
Contractor selection with multi criteria decision support tools
-
Baykasoglu, A. Ozbay, E., Gogus, T. and Oztas, A. (2009) 'Contractor selection with multi criteria decision support tools', Int. J. Industrial and Systems Engineering, Vol. 4, No. 2, pp.174-197.
-
(2009)
Int. J. Industrial and Systems Engineering
, vol.4
, Issue.2
, pp. 174-197
-
-
Baykasoglu, A.1
Ozbay, E.2
Gogus, T.3
Oztas, A.4
-
3
-
-
7544243455
-
Attribute based specification, comparison and selection of a robot
-
Bhangale, P.P. Agrawal, V.P. and Saha, S.K. (2004) 'Attribute based specification, comparison and selection of a robot', Mechanism and Machine Theory, Vol. 39, No. 12, pp.1345-1366.
-
(2004)
Mechanism and Machine Theory
, vol.39
, Issue.12
, pp. 1345-1366
-
-
Bhangale, P.P.1
Agrawal, V.P.2
Saha, S.K.3
-
4
-
-
27844444815
-
Integrating AHP with QFD for robot selection under requirement perspective
-
DOI 10.1080/00207540500137217
-
Bhattacharya, A. Sarkar, B. and Mukherjee, S.K. (2005) 'Integrating AHP with QFD for robot selection under requirement perspective', Int. J. Production Research, Vol. 43, No. 17, pp.3671-3685. (Pubitemid 41648303)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.17
, pp. 3671-3685
-
-
Bhattacharya, A.1
Sarkar, B.2
Mukherjee, S.K.3
-
5
-
-
77955430902
-
A modified VIKOR method for multiple criteria analysis
-
Chang, C-L. (2010) 'A modified VIKOR method for multiple criteria analysis', Environmental Monitoring and Assessment, Vol. 168, Nos. 1-4, pp.339-344.
-
(2010)
Environmental Monitoring and Assessment
, vol.168
, Issue.1-4
, pp. 339-344
-
-
Chang, C.-L.1
-
6
-
-
67649398758
-
Selection of materials using compromise ranking and outranking methods
-
Chatterjee, P. Athawale, V.M. and Chakraborty, S. (2009) 'Selection of materials using compromise ranking and outranking methods', Materials and Design, Vol. 30, No. 10, pp.4043-4053.
-
(2009)
Materials and Design
, vol.30
, Issue.10
, pp. 4043-4053
-
-
Chatterjee, P.1
Athawale, V.M.2
Chakraborty, S.3
-
7
-
-
79955540489
-
Selection of industrial robots using compromise ranking and outranking methods
-
Chatterjee, P. Athawale, V.M. and Chakraborty, S. (2010) 'Selection of industrial robots using compromise ranking and outranking methods', Robotics and Computer-Integrated Manufacturing, Vol. 26, No. 5, pp.483-489.
-
(2010)
Robotics and Computer-Integrated Manufacturing
, vol.26
, Issue.5
, pp. 483-489
-
-
Chatterjee, P.1
Athawale, V.M.2
Chakraborty, S.3
-
8
-
-
0037274844
-
A fuzzy TOPSIS method for robot selection
-
Chu, T-C. and Lin, Y-C. (2003) 'A fuzzy TOPSIS method for robot selection', Int. J. Advanced Manufacturing Technology, Vol. 21, No. 4, pp.284-290.
-
(2003)
Int. J. Advanced Manufacturing Technology
, vol.21
, Issue.4
, pp. 284-290
-
-
Chu, T.-C.1
Lin, Y.-C.2
-
9
-
-
42649134524
-
Application of multicriteria decision making for selection of robotic system using fuzzy analytic hierarchy process
-
Dev Anand, M., Selvaraj, T., Kumanan, S. and Austin Johnny, M. (2008) 'Application of multicriteria decision making for selection of robotic system using fuzzy analytic hierarchy process', Int. J. Management and Decision Making, Vol. 9, No. 1, pp.75-98.
-
(2008)
Int. J. Management and Decision Making
, vol.9
, Issue.1
, pp. 75-98
-
-
Dev Anand, M.1
Selvaraj, T.2
Kumanan, S.3
Austin Johnny, M.4
-
10
-
-
0000949591
-
Analytic hierarchy process for robot selection
-
Goh, C-H. (1997) 'Analytic hierarchy process for robot selection', Journal of Manufacturing Systems, Vol. 16, No. 5, pp.381-386. (Pubitemid 127448829)
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.5
, pp. 381-386
-
-
Goh, C.-H.1
-
11
-
-
0030127493
-
A revised weighted sum decision model for robot selection
-
DOI 10.1016/0360-8352(95)00167-0
-
Goh, C-H., Tung, Y-C.A. and Cheng, C-H. (1996) 'A revised weighted sum decision model for robot selection', Computers and Industrial Engineering, Vol. 30, No. 2, pp.193-199. (Pubitemid 126403200)
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.2
, pp. 193-199
-
-
Goh, C.-H.1
Tung, Y.-C.A.2
Cheng, C.-H.3
-
12
-
-
34248221552
-
Fuzzy multi-criteria evaluation of industrial robotic systems
-
DOI 10.1016/j.cie.2007.01.005, PII S0360835207000162
-
Kahraman, C., Çevik, S., Ates, N.Y. and Gülbay, M. (2007) 'Fuzzy multi-criteria evaluation of industrial robotic systems', Computers and Industrial Engineering, Vol. 52, No. 4, pp.414-433. (Pubitemid 46719705)
-
(2007)
Computers and Industrial Engineering
, vol.52
, Issue.4
, pp. 414-433
-
-
Kahraman, C.1
Cevik, S.2
Ates, N.Y.3
Gulbay, M.4
-
13
-
-
33745310948
-
Choquet integral-based decision making approach for robot selection
-
Knowledge-Based Intelligent Information and Engineering Systems - 9th International Conference, KES 2005, Proceedings
-
Karsak, E.E. (2005) 'Choquet integral-based decision making approach for robot selection', Knowledge-based Intelligent Information and Engineering Systems, Lecture Notes in Computer Science, Vol. 3682, pp.635-641. (Pubitemid 43935539)
-
(2005)
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
, vol.3682 LNAI
, pp. 635-641
-
-
Karsak, E.E.1
-
14
-
-
36249007368
-
Robot selection using an integrated approach based on quality function deployment and fuzzy regression
-
DOI 10.1080/00207540600919571, PII 770289099
-
Karsak, E.E. (2008) 'Robot selection using an integrated approach based on quality function deployment and fuzzy regression', Int. J. Production Research, Vol. 46, No. 3, pp.723-738. (Pubitemid 350136946)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.3
, pp. 723-738
-
-
Karsak, E.E.1
-
15
-
-
0029207413
-
The use of data envelopment analysis for technology selection
-
Khouja, M. (1995) 'The use of data envelopment analysis for technology selection', Computers and Industrial Engineering, Vol. 28, No. 1, pp.123-132.
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.1
, pp. 123-132
-
-
Khouja, M.1
-
16
-
-
0000792715
-
Fuzzy clustering procedure for evaluation and selection of industrial robots
-
Khouja, M. and Booth, D.E. (1995) 'Fuzzy clustering procedure for evaluation and selection of industrial robots', Journal of Manufacturing Systems, Vol. 14, No. 4, pp.244-251.
-
(1995)
Journal of Manufacturing Systems
, vol.14
, Issue.4
, pp. 244-251
-
-
Khouja, M.1
Booth, D.E.2
-
17
-
-
79955532896
-
Optimal selection of robots by using distance based approach method
-
Kumar, R. and Garg, R.K. (2010) 'Optimal selection of robots by using distance based approach method', Robotics and Computer-Integrated Manufacturing, Vol. 26, No. 5, pp.500-506.
-
(2010)
Robotics and Computer-Integrated Manufacturing
, vol.26
, Issue.5
, pp. 500-506
-
-
Kumar, R.1
Garg, R.K.2
-
18
-
-
73249127790
-
Application of multicriteria decision-making techniques to manoeuvre planning in nonholonomic robots
-
Martín Ramos, J.M., López García, D., Gómez-Bravo, F. and Morón, A.B. (2010) 'Application of multicriteria decision-making techniques to manoeuvre planning in nonholonomic robots', Expert Systems with Applications, Vol. 37, No. 5, pp.3962-3976.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.5
, pp. 3962-3976
-
-
Martín Ramos, J.M.1
López García, D.2
Gómez-Bravo, F.3
Morón, A.B.4
-
19
-
-
34250835157
-
An AHP model for quantification of benefits of World-class Maintenance Systems
-
DOI 10.1504/IJISE.2007.011926
-
Mishra, R.P. Anand, G. and Kodali, R. (2007) 'An AHP model for quantification of benefits of world-class maintenance systems', Int. J. Industrial and Systems Engineering, Vol. 2, No. 2, pp.166-194. (Pubitemid 46978849)
-
(2007)
International Journal of Industrial and Systems Engineering
, vol.2
, Issue.2
, pp. 166-194
-
-
Mishra, R.P.1
Anand, G.2
Kodali, R.3
-
20
-
-
1442283191
-
Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS
-
Opricovic, S. and Tzeng, G.H. (2004) 'Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS', European Journal of Operational Research, Vol. 156, No. 2, pp.445-455.
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.2
, pp. 445-455
-
-
Opricovic, S.1
Tzeng, G.H.2
-
21
-
-
33751011060
-
Extended VIKOR method in comparison with outranking methods
-
DOI 10.1016/j.ejor.2006.01.020, PII S0377221706000555
-
Opricovic, S. and Tzeng, G.H. (2007) 'Extended VIKOR method in comparison with outranking methods', European Journal of Operational Research, Vol. 178, No. 2, pp.514-529. (Pubitemid 44750475)
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.2
, pp. 514-529
-
-
Opricovic, S.1
Tzeng, G.-H.2
-
22
-
-
0033159980
-
Decision-making and performance measurement models with applications to robot selection
-
Parkan, C. and Wu, M-L. (1999) 'Decision-making and performance measurement models with applications to robot selection', Computers and Industrial Engineering, Vol. 36, No. 3, pp.503-523. (Pubitemid 129303999)
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.3
, pp. 503-523
-
-
Parkan, C.1
Wu, M.-L.2
-
24
-
-
45049083553
-
A decision making methodology for material selection using an improved compromise ranking method
-
Rao, R.V. (2008) 'A decision making methodology for material selection using an improved compromise ranking method', Materials and Design, Vol. 29, No. 10, pp.1949-1954.
-
(2008)
Materials and Design
, vol.29
, Issue.10
, pp. 1949-1954
-
-
Rao, R.V.1
-
25
-
-
64249119255
-
Flexible manufacturing system selection using an improved compromise ranking method
-
Rao, R.V. (2009a) 'Flexible manufacturing system selection using an improved compromise ranking method', Int. J. Industrial and Systems Engineering, Vol. 4, No. 2, pp.198-215.
-
(2009)
Int. J. Industrial and Systems Engineering
, vol.4
, Issue.2
, pp. 198-215
-
-
Rao, R.V.1
-
26
-
-
70350744155
-
An improved compromise ranking method for evaluation of environmentally conscious manufacturing programs
-
Rao, R.V. (2009b) 'An improved compromise ranking method for evaluation of environmentally conscious manufacturing programs', Int. J. Production Research, Vol. 47, No. 16, pp.4399-4412.
-
(2009)
Int. J. Production Research
, vol.47
, Issue.16
, pp. 4399-4412
-
-
Rao, R.V.1
-
27
-
-
33644750180
-
Selection, identification and comparison of industrial robots using digraph and matrix methods
-
DOI 10.1016/j.rcim.2005.08.003, PII S0736584505000633
-
Rao, R.V. and Padmanabhan, K.K. (2006) 'Selection, identification and comparison of industrial robots using digraph and matrix methods', Robotics and Computer-Integrated Manufacturing, Vol. 22, No. 4, pp.373-383. (Pubitemid 43343782)
-
(2006)
Robotics and Computer-Integrated Manufacturing
, vol.22
, Issue.4
, pp. 373-383
-
-
Rao, R.V.1
Padmanabhan, K.K.2
-
28
-
-
70349437207
-
Group decision making process for supplier selection with VIKOR under fuzzy environment
-
Sanayei, A., Mousavi, S.F. and Yazdankhah, A. (2010) 'Group decision making process for supplier selection with VIKOR under fuzzy environment', Expert Systems with Applications, Vol. 37, No. 1, pp.24-30.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.1
, pp. 24-30
-
-
Sanayei, A.1
Mousavi, S.F.2
Yazdankhah, A.3
-
29
-
-
58649090867
-
Extension of VIKOR method for decision making problem with interval numbers
-
Sayadi, M.K. Heydari, M. and Shahanaghi, K. (2009) 'Extension of VIKOR method for decision making problem with interval numbers', Applied Mathematical Modelling, Vol. 33, No. 5, pp.2257-2262.
-
(2009)
Applied Mathematical Modelling
, vol.33
, Issue.5
, pp. 2257-2262
-
-
Sayadi, M.K.1
Heydari, M.2
Shahanaghi, K.3
-
30
-
-
35348950938
-
Incremental analysis for MCDM with an application to group TOPSIS
-
DOI 10.1016/j.ejor.2007.02.012, PII S0377221707002202
-
Shih, H-S. (2008) 'Incremental analysis for MCDM with an application to group TOPSIS', European Journal of Operational Research, Vol. 186, No. 2, pp.720-734. (Pubitemid 47615324)
-
(2008)
European Journal of Operational Research
, vol.186
, Issue.2
, pp. 720-734
-
-
Shih, H.-S.1
-
32
-
-
0030419282
-
Genetic algorithm for robot selection and work station assignment problem
-
Zhao, L., Tsujimura, Y. and Gen, M. (1996) 'Genetic algorithm for robot selection and work station assignment problem', Computers and Industrial Engineering, Vol. 31, Nos. 3/4, pp.599-602. (Pubitemid 126651665)
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.3-4
, pp. 599-602
-
-
Zhao, L.1
Tsujimura, Y.2
Gen, M.3
|